This document is a Request for Proposals (RFP) for the Lake Mead National Recreation Area Callville Bay Barge Relocation project. The solicitation seeks a contractor to temporarily relocate an existing barge to meet seasonal low lake levels, which requires extending and upsizing existing electrical lines, replacing electrical transformers, and installing a new service road and standby generator. The project includes additional scope to move the water intake barge location to allow drinking water production at 950 feet above sea level, with a minimum 30-foot water depth, and will involve constructing a new barge and raw water transmittance lines.

Key solicitation details include proposals due on May 23, 2025, at 2:00 PM MD, with a contract completion timeline of 580 days after award. The government will use a trade-off best value evaluation approach, with evaluation factors including technical approach, project experience, past performance, management approach, schedule, and safety. Liquidated damages are set at $1,619 per calendar day of delay. The contract will be administered by the National Park Service, with electronic proposals to be submitted to the Contracting Officer Mark Barber and Contracting Specialist Gabriel Castellanos.

View the file

Other files

File Type Posted
Sol_140P2025R0016_Amd_0008.pdf PDF
B09_Amd_7_LAKE_254108_Q_A_FINAL_6_17_25_0007.xlsx XLSX spreadsheet
Sol_140P2025R0016_Amd_0007.pdf PDF
B09_Contractor_Use_Areas_Clarification_0006.pdf PDF
B09_CB_Barge-Existing_0006.pdf PDF
Sol_140P2025R0016_Amd_0006.pdf PDF
B09_Drawings_09212016_0006.pdf PDF
B09_Amd_6_LAKE_254108_Q_A_FINAL_0006.xlsx XLSX spreadsheet
Sol_140P2025R0016_Amd_0005.pdf PDF
B09_Amd_5_LAKE_254108_Q_A_5_27_25_0005.xlsx XLSX spreadsheet
Sol_140P2025R0016_Amd_0004.pdf PDF
B09_Solit_General_Refs_0004.doc DOC document
Sol_140P2025R0016_Amd_0003.pdf PDF
B09_Site_Visit_Sign_in_Sheet_4_29_205_0003.pdf PDF
B09_Atch_1_Specifications_Final_Rev2_0003.pdf PDF
Sol_140P2025R0016_Amd_0002.pdf PDF
B09_Atch_2_Construction_Drawings_Final_Rev1_0001.pdf PDF
B09_Atch_1_Specifications_Final_Rev1_0001.pdf PDF
Sol_140P2025R0016_Amd_0001.pdf PDF
B08_Atch_7_Solit_PSP_Vol_I_PastPerf_REQD.docx DOCX document
B09_Atch_9_Callville_Bay_Bid_Addendum__1_03-24-25.pdf PDF
Sol_140P2025R0016.pdf PDF
B08_SF_1442_LAKE_254108_Callville_Barge_RV4___Clause_set.pdf PDF
B08_Atch_1_Final_Specifications_V2.pdf PDF
B08_Atch_6_Solit_PSP_Vol_I_Exp_REQD.docx DOCX document
B08_Atch_3_Clark_County_Wage_Determination_3_14_25.pdf PDF
B08_Atch_4_Contract_Price_Schedule.xlsx XLSX spreadsheet
B08_Atch_2_Final_Construction_Drawings.pdf PDF
B08_Atch_5_Small_Business_Subcontracting_Limitation_Report_DOI_v03.xlsx XLSX spreadsheet
B08_Atch_8_Bid_bond_SF24-23a.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Location:

Callville Bay is located on the northwest shore of Lake Mead along Northshore Road and can easily be accessed from the Lake

Mead Parkway or Lake Mead Boulevard Entrance Station

Responses to questions during the site visit do not change the solicitation document

Changes to the solicitation document shall be made by formal written amendment only

Preproposal Conference/Site Visit meeting notes, attendance sheet, questions, and answers will be issued by a formal written amendment to the solicitation for information only

Preproposal Conference/ Site Visit- Tuesday, April 29, 2025

Request for Proposals No.

140P2025R0016

CO: Mark Barber mark_barber@nps.gov

CS: Gabriel Castellanos gabriel_castellanos@nps.gov

QUESTIONS AFTER

PREPROPOSAL CONFERENCE

• Direct all questions to both Mark Barber, Contracting Officer, and Gabriel Castellanos, Contracting Specialist. Please submit all questions not later than 5/13/25.

• Questions directed to any other Government team member will be redirected to Mr. Barber or Mr.

Castellanos. No answers will be provided by any other team member.

All questions and answers will be provided to all prospective offerors by amendment to the solicitation

• Request for Proposal (Solicitation Document) shall only be changed by formal amendment issued by the Contracting Officer at the website – www.SAM.gov

Award of a Contract:

Trade off Best Value to the Government.

Alternate proposals shall not be accepted or evaluated

The government intends to evaluate proposals and award a contract without discussions with offerors, therefore the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The government reserves the right to conduct discussions if the CO later determines them to be necessary.

Relocate Callville Bay Barge, Lake Mead National Recreational Area, LAKE 254108

52.211-10 Commencement, Prosecution, and Completion of Work - Commence work within 10 days after NTP. Complete not later than 580 days after award.

52.211-12 Liquidated Damages – Construction - If contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,619.00 for each calendar day of delay until the work is completed or accepted.

Special Requirement 1 – OPTION FOR

ADDITIONAL SERVICES—SEPARATELY PRICED

LINE ITEMS: The Government may require the delivery of the numbered line items identified in the Schedule as option items at the price stated in the Schedule. The Contracting Officer may unilaterally exercise the option by written notice to the Contractor within 180 days after contract award.

Performance of added line-item tasks shall be at the price negotiated in the contract Schedule.

DIAR 1452.228-70 – Liability Insurance: The contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the CO by an insurance company which is acceptable to the CO. The amounts of insurance shall be not less than:

$100,000 each person $500,000 each occurrence $1,000,000 property damage

52.225-11 Buy American – Construction Materials Under Trade Agreements – Refer to Clause for specific requirements

Clauses Section L Instructions for the Submission of Offers Proposals Due May 23, 2025, 14:00 PM

MD.

Volume I – Non-Price Proposal Volume II - Business and Price Proposal Alternate proposals SHALL NOT be considered.

Government may award without discussion.

Send electronic proposals to:

gabriel_castellanos@nps.gov Mark_Barber@nps.gov

Submissions shall contain the solicitation number, park-PMIS, and number of total emails (example in solicitation)

Evaluation Factors: The evaluation factors are correlated to the proposal preparation instructions. Factors 1-6 are in descending order in importance.

Overall: All evaluation factors, other than price, when combined are approximately equally important to price.

FACTOR 1 –TECHNICAL APPROACH

FACTOR 2 – PROJECT EXPERIENCE

FACTOR 3 – PAST PERFORMANCE

FACTOR 4 – MANAGEMENT APPROACH

FACTOR 5 – SCHEDULE

FACTOR 6 – SAFETY

Refer to solicitation for specific information on submission requirements and evaluation.

SUBMISSION AND EVALUATION

OVERVIEW OF PROJECT

This project includes temporary relocation of the existing barge to an appropriate distance to meet the seasonal low lake level. This relocation requires existing electrical lines to be extended and upsized, an existing electrical transformer will be replaced with by a 3rd party power provider, and an existing standby generator will be replaced with new appropriately positioned generator. The existing service road will be enhanced to provide access to the new transformer site. The increased length of electrical lines and resulting voltage drop will require the upgraded transformer, as mentioned above, to be completed at the time of the temporary barge relocation.

Additional scope will move the Callville Bay water intake barge location to deeper water to allow for drinking water production at lake elevation of 950 feet above sea level with a minimum of 30-feet of water depth below the new barge location. A new barge will be provided, existing raw water transmittance lines will be extended to the new barge. The barge relocation will also necessitate construction of a moored breakwater. This project will also provide a UV reactor to eliminate Quagga mussel infestation of the water supply system.