JELA_-_RFI_Questions_2.docx
DOCX document 17 KB Posted
- Solicitation number
- 140P2025R0110
About this file
This document is a Request for Information (RFI) for the Rehabilitation of the Chalmette National Cemetery in Louisiana, issued by the Department of the Interior National Park Service. The RFI contains 19 detailed questions for potential contractors, focusing on critical aspects of the project including construction phasing, scheduling, headstone re-alignment, grading, storm drainage installation, and wall stabilization. Key areas of inquiry include mitigative measures to limit visitor impacts during construction, project phasing, construction timeline, staging areas, potential long-lead items, project risks, and specific technical challenges related to soil subsidence, trenching, drainage pipe installation, and historic site preservation.
The RFI seeks contractors' insights on complex rehabilitation work within a historic cemetery, with responses due by September 9, 2025. Questions probe contractors' experience with historic cemetery projects, potential construction solutions, cost efficiencies, and any reservations about bidding. The document demonstrates a comprehensive approach to gathering technical and logistical input from potential contractors before formal solicitation, aimed at understanding potential challenges, innovative approaches, and project feasibility for the Chalmette National Cemetery rehabilitation project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions to Contractors – Response Due Sept 9, 2025 All responses will be kept confidential Construction Phasing and Scheduling
1. What mitigative measures might you suggest to limit visitor impacts during construction?
2. How do you envision phasing this project and the sequence of construction while keeping it generally open to the public?
3. How long do you think the full project will take?
4. Do you feel the proposed laydown/staging will be sufficient. Do you anticipate more than one?
5. What elements of the project do you foresee will experience long leads and/or significant price volatility based on similar projects that could impact schedule?
6. What do you see as the highest risk items?
7. Anything we can do to make this easier – reduce risk?
Headstone Re-alignment and Grading
8. For the resetting of the grave markers, are there any novel methods you have used to limit subsidence?
9. Soil subsidence has been an ongoing challenge in relation to headstone alignment and trenching, are there any solutions not presented that should be considered?
Storm Drainage
11. For the proposed stormwater drainage pipe under Military Cemetery Rd, what do you expect for a trench width?
12. What shoring practices do you foresee for the storm drainage trenching?
13. Related to the trenching and storm drainage installation, do you foresee any clearance issues related to fixed elements such as the historic brick curb, existing historic trees, etc?
14. Do you foresee any issues or challenges in installing the backflow prevention into CB3 and 4 with limited clearance and an existing pipe?
Wall Stabilization
14. There will be limited underpinning of the historic walls, do you see challenges, issues and or solutions working in deltaic soils or in proximity to adjacent resources?
15. Are there any cost efficiencies related to the wall underpinning?
General
16. Are there other construction solutions that should be considered that have not been presented? If so, what are the potential benefits, i.e. cost savings, schedule savings, safety concerns, etc.
17. Do you have experience working within historic cemeteries?
18. What would make you hesitant or not to propose/bid on this project?
19. Anything else that we need to know and or/didn’t ask?