This document is a Pre-Solicitation Notice for a federal contract opportunity issued by the National Park Service (NPS), Department of the Interior, Denver Service Center.

The proposed contract is for the rehabilitation of the Sugarlands Headquarters and the Sugarlands Water and Wastewater Systems at Great Smoky Mountains National Park in Gatlinburg, Tennessee. The project scope includes upgrading the HVAC system, electrical service, building finishes, and water/sewer infrastructure. The estimated construction magnitude is over $10 million with a period of performance of 550 calendar days. The solicitation will be issued electronically through the System for Award Management (SAM) website, with proposal documents available in various digital formats. A pre-proposal meeting may be scheduled. This is an unrestricted full and open competition, with small business subcontracting encouraged. The proposed solicitation issue date is estimated to be on or about May 29, 2024, subject to funding availability.

View the file

Other files

File Type Posted
B01_Synopsis_PreSolitNotice__GRSM_149285_149368_2.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

12795 W. ALAMEDA PKWY

P.O. BOX 25287

DENVER, COLORADO 80225-0287

In Reply Refer to:

D5215 (DSC-CS)

GRSM 149285/149368

ACTION: Pre-Solicitation Notice

PRE-SOLICITATION NUMBER: 140P2024R0032

CLASSIFICATION CODE: Y1AZ – Construction of Other Administrative Facilities and Service Buildings

CONTRACTING OFFICER: Matthew Carpenter

CONTRACT SPECIALIST: Julia Sullivan

DSC-CS Contracting Services Division

National Park Service

P.O. Box 25287

Denver, CO 80225

POINT OF CONTACT: Matthew Carpenter, matthew_carpenter@nps.gov, Julia Sullivan, Julia_sullivan@nps.gov

PLACE OF PERFORMANCE: Great Smoky Mountains National Park, Gatlinburg, Tennessee

PLACE OF PERFORMANCE COUNTRY: USA

Title of Project: GRSM 149368– Rehabilitate Sugarlands Headquarters, GRSM 149285 – Rehab Sugarlands

Water and Wastewater Systems

GENERAL:

The National Park Service (NPS), Department of Interior (DOI), Denver Service Center (DSC), is soliciting proposals on a full and open basis from all interested businesses having the capability to perform the work described below. The solicitation will be issued electronically on the Systems for Awards Management (SAM) website at www.sam.gov. Proposal documents will be available for download in Microsoft Word, HTML, Microsoft Excel, and Adobe PDF; Specifications will be available in Adobe PDF format; and drawings will be available in PDF format. Please Note: Paper copies of the solicitation will not be made available.

Vendors can search for opportunities and award history on www.sam.gov without registering and has an

Interested Vendors List and a Watchlist where you can add your company’s interest. Registering provides the opportunity to receive notifications; this is a tool of convenience only and does not serve as a guarantee of notification. Interested vendors and plan holders are required to visit the website periodically to check for amendments and other changes to the synopsis or solicitation documents.

Prospective offerors desiring to conduct business with the DOI are required to have an active registration in the

Systems for Awards Management (SAM) at www.sam.gov. You are also required to have a DUNS number in order to conduct business with the Federal Government.

http://www.sam.gov/

This pre-solicitation announcement is not a solicitation document, but pre-notice of an upcoming solicitation.

Specific instructions on submitting your proposal will be contained in the solicitation documents to be issued on or after the date listed below.

Proposed Solicitation Issue Date: Estimated on/about May 29, 2024

This is currently an unfunded requirement with a high expectation that funds will be available. When and if funds become available a contract will be awarded at that time.

The NAICS Code for this requirement is 236220 with a size standard of $45 million.

SCOPE:

This project is for GRSM 149368, Rehabilitate Sugarlands Headquarters and GRSM 149285 – Rehab

Sugarlands Water and Wastewater Systems. The project is located at Great Smoky Mountains National Park, TN. The construction magnitude is over $10,000,000.

This project is for rehabilitation of the Great Smoky Mountains National Park Headquarters Campus at the

Sugarlands Visitor Center Area in Gatlinburg, TN. The project includes the restoration, rehabilitation, and upgrade of the existing Headquarters building in the Sugarlands Historic District and construction of associated new utilities for water and wastewater to serve these buildings and the Campus.

The surrounding area is rural with limited staging located at the existing Headquarters parking areas. There are no unique material delivery requirements. The construction site is within 25 of miles from nearest suppliers and lodging facilities. The Headquarters building will not be occupied during construction, but nearby Park buildings remain open, thus contract activities and logistics must be structured and scheduled to minimize visitor impact. The site requires protective measures to ensure the surrounding area remains undisturbed. The

Sugarland Headquarters building is a historic resource.

The anticipated period of performance of 550 calendar days including any potential weather impacts.

Winter construction may be required.

For the existing Headquarters building, a primary project requirement is to upgrade the building HVAC system, and replace electric service panels and components. HVAC upgrades will include replacing plumbing, air conditioning, heating and ventilation, and insulation to meet current codes; and installation of a fire detection and suppression system. Electrical upgrades will include increasing service by replacing the existing service panel with a 600-amp panel; replace sub-panels on the first, second and third floors; replace existing wire and install code compliant conduit; and improve fluctuating grounding systems. The rehabilitation of the facility’s electrical system will meet National Electrical Code requirements for safety and reduce the current maintenance commitment. Additionally, information technology lines and equipment will be provided to a new IT room.

The project will also rehabilitate interior/exterior building finishes, including not limited to: stabilize the foundation, repoint stone masonry; repair roof leaks and damages to roofing material; repair the exterior porches; mitigate the asbestos, radon, lead paint, flammable surfaces and egress problems; and mitigate bat, rodent, and insect intrusion. Exterior finishes requiring rehabilitation include stone masonry, wood timbers, windows, and slate tile roofing. Interior finishes requiring rehabilitation include wood panels, tile, and marble elements. All work performed will be sensitive to the historic fabric.

Accessible access to all three floors will be accomplished via addition of an elevator and rehabilitation of restrooms.

Other components of the scope of the project includes the demolition of the existing Little River Ranger Station with removal of hazardous roofing material.

The work to rehabilitate the water and wastewater systems includes, but is not limited to:

• Replace existing water mains with new HDPE pipe. Some utility alignments are in existing roadways and will require pavement removal and replacement as well as bridge crossings over short spans.

• Installation of water service lines to park residences and administrative buildings.

• Install new valves throughout system.

• Replacement of fire hydrants.

• Replacement of equipment at RV dump station.

• Abandonment of existing system in place.

• Backfilling, re-grading, and seeding.

• Expansion of existing pump house including relocation of electrical equipment.

• Residences will be occupied during construction and the existing water system will remain in operation until the new system is brought online.

Sanitary Sewer:

• Rehabilitation of existing 6” and 8” gravity sewer pipe and manholes (e.g. lining).

• Select pipe replacement and reconnection.

• Select manhole replacement.

• Backfilling, re-grading, and seeding of disturbed areas.

PRICE RANGE: Greater than $10M

PERIOD OF PERFORMANCE: 550 calendar days

Proposal receipt date is not known at this time. The actual date will be established in the solicitation documents.

A pre-proposal meeting may be posted and date/location will be noted in the solicitation or a forthcoming amendment.

This procurement will be competed using an unrestricted Full and Open contracting method.

All responsible sources may submit an offer which, if submitted in a timely manner, will be considered. It is the policy of the government to provide maximum practicable opportunities in its acquisitions to small business, veteran-owned small business, small disadvantaged business, and women-owned small business concerns.

Such concerns must also have the maximum practicable opportunity to participate as subcontractors in the contracts awarded by any executive agency, consistent with efficient contract performance. All offerors are strongly encouraged to contact their local Small Business Administration Office, to post their need for qualified subcontractors at http://www.sba.gov .

http://www.sba.gov/

File details come from the government source that posted it. Updated .