This sources sought notice requests information from interested businesses for the rehabilitation of the Sugarlands Headquarters building and water and wastewater systems at Great Smoky Mountains National Park. The National Park Service seeks to upgrade the headquarters HVAC system, electrical service, interior and exterior finishes, and install an elevator and accessible restrooms. The water and wastewater scope includes replacing water mains with HDPE pipe, installing new valves and fire hydrants, expanding the pump house, and rehabilitating gravity sewer lines. Responses are requested from small and large businesses by December 19, 2023 and should include company information, business type, bonding capacity, and experience on similar projects. The anticipated solicitation for the over $10 million project will be issued in spring 2024, with bid, performance and payment bonds required.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
12795 W. ALAMEDA PKWY
P.O. BOX 25287
DENVER, COLORADO 80225-0287
In Reply Refer to:
D5215 (DSC-CS)
GRSM 149368 / 149285
| Date: | December 5, 2023, 2023 |
| To: | General Public (Via the Government’s Point Entry) |
| From: | Matthew Carpenter, Contracting Officer, National Park Service, Denver Service Center |
| Subject: | Sources Sought Notice |
| Reference: | GRSM 149368 – Rehabilitate Sugarlands Headquarters |
GRSM 149285 – Rehab Sugarlands Water and Wastewater Systems
This is a Sources Sought Notice (SSN) for the purpose of conducting market research. Proposals are NOT being requested, nor accepted at this time. Responses are being requested from both large and small businesses.
Purpose: The purpose of this notice is to gain knowledge regarding the type of interested businesses and their qualifications. The National Park Service (NPS) will use information obtained through this notice to develop an acquisition strategy.
The Government anticipates conducting a competitive acquisition for this requirement. The amount of interest or lack thereof will determine the possibility of a small business or other socio-economical small business set-aside for the solicitation. Analysis of the quality of responses to this source sought announcement will be considered in the market research being conducted, and in the making of any small business set-aside determination for this requirement.
Additional Information: No proposal package, solicitation, specification or drawings are available with this notice.
Cost Reimbursement: Response to this announcement is strictly voluntary; no reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow-up information requests.
North American Industry Classification System (NAICS) code: 236220
Small Business Size Standard: $45,000,000
Solicitation: The NPS anticipates issuing a request for proposals in the spring of 2024
Bonding: The NPS anticipates bid, performance and payment bonds will be required
Project Description:
This project is for GRSM 149368, Rehabilitate Sugarlands Headquarters and GRSM 149285 – Rehab Sugarlands Water and Wastewater Systems. The project is located at Great Smoky Mountains National Park, TN. The construction magnitude is over $10,000,000.
This project is for rehabilitation of the Great Smoky Mountains National Park Headquarters Campus at the Sugarlands Visitor Center Area in Gatlinburg, TN. The project includes the restoration, rehabilitation, and upgrade of the existing Headquarters building in the Sugarlands Historic District and construction of associated new utilities for water and waste water to serve these buildings and the Campus.
The surrounding area is rural with limited staging located at the existing Headquarters parking areas. There are no unique material delivery requirements. The construction site is within 25 of miles from nearest suppliers and lodging facilities. The Headquarters building will not be occupied during construction, but nearby Park buildings remain open, thus contract activities and logistics must be structured and scheduled to minimize visitor impact. The site requires protective measures to ensure the surrounding area remains undisturbed. The Sugarland Headquarters building is a historic resource.
The anticipated period of performance of 550 calendar days including any potential weather impacts.
Winter construction may be required.
Project Scope:
For the existing Headquarters building, a primary project requirement is to upgrade the building HVAC system, and replace electric service panels and components. HVAC upgrades will include replacing plumbing, air conditioning, heating and ventilation, and insulation to meet current codes; and installation of a fire detection and suppression system. Electrical upgrades will include increasing service by replacing the existing service panel with a 600-amp panel; replace sub-panels on the first, second and third floors; replace existing wire and install code compliant conduit; and improve fluctuating grounding systems. The rehabilitation of the facility’s electrical system will meet National Electrical Code requirements for safety and reduce the current maintenance commitment. Additionally, information technology lines and equipment will be provided to a new IT room.
The project will also rehabilitate interior/exterior building finishes, including not limited to: stabilize the foundation, repoint stone masonry; repair roof leaks and damages to roofing material; repair the exterior porches; mitigate the asbestos, radon, lead paint, flammable surfaces and egress problems; and mitigate bat, rodent, and insect intrusion. Exterior finishes requiring rehabilitation include stone masonry, wood timbers, windows, and slate tile roofing. Interior finishes requiring rehabilitation include wood panels, tile, and marble elements. All work performed will be sensitive to the historic fabric.
Accessible access to all three floors will be accomplished via addition of an elevator and rehabilitation of restrooms.
Other components of the scope of the project includes the demolition of the existing Little River Ranger Station with removal of hazardous roofing material.
The work to rehabilitate the water and wastewater systems includes, but is not limited to:
· Replace existing water mains with new HDPE pipe. Some utility alignments are in existing roadways and will require pavement removal and replacement as well as bridge crossings over short spans.
· Installation of water service lines to park residences and administrative buildings.
· Install new valves throughout system.
· Replacement of fire hydrants.
· Replacement of equipment at RV dump station.
· Abandonment of existing system in place.
· Backfilling, re-grading, and seeding.
· Expansion of existing pump house including relocation of electrical equipment.
· Residences will be occupied during construction and the existing water system will remain in operation until the new system is brought online.
Sanitary Sewer:
· Rehabilitation of existing 6” and 8” gravity sewer pipe and manholes (e.g. lining).
· Select pipe replacement and reconnection.
· Select manhole replacement.
· Backfilling, re-grading, and seeding of disturbed areas.
Submittal Contents: Interested (small and large) businesses should submit the following information:
| (1) | Company name, DUNS number, address, point of contact, telephone number, and email address. |
| (2) | Business type: Classification as a Large or Small Business under the above listed NAICS, Small Business Administration (SBA) certified Historically Underutilized Business Zone (HUBZone), Veteran-Owned Small Businesses (VOSB), Service-Disabled Veteran-Owned Small Businesses (SDVOSB), SBA certified Woman Owned Small Business (WOSB), Economically Disadvantaged Woman Owned Small Business (EDWOSB). The size of a small business firm includes all parents, subsidiaries, affiliates, etc.—see 13 CFR 121.108.) Misrepresentation of sizwe status can result in penalties. |
| (3) | Statement regarding your company’s bonding capacity. Letters from bonding companies are not required at this time. |
(4) Information demonstrating experience and capability on projects of same or similar size, scope and magnitude, and constructed under similar conditions.
(5) In addition businesses may submit existing marketing materials such as capability statements and brochures.
Submittal Format: Written responses shall be submitted electronically to the email recipients below. For Items (1) through (4), please limit your response to no more than 8 pages, no less than 10 pt. font. Item (5) is not included in the page limitation, but should be relevant to this Project.
Submittal Due Date/Time: 3:00 PM Mountain Time, December 19, 2023
Submit To: Matthew Carpenter, CO; matthew_carpenter@NPS.gov and Julia Sullivan, CS; julia_sullivan@NPS.Gov
Page 8 of 8 GRSM 149368: Rehabilitate Sugarlands Headquarters & Construct New Annex image1.jpeg