A14_SSN_ACAD_255256_Sewer_Line_1.pdf

PDF 157 KB Posted

Attached to
ACAD 255256 - Replace Harden Farm Sewage System Federal contract opportunity
Solicitation number
140P2025R0044
Issued by
Department of the Interior National Park Service National Office

About this file

This is a Sources Sought Notice from the National Park Service (NPS) Denver Service Center for replacing the Harden Farm sewage system with a connection to municipal facilities at Acadia National Park in Maine. The project, valued between $1M-$5M, involves constructing a new sewer pump station and forcemain to serve employee housing, extending three-phase electrical service along Kebo Street, and demolishing existing septic systems.

The project falls under NAICS code 237110 with a $45M small business size standard. Responses are due by January 6th, 2025 at Noon ET. NPS anticipates issuing an RFP in Spring 2025 and will require bid, performance, and payment bonds. Interested businesses must submit company information, business classification status, bonding capacity statement, relevant experience, and optional marketing materials to Tony Jasper, Contracting Officer. The government will use responses to determine potential small business set-aside opportunities. No cost reimbursement is available for responses to this market research.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

12795 W. ALAMEDA PKWY

P.O. BOX 25287

DENVER, COLORADO 80225-0287

In Reply Refer to:

D5215 (DSC-CS)

ACAD 255256

Date: 12/18/2024

To: General Public (Via the Government’s Point Entry)

From: Tony Jasper, Contracting Officer, National Park Service, Denver Service Center

Subject: Sources Sought Notice

Reference: ACAD 255256 - Replace Harden Farm Sewage System With Connection to

Municipal Facilities

This is a Sources Sought Notice (SSN) for the purpose of conducting market research. Proposals are NOT being requested, nor accepted at this time. Responses are being requested from both large and small businesses.

Purpose: The purpose of this notice is to gain knowledge regarding the type of interested businesses and their qualifications. The National Park Service (NPS) will use information obtained through this notice to develop an acquisition strategy.

The Government anticipates conducting a competitive acquisition for this requirement. The amount of interest or lack thereof will determine the possibility of a small business or other socio-economical small business set-aside for the solicitation. Analysis of the quality of responses to this source sought announcement will be considered in the market research being conducted, and in the making of any small business set-aside determination for this requirement.

Additional Information: No proposal package, solicitation, specification or drawings are available with this notice.

Cost Reimbursement: Response to this announcement is strictly voluntary; no reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow-up information requests.

North American Industry Classification System (NAICS) code: 237110 – Water and Sewer Line and Related Structures Construction

Small Business Size Standard: $45,000,000

Solicitation: The NPS anticipates issuing a request for proposals in the Spring of 2025

Bonding: The NPS anticipates bid, performance and payment bonds will be required

Project Description:

The project is located at Acadia National Park in Maine.

The construction magnitude is between $1M and $5M.

The employee housing project at Harden Farm is currently being constructed in Bar Harbor, ME. The work under this project includes construction of a new sewer pump station and sewer forcemain to serve current and future sewer demand for year-round employee housing. The new sewer pump station wet well will be connected to a gravity sewer network to be installed in the housing development under separate contract. The sewer forcemain will be connected to an existing sewer manhole in the Municipal system. This work will include extension to the three-phase electrical service along Kebo Street as well as electrical and mechanical work to support the new pump station. After completion of the new pump station and forcemain the existing septic and pre-treatment tanks and drip hose disposal system shall be demolished.

Submittal Contents: Interested (small and large) businesses should submit the following information:

(1) Company name, UEI number, address, point of contact, telephone number, and email address.

(2) Business type: Classification as a Large or Small Business under the above listed NAICS, Small Business

Administration (SBA) certified Historically Underutilized Business Zone (HUBZone), Veteran-Owned Small Businesses (VOSB), Service-Disabled Veteran-Owned Small Businesses (SDVOSB), SBA certified Woman Owned Small Business (WOSB), Economically Disadvantaged Woman Owned Small Business (EDWOSB). The size of a small business firm includes all parents, subsidiaries, affiliates, etc.—see 13 CFR 121.108.)

Misrepresentation of size status can result in penalties.

(3) Statement regarding your company’s bonding capacity. Letters from bonding companies are not required at this time.

(4) Information demonstrating experience and capability on projects of same or similar size, scope and magnitude, and constructed under similar conditions.

(5) In addition businesses may submit existing marketing materials such as capability statements and brochures.

Submittal Due Date/Time: January 6th, 2025 at Noon ET.

Submit To: Tony Jasper, Contracting Officer (tony_jasper@nps.gov)

File details come from the government source that posted it. Updated .