Sol_140P2124Q0031_Amd_0001.pdf
PDF 161 KB Posted
- Solicitation number
- 140P2124Q0031
About this file
This document contains questions and answers regarding a solicitation for providing pressure treated timber to Petroglyph National Monument. The solicitation seeks 8" x 8" x 20' lumber that must be either treated pine or fir, with a water-borne treated use category of UC4C for ground contact timbers. The lumber must be rough cut and incised for higher treatment retention. Hem-fir is acceptable, with low to no cracks allowed. Inspection will be according to Pacific Lumber Inspection Bureau grading rules for fir. The National Park Service is the contracting agency, with delivery required within 8 hours of Albuquerque, NM.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P2124Q0031_Amd_0002.pdf | ||
| Sol_140P2124Q0031.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2124Q0031 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
WA2
Frederick MD 21704 4801A Urbana Pike DOI, NPS, Historic Pres Trng Ctr
PWA
Denver CO 80225 P.O.Box 25287 MS WCP NPS, WASO - WCP Contracting
01/04/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/20/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to provide questions and answers regarding this requirement. All other terms and conditions remain the same.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
David Clark
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Questions
What kind of treatment do they want and retention? Ground contact needs a higher retention rate than if it is off the ground.
2 Do you want rough or surfaced?
Is incised ok? Incising, small incisions mechanically put into the wood, helps the treatment get into the wood for a higher retention
Is Hem/Fir ok? Douglas Fir is harder to treat and may require a different kind of treatment.
Do they want free of heart center (FOHC) on the timbers?
Timbers are more stable if the center of the tree is not in it.
Are there specifications for what type of pressure treatment you would like?
Can the government supply a forklift for unloading the truck at the delivery site?
Would fir douglas be considered appropriate for the specifications outlined in the solicitation?
9 Are there any allowances for cracks in the timber?
can the customer inspect the material before delivery to ensure that the quality meets their standards?
11 Is this stock Full Sawn Rough, Standard Sawn Rough or S4S?
12 Is this stock green or kiln dried prior to treatment?
13 What treatment is required, i.e. ACZA, CA-C, Creosote, Penta, etc.?
14 What is the required treatment retention?
Do you have a staging area where the lumber will be placed? Or is the expectation to simply place the lumber on the floor within 100' radius of the delivery as stated in the solicitation?
The solicitation outlines that the lumber will be inspected according to the
Northeastern Lumber Manufacturers Association standard Grading Rules.
This association mainly focuses on lumber grading for White pine lumber.
In the event the provided lumber is Fir, would the grading be based on a different rule, such as the Pacific Lumber Inspection Bureau grading?
Pacific lumber grading.
full sawn rough
Green
Water borne, azca
Treatment retention is UC4C
We have a staging area in our shop and a forklift we can take them off and stage ourselves
Questions for Window Lead Abatement
Water-borne treated use category UC4C for ground contact timbers.
Rough.
Incised for higher treatment retention.
Hem/Fir is acceptable for our application.
Low to no cracks.
No, unless they are within 8 hours of Albuquerque NM.
Yes.
Answers
Water-borne treated use category UC4C for ground contact timbers.
Yes.
Yes, Hem/Fir is also acceptable for our application.
File details come from the government source that posted it. Updated .