MORU_CD_Volume_3_0006.pdf
PDF 14 MB Posted
- Attached to
- MORU 272051 WWTP Solicitation
- Solicitation number
- 140P2023R0125
About this file
This file is a summary of a federal solicitation for wastewater treatment plant improvements. The solicitation number is 140P2023R0125 and was issued by the Department of the Interior National Park Service National Office. It seeks proposals to upgrade the MORU 272051 Wastewater Treatment Plant. Offerors must submit proposals by the dates listed in the full solicitation document. The solicitation requires replacement and upgrades of various plant components, systems, and controls to meet current standards and ensure continued operations. Pricing should be listed separately for labor, equipment, and any other direct costs. The contract will be set aside for small businesses.
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OLD
BALDY
MOUNTAIN
TO 385
MOUNT RUSHMORE
SCULPTURES
VISITOR AREA
LEGEND
AMPHITHEATER
WATER RESERVOIR
CONCESSION
BUILDING
ENERGY
CENTER
DORMITORY
INTERPRETIVE
CENTER
MAINTENANCE BUILDING
SCULPTOR'S STUDIO
& RESIDENCE
WASTE WATER
TREATMENT PLANT
WATER PUMPING
& STORAGE AREA
SWITCHBACK
(INACTIVE)
HOUSING
AREA
TO 36
16A
KEYSTONE
TO 16
TO
HAYWARD
THIS PROJECT
MOUNT RUSHMORE NATIONAL MEMORIAL
SCALE OF FEET
400' 0' 800'
100 0 100 200
400'
SCALE OF METERS
WASTEWATER TREATMENT PLANT EXPANSION
MAP LEGEND
PARK BOUNDARY
PAVED ROAD
UNPAVED ROAD
TRAIL
VISITOR CENTER
PARK HEADQUARTERS
PARKING
RESTROOMS
HQ.
V.C.
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
C R e v it L o c a l\ -0
S e ri e s
G e n e ra l_ R ic W e b e r.
rv t
/1
/2
:5 :1
A
M
VOL3
MOUNT RUSHMORE NATIONAL MONUMENT
272051
COVER SHEET VOLUME 3RDW
CLZ / TWM / HHD
06/13/23
RDW
18678703-
FINAL CONSTRUCTION DOCUMENTS
SCHEDULE OF DRAWINGS VOLUME 3
SHEET SUB-SHEET SHEET NAME
122 03-VOL3 COVER SHEET VOLUME 3
123 03-G001 SOUTH BUILDING CODE ANALYSIS
124 03-X101 SOUTH BUILDING ARCHITECTURAL DEMOLITION PLANS
125 03-X102 SOUTH BUILDING LOWER LEVEL PROCESS DEMOLITION PLAN
126 03-X103 SOUTH BUILDING UPPER LEVEL PROCESS DEMOLITION PLAN
127 03-X104 SOUTH BUILDING MECHANICAL DEMOLITION PLANS
128 03-X105 SOUTH BUILDING LOWER LEVEL ELECTRICAL DEMOLITION PLAN
129 03-X106 SOUTH BUILDING UPPER LEVEL ELECTRICAL DEMOLITION PLAN
130 03-X601 SOUTH BUILDING ELECTRICAL MCC-2 ONE-LINE - DEMO
131 03-X602 SOUTH BUILDING MISC ONE-LINE - DEMO
132 03-X603 SOUTH BUILDING MISC ONE-LINE - DEMO
133 03-S101 SOUTH BUILDING FOUNDATION PLAN
134 03-S102 SOUTH BUILDING UPPER LEVEL FLOOR PLAN
135 03-S103 SOUTH BUILDING ROOF FRAMING PLAN AND TRUSS LOADING DIAGRAMS
136 03-S301 SOUTH BUILDING SECTIONS
137 03-S302 SOUTH BUILDING SECTIONS
138 03-S303 SOUTH BUILDING SECTIONS
139 03-A101 SOUTH BUILDING LOWER LEVEL FLOOR PLAN
140 03-A102 SOUTH BUILDING UPPER LEVEL AND LOADING DOCK FLOOR PLAN
141 03-A103 SOUTH BUILDING REFLECTED CEILING AND ROOF PLANS
142 03-A201 SOUTH BUILDING EXTERIOR ELEVATIONS
143 03-A301 SOUTH BUILDING SECTIONS AND DETAILS
144 03-A302 SOUTH BUILDING WALL SECTIONS
145 03-A303 SOUTH BUILDING WALL SECTIONS
146 03-A501 SOUTH BUILDING DETAILS
147 03-A601 SOUTH BUILDING DOOR AND WINDOW SCHEDULES
148 03-A602 SOUTH BUILDING ROOM FINISH SCHEDULE
149 03-D101 SOUTH BUILDING LOWER LEVEL PROCESS PLAN
150 03-D102 SOUTH BUILDING UPPER LEVEL PROCESS PLAN
151 03-D103 SOUTH BUILDING EQ BASINS PLAN
152 03-D301 SOUTH BUILDING PROCESS SECTION
153 03-D302 SOUTH BUILDING PROCESS SECTION
154 03-D303 SOUTH BUILDING PROCESS SECTION
155 03-D304 SOUTH BUILDING PROCESS SECTION
156 03-D501 SOUTH BUILDING TANK DETAILS
157 03-D502 SOUTH BUILDING PROCESS DETAILS
158 03-D901 SOUTH BUILDING FERRIC CHLORIDE ISOMETRIC
159 03-D902 SOUTH BUILDING SODIUM HYDROXIDE ISOMETRIC
160 03-D903 SOUTH BUILDING SODIUM HYDROXIDE ISOMETRIC
161 03-M101 SOUTH BUILDING LOWER LEVEL MECHANICAL PLAN
162 03-M102 SOUTH BUILDING UPPER LEVEL MECHANICAL PLAN
163 03-P101 SOUTH BUILDING LOWER LEVEL PLUMBING PLAN
164 03-P102 SOUTH BUILDING UPPER LEVEL PLUMBING PLAN
165 03-P103 SOUTH BUILDING PLUMBING RISER DIAGRAMS
166 03-E101 SOUTH BUILDING LOWER LEVEL POWER PLAN
167 03-E102 SOUTH BUILDING UPPER LEVEL POWER PLAN
168 03-E103 SOUTH BUILDING LOWER LEVEL LIGHTING PLAN
169 03-E104 SOUTH BUILDING UPPER LEVEL LIGHTING PLAN
170 03-E105 SOUTH BUILDING LIGHTNING PROTECTION / GROUNDING PLAN
171 03-E301 SOUTH BUILDING LIGHTING SECTIONS
172 03-E601 SOUTH BUILDING 03-MCC-1 ONE-LINE
173 03-E602 SOUTH BUILDING 03-MCC-1 ELEVATION
174 03-E603 SOUTH BUILDING MOTOR CONTROL DIAGRAM 1
175 03-E604 SOUTH BUILDING MOTOR CONTROL DIAGRAM 2
176 03-E605 SOUTH BUILDING SCHEDULES
VOLUME 3
A
.5
A (6.0')
A
.5
B (8.0')
B
.0
E
.7
C
.7
E
E
C
.0
C (6.5')
C
.5
C
C
D (12.0')
D (2
.5
D (6.0')
(2 .0
E1 (16.0')
E1 (16.2')
E
.0
E1 (6.5')
(3 .2
E
E
.5
E
.5
E (2
.6
E
(1
.0
E2 (16.0')
E
.5
901 SF
INDUSTRIAL
579 SF
STORAGE
UNOCCUPIABLE AREA
C5 C5
C5
C5
FEC
FE
348 SF
STORAGEFE
1353 SF
INDUSTRIAL
305 SF
STORAGE
308 SF
MECHANICAL
C5
C5
FEC
MAXIMUM OCCPT. LOAD WITH ONE EXIT/DOOR (TABLE 1006.2.1)
F-1= 49 OCC.
S-1= 29 OCC.
IBC 1008.3 EMERGENCY POWER FOR ILLUMINATION
THE POWER SUPPLY FOR MEANS OF EGRESS ILLUMINATION SHALL
NORMALLY BE PROVIDED BY THE PREMISES' ELECTRICAL SUPPLY.
IBC 1204.5 EMERGENCY EGRESS LIGHTING: THE MEANS OF EGRESS
SHALL BE ILLUMINATED IN ACCORDANCE WITH IBC 1008.1.
ACCESSIBLE ROUTE PLAN
BOTH LEVELS OF THE SOUTH BUILDING AND THE LOWER LEVEL OF THE NORTH BUILDING ARE
USED FOR THE MECHANICAL AND PROCESS EQUIPMENT OF THE WASTEWATER TREATMENT
PLANT, AND ARE NOT REQUIRED TO BE ACCESSIBLE SPACES. THE SUPPORT SPACES IN THE
UPPER LEVEL OF THE NORTH BUILDING WILL BE FULLY ACCESSIBLE WHERE REQUIRED BY
ABA. AN ACCESSIBLE ROUTE WILL EXTEND TO A MARKED ACCESSIBLE PARKING STALL SOUTH
OF THE BUILDING.
FIRE PROTECTION & LIFE SAFETY
SOUTH BUILDING- CHEMICAL STORAGE:
SOUTH BUILDING- FERRIC CHLORIDE (38% CONCENTRATION) IS A CORROSIVE, WHICH HAS A
MAXIMUM ALLOWABLE QUANTITY (MAQ) OF 500 GALLONS IN ACCORDANCE WITH IFC TABLE
5003.1.1(2). HOWEVER, BECAUSE THE STORAGE TANK IS LOCATED ON THE SECOND LEVEL,
THE MAQ PER CONTROL AREA IS REDUCED TO 75% OF THE MAXIMUM VALUE PER IFC TABLE
414.2.2. TO AVOID A GROUP H OCCUPANCY CLASSIFICATION, THE FERRIC CHLORIDE STORAGE
TANK WILL BE LIMITED TO NOT MORE THAN 375 GALLONS.
THE POLYMER LOCATED IN THE DEWATERING ROOM IN THE SOUTH BUILDING IS AN IRRITANT
AND DOES NOT HAVE AN MAQ. IT WILL BE STORED IN TWO 55-GALLON DRUMS WITH
CONTAINMENT.
SODIUM HYDROXIDE (50% CONCENTRATION) IS ALSO A CORROSIVE WITH AN MAQ OF 500
GALLONS. TO AVOID A GROUP H OCCUPANCY CLASSIFICATION, THE SODIUM HYDROXIDE WILL
BE SPLIT BETWEEN TWO STORAGE TANKS LIMITED TO 500 GALLONS EACH AND WILL BE IN
TWO CONTROL AREAS SEPARATED FROM THE ADJACENT AREA BY 1-HOUR RATED WALLS.
SOUTH BUILDING - REPAIR GARAGE:
THE REPAIR GARAGE IS A GROUP S-1 OCCUPANCY THAT IS PART OF A FIRE AREA THAT IS
LESS THAN 5,000 SQUARE FEET AND THEREFORE, A FIRE SPRINKLER SYSTEM IS NOT
REQUIRED PER IBC §903.2.9.1(4). EQUIPMENT LESS THAN 18” ABOVE THE FLOOR SHALL BE
CLASSIFIED AS CLASS I DIVISION 2 PER THE NEC. IT IS ANTICIPATED THAT A DOOR WILL NOT
BE PROVIDED IN THE WALL THAT SEPARATES THE REPAIR GARAGE FROM THE
BLOWER/CAUSTIC ROOM TO PREVENT THE TRANSFER OF GASES BETWEEN THE ROOMS.
VENTILATION AND GAS DETECTION SHALL BE PROVIDED IN ACCORDANCE WITH THE IMC.
SOUTH BUILDING (SERIES 03)
CONSTRUCTION TYPE- VB
ALLOWABLE AREA: (TABLE 506.2) NS= NOT SPRINKLERED
B-- 9,000 SF (NS)
F-1-- 8,500 SF (NS)
S-1-- 9,000 SF (NS)
SEPARATION (TABLE 508.4)
F-1/S-1 NONE REQUIRED
FIRE-RESISTANCE REQUIREMENTS FOR BUILDING ELEMENTS (VB): TABLE 601
PRIMARY STRUCTURAL FRAME- 0 HRS.
BEARING WALLS:
EXTERIOR-0 HRS.
INTERIOR- 0 HRS.
NON-BEARING WALLS AND PARTITIONS:
EXTERIOR (TABLE 602) 10’<=X<=30’- 0 HRS.
INTERIOR- 0 HRS
FLOOR CONSTRUCTION AND SECONDARY MEMBERS- 0 HRS
ROOF CONSTRUCTION AND SECONDARY MEMBERS- 0 HRS.
DUE TO OCCUPANCY TYPE, USE OF CONTROL AREAS, AND AREA SIZE, A SPRINKLER SYSTEM IS NOT REQUIRED BY THE IBC IN EITHER BUILDING. (CHAPT. 9) ALSO SEE FIRE PROTECTION & LIFE SAFETY.
USE: BUILDING IS USED TO HOUSE PROCESS EQUIPMENT FOR A WASTEWATER TREATMENT PLANT TREATMENT TRAIN INCLUDING 2 CENTRIFUGES, BLOWERS, POLYMER STORAGE, ELECTRICAL ROOM, TRUCK LOADING GARAGE AND MAINTENANCE/SHOP AREA.
OCCUPANCY TYPE- F-1- FACTORY INDUSTRIAL
S-1- MODERATE HAZARD STORAGE
BUILDING IS CONSIDERED NOT OCCUPIED.
PROJECT WILL USE CONTROL AREAS (1-HOUR RATED) WITH CHEMICAL QUANTITIES (MAQ) UNDER
THE THRESHOLD TO STAY AWAY FROM A HAZARD OCCUPANCY.
NFPA 820 REQUIREMENTS:
THE SOUTH BUILDING CONTAINS EQUIPMENT ASSOCIATED WITH THE
WASTEWATER TREATMENT PROCESS INCLUDING THE SCREENING
ROOM, DEWATERING ROOM, AND TRUCK LOADING ON THE UPPER LEVEL
AND THE BLOWER ROOM ON THE LOWER LEVEL.
THE SCREENING ROOM IN THE SOUTH BUILDING REQUIRES 12 AIR
CHANGES PER HOUR (ACH) TO ACHIEVE A NEC HAZARDOUS LOCATION
CLASSIFICATION OF CLASS I DIVISION 2 (CID2) PER NFPA 820 TABLE 5.2.2
ROW 2 LINE B, WHICH ALSO REQUIRES THE SCREENING ROOM IS
REQUIRED TO BE PROVIDED WITH A COMBUSTIBLE GAS DETECTION
(CGD) SYSTEM. PER NFPA 820, A NEGATIVE PRESSURE IS REQUIRED TO
BE MAINTAINED RELATIVE TO THE ADJACENT ELECTRICAL ROOM.
THE TRUCK LOADING BAY AND DEWATERING ROOM IN THE SOUTH
BUILDING FALL UNDER NFPA 820 TABLE 6.2.2(A) ROW 12, LINE A, WHICH
ALLOWS THE SPACE TO BE UNCLASSIFIED WHEN CONTINUOUSLY
VENTILATED AT 6 ACH AND REQUIRES THESE SPACES TO BE PROVIDED
WITH A FIRE ALARM AND DETECTION SYSTEM. PER NFPA 820, DUE TO
THE SHARED WALL WITH THE ELECTRICAL ROOM, A NEGATIVE
PRESSURE IS REQUIRED BE MAINTAINED IN THE DEWATERING ROOM TO
MITIGATE GAS TRANSFER BETWEEN THE TWO SPACES.
THE BLOWER ROOM ON THE LOWER LEVEL OF THE SOUTH BUILDING IS
NORMALLY UNCLASSIFIED. VENTILATION AT A RATE OF 1 CFM/SF IS
REQUIRED BY THE IFC FOR THE SODIUM HYDROXIDE STORAGE SPACE.
APPLICABLE CODES
REFERENCE:
IBC 2021
NFPA 101 2021
(where IBC is silent)
NFPA 820 2020
IEBC 2021
IECC 2018
IPC 2021
IMC 2018
NFPA 70 2020
IFC 2021
IFGC 2018
APPLICABLE CODES:
COMMERCIAL BUILDING:
LIFE SAFETY:
FIRE PROTECTION IN WASTEWATER
TREATMENT & COLLECTION FACILITIES:
NPS STRUCTURAL FIRE
REFERENCE MANUAL 58:
EXISTING BUILDING CODE:
ENERGY CONSERVATION:
PLUMBING:
MECHANICAL:
ELECTRICAL:
FIRE:
FUEL/GAS:
1 HOUR FIRE RATED WALL
FIRE RATED WALL PATTERNS LEGEND
ASCALE
8 0 8 16
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
C R e v it L o c a l\ -0
A rc h S o u th
B ld g -v
R ic W e b e r.
rv t
/1
/2
:3
:4
A
M
G001
MOUNT RUSHMORE NATIONAL MONUMENT
272051
SOUTH BUILDING CODE
ANALYSIS
KJH
CLZ / TWM / HHD
06/13/23
RDW
18678703-
FINAL CONSTRUCTION DOCUMENTS
SCALE A G001
1 LOWER LEVEL
SCALE A G001
2 DOCK DRIVE
SCALE A G001
3 UPPER LEVEL
IBC 2021 TABLE 1006.2.1
COMMON PATH DISTANCES
Egress Route Name Route Total
CP Max Dist Permitted
F
A 59.0 75'-0"
D 43.5 75'-0"
E1 39.5 75'-0"
E2 39.5 75'-0"
S
B 34.0 75'-0"
C 71.2 75'-0"
IBC 2021 TABLE 1017.2
EGRESS TRAVEL DISTANCES
Egress Route Name Route Total
ET Max Dist Permitted
F-1,S-1
A 59.0 200'-0"
B 34.0 200'-0"
C 71.2 200'-0"
D 43.5 200'-0"
E1 127.7 200'-0"
E2 71.1 200'-0"
TABLE 1004.5 IBC 2021
OCCUPANT LOAD SCHEDULE
CLASS FUNCTION OF SPACE AREA FACTOR OCC LOAD
LOWER LEVEL
S-1 ACCESSORY STORAGE AREA, MECHANICAL EQUIPMENT ROOM 579 SF 300 2
F-1 INDUSTRIAL AREAS 901 SF 100 10
1,479 SF 12
DOCK DRIVE
F-1 INDUSTRIAL AREAS 348 SF 100 4
348 SF 4
UPPER LEVEL
S-1 ACCESSORY STORAGE AREA, MECHANICAL EQUIPMENT ROOM 305 SF 300 2
F-1 INDUSTRIAL AREAS 1,661 SF 100 18
1,966 SF 20
BUILDING TOTAL: 3,793 SF 36
J
T
SS
T
X01X02 X04X10X09
15'-1"
X05
A36 A34
X03
X05
A16 X02X24
4'-7 5/8" 12'-0 3/8"
X06 X03
A46
X15
X101
A35
A34
X25
X06
X06
X15
X20 X20
X15
X26
X27
X24
X03
X01
X03
X06
X10
X03
X02 X04
X15X20
X02
X20
4'-7 5/8" 3'-4 3/8"
X06
X101
X03
X26
1. ALL BOLD OR FULL-TONE LINES INDICATE ITEMS TO BE
REMOVED OR RELOCATED. ALL LIGHT OR HALF-TONE LINES
INDICATE EXISTING ITEMS TO REMAIN.
DEMO HATCH:
2. WHERE DEMOLITION OCCURS ADJACENT TO SURFACES
INDICATED TO REMAIN, CARE SHOULD BE TAKEN NOT TO
DESTROY OR DAMAGE EXISTING SURFACES. IF DAMAGE
OCCURS, IT IS THE CONTRACTOR'S RESPONSIBILITY TO PATCH
AND REPAIR THESE SURFACES TO ORIGINAL CONDITION.
GENERAL CONTRACTOR SHALL COORDINATE WITH
MECHANICAL AND ELECTRICAL CONTRACTORS TO PATCH
EXISTING SURFACES DAMAGED BY DEMOLITION OR
INSTALLATION OF NEW MECHANICAL AND/OR ELECTRICAL
SYSTEMS.
3. THE OWNER RESERVES THE FIRST RIGHT OF SALVAGE ON ALL
ITEMS. ANY ITEMS NOT SALVAGED BY THE OWNER SHALL BE
REMOVED AND DISPOSED OF OFF SITE.
4. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER ALL
PROVISIONS FOR DUST CONTROL, DEBRIS REMOVAL SHUT-
OFFS, ETC.
5. PATCH AND REPAIR ALL HOLES OR PENETRATIONS THRU FIRE
RATED WALLS, FLOOR AND ROOF WITH APPROVED
FIRESTOPPING MATERIALS.
GENERAL DEMOLITION NOTES
DOCK DRIVE
ELEV. = 112'-2"
UPPER LEVEL
ELEV. = 115'-8"
T.O.W. EXISTING
ELEV. = 129'-8"
A301
T.O.W. DOCK
ELEV. = 127'-6"
A303
A501
4' -0
A34
A34
A35 A35
OPTION ITEM: SPECIFIC OPTION
NUMBER LISTED BY KEYNOTE AND
DETAILED IN SPECIFICATIONS
OPTIONS LEGEND
SCALE A X101
LOWER LEVEL DEMOLITION PLAN1
ASCALE
8 0 8 16
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
C R e v it L o c a l\ -0
A rc h S o u th
B ld g -v
R ic W e b e r.
rv t
/1
/2
:3
:4
A
M
X101
MOUNT RUSHMORE NATIONAL MONUMENT
272051
SOUTH BUILDING
ARCHITECTURAL
DEMOLITION PLANS
KJH
CLZ / TWM / HHD
06/13/23
RDW
18678703-
FINAL CONSTRUCTION DOCUMENTS
SCALE A X101
UPPER LEVEL
DEMOLITION PLAN
SCALE A X101
SOUTH BUILDING DEMO 3D4
KEYNOTES - DEMOLITION
# DESCRIPTION
A16 CEDAR TRIM; 2x6 & 2x4; MATCH (E)
A34 BID OPTION #1. SEE MEPD
A35 BID OPTION #1. ARCHITECTURAL WORK PART OF OPTION 1. SEE DETAILS
SHEET 03-A102
A36 BID OPTION #3. SEE MEPD
A46 HOSE BIB (E)
X01 SAWCUT AND REMOVE SIDEWALK AS NEEDED FOR NEW CONSTRUCTION
X02 REMOVE SHIPLAP SIDING; SALVAGE AS REASONABLY POSSIBLE FOR INFILL
USE
X03 REMOVE TRIM
X04 REMOVE EXISTING FURRING AND RIGID INSULATION; REPAIR CONCRETE AS
NEEDED
X05 SEE MEPD DEMOLITION PLANS
X06 REMOVE PORTION OF WALL SHOWN DASHED FOR NEW OPENING - SEE NEW
WORK PLANS
X09 REMOVE WALL SHOWN DASHED COMPLETE
X10 REMOVE DOOR, FRAME AND HARDWARE COMPLETE
X15 REMOVE WINDOW & SILL COMPLETE
X20 REMOVE LOUVER COMPLETE
X24 REMOVE RAILING FROM TOP OF RETAINING WALL. CUT OFF (6) RAILING
POSTS AT CONCRETE. PATCH HOLES.
X25 REMOVE ROOF COMPLETE
X26 REMOVE COLUMN AND RAILS COMPLETE. REMOVE (4) ANGLES. PATCH BOLT
HOLES.
X27 REMOVE BEAM COMPLETE
SCALE A X101
DOCK DRIVE
DEMOLITION PLAN
SCALE A X101
DEMOLITION ELEVATION - WEST SIDE5
OPTION #1
X102
X01
X02X02
X03X03
X03X03
X04X04
X04X04
X04X04
X05
X06
X07
X08
X13
X14
LOWER LEVEL F.F.
4991.33
UPPER LEVEL F.F.
5007.00 ±
X03
BSCALE
ASCALE
2 0 2 64
SCALE OF FEET
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
M
O R
U W a s te w a te r R e h a b a n d E x p a n s io n
/1
-0
-D
.r v t
/9
/2
:1
:5
P
M
X102
MOUNT RUSHMORE NATIONAL MEMORIAL
272051
SOUTH BUILDING LOWER
LEVEL PROCESS
DEMOLITION PLAN
CLR
DJG
06/13/23
KSP
18678703-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
SOUTH BUILDING LOWER LEVEL PLAN
SCALE BX102
SECTION2
GENERAL NOTES
1. THE TREATMENT FACILITY MUST REMAIN IN OPERATION AT ALL TIMES.
2. COORDINATE AND SCHEDULE WORK IMPACTING TREATMENT PROCESSES
WITH THE OWNER AND OBTAIN PRIOR APPROVAL. REFER TO SECTION 01 31
00 FOR ADDITIONAL REQUIREMENTS.
3. REMOVE ALL SUPPORTS AND ANCHOR BOLTS,. PATCH THE STRUCTURE AS
SPECIFIED IN SECTION 01 73 29.
4. EQUIPMENT CONNECTIONS VARY BY MANUFACTURER AND ARE TO BE
COORDINATED BY THE INSTALLING CONTRACTOR.
5. SEE ARCHITECTURAL DRAWINGS FOR INFILL AND REPAIR OF OPENINGS
AND PENETRATIONS REMANINING AFTER DEMOLITION AND NEW WORK.
6. SEE SPECIFICATION SECTION 01 27 00 FOR DESCRIPTION OF BID OPTIONS
KEYNOTES - DEMOLITION
# DESCRIPTION
X01 DEMOLISH AIR COMPRESSOR AND RECEIVER ONLY AFTER THE NEW AIR
COMPRESSOR SYSTEM IS COMMISSIONED AND READY FOR OPERATION.
X02 DEMOLISH CENTRIFUGE FEED PUMP AND GRINDER. COORDINATE
SHUTDOWN WITH OWNER.
X03 DEMOLISH EXISTING PROCESS PIPING AND FITTINGS AS NECESSARY TO
ALLOW INSTALLATION OF NEW FITTINGS OR PROCESS CONNECTIONS.
X04 DEMOLISH EXISTING EQ BASIN AND SOLIDS HOLDING TANK AERATION
PIPING AND DIFFUSERS.
X05 DEMOLISH MIXER INCLUDING SUPPORTS AND ELECTRICAL
CONNECTIONS.
X06 REMOVE EXISTING PIPING AND PREPARE REMAINING PIPING FOR
CONNECTION TO NEW PIPING SYSTEM.
X07 REMOVE EXISTING AIR FILTERS (2) AND RELOCATE TO NEW OUTSIDE AIR
INTAKE LOCATION.
X08 REMOVE EXISTING BLOWER AIR HEAT EXCHANGER AND RELOCATE TO
NEW LOCATION AS SHOWN ON 01-C106.
X13 DEMOLITION OF THE CENTRIFUGE FEED PUMP AND GRINDER IS
INCLUDED IN BID OPTION #1. THE BASE BID EXCLUDES REPLACEMENT
OF THIS EQUIPMENT.
X14 DEMOLITION OF AIR COMPRESSOR IS INCLUDED IN BID OPTION #3. THE
BASE BID INCLUDES RELOCATION OF THIS EQUIPMENT RATHER THAN
DEMOLITION.
X09
X10
X11
X12
X15
X15
X15
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
M
O R
U W a s te w a te r R e h a b a n d E x p a n s io n
/1
-0
-D
.r v t
/9
/2
:1
:5
P
M
X103
MOUNT RUSHMORE NATIONAL MEMORIAL
272051
SOUTH BUILDING UPPER
LEVEL PROCESS
DEMOLITION PLAN
CLR
DJG
06/13/23
KSP
18678703-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
SOUTH BUILDING UPPER LEVEL
GENERAL NOTES
1. THE TREATMENT FACILITY MUST REMAIN IN OPERATION AT ALL TIMES.
2. COORDINATE AND SCHEDULE WORK IMPACTING TREATMENT
PROCESSES WITH THE OWNER AND OBTAIN PRIOR APPROVAL. REFER
TO SECTION 01 31 00 FOR ADDITIONAL REQUIREMENTS.
3. REMOVE ALL SUPPORTS AND ANCHOR BOLTS,. PATCH THE
STRUCTURE AS SPECIFIED IN SECTION 01 73 29.
4. EQUIPMENT CONNECTIONS VARY BY MANUFACTURER AND ARE TO BE
COORDINATED BY THE INSTALLING CONTRACTOR.
5. SEE ARCHITECTURAL DRAWINGS FOR INFILL AND REPAIR OF
OPENINGS AND PENETRATIONS REMAINING AFTER DEMOLITION AND
NEW WORK.
6. SEE SPECIFICATION SECTION 01 27 00 FOR DESCRIPTION OF BID
OPTIONS.
KEYNOTES - DEMOLITION
# DESCRIPTION
X09 DEMOLISH DEWATERING CENTRIFUGE, PIPING CONNECTIONS, AND
EQUIPMENT PADS.
X10 DEMOLISH SOLIDS CONVEYOR.
X11 DEMOLISH INFLUENT SCREEN.
X12 DEMOLISH POLYMER MAKEUP UNIT.
X15 DEMOLITION OF CENTRIFUGE, CENTRIFUGE PIPING, POLYMER
MAKEUP UNIT, AND SOLIDS CONVEYOR IS INCLUDED IN BID OPTION
#3. THE BASE BID EXCLUDES REPLACEMENT OF THIS EQUIPMENT.
X1
X1
X1
X1
X3
X5
X5
X2
X2 X2
X2
X3
X4
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
M
O R
U W a s te w a te r R e h a b a n d E x p a n s io n
/1
-0
-M
P .r v t
/9
/2
:0
:3
P M
X104
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
SOUTH BUILDING
MECHANICAL DEMOLITION
PLANS
Designer
Checker
06/13/23
AJC
18678703-
FINAL CONSTRUCTION DOCUMENTS
SCALE A
HVAC DEMOLITION LOWER LEVEL1
SCALE A
HVAC DEMOLITION UPPER LEVEL2
KEYNOTES
X1 DEMOLISH EXHAUST SYSTEM (FAN,
DUCTWORK, LOUVERS AND CONTROLS)
ONLY AFTER THE NEW EXHAUST SYSTEM
COMMISSIONED AND READY FOR
OPERATION.
X2 DEMOLISH EXHAUST SYSTEM (FAN,
CONTROLS AND LOUVERS) ONLY AFTER
THE NEW MAKE-UP AIR SYSTEM AND
NEW EXHAUST SYSTEMS ARE
COMMISSIONED AND OPERATIONAL.
X3 DEMOLISH UNIT HEATER ONLY AFTER
NEW MAKE-UP AIR UNIT SYSTEMS ARE
COMMISSIONED AND OPERATIONAL.
X4 DEMOLISH EYEWASH AND CAP PIPING AT
MAIN.
X5 RELOCATE AIR COMPRESSOR, OIL
FILTER, AIR RECIEVER, DRYER, AND PRV
VALVES.
J
IC
IC
IC
IC
03-BLW-1
03-BLW-2
03-BLW-3
AIR DYRER
SUBMERSIBLE
MIXER SM-1
SAVE EXISTING
PLUG FOR REUSE
WITH NEW MIXEREXISTING MIXER
RECEPTACLE
AIR COMPRESSOR &
CONTROL PANEL
DF-1
EXISTING WIREWAY TO REMAIN
EXISTING PULLBOX TO REMAIN
EXISTING TELEPHONE
TERMINATION BOX TO
REMAIN
TO EXISTING DUCT BANK
EUH-1
DF-1
CFP-1
ASG-1
PSLL-210
PSHH-213
X02
X03
X05
X06
FE-212
FIT-212
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-E
.r v t
/9
/2
:0
:5
A M
X105
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
SOUTH BUILDING LOWER
LEVEL ELECTRICAL
DEMOLITION PLAN
GB
KLG
06/13/23
MTJ
18678703-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
SOUTH BUILDING LOWER LEVEL ELECTRICAL DEMOLITION PLAN
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING, PAINTING
OR REPLACEMENT OF ALL WALL, CEILING, OR OTHER BUILDING
ELEMENTS WHICH ARE DISTURBED AS PART OF THE DEMOLITION OR
INSTALLATION OF ELECTRICAL WORK.
2. THE CONTRACTOR SHALL COMPLETELY REMOVE ALL SWITCHES,
DISCONNECTS, LIGHTING FIXTURES AND OTHER ASSOCIATED ITEMS AS
SHOWN (CROSSHATCHED). REMOVE ASSOCIATED WIRING AND
RACEWAYS UNLESS NOTED OTHERWISE. THE ITEMS INDICATED
SPECIFICALLY ON THE DRAWINGS TO BE REMOVED ARE ONLY TO
INDICATE IN GENERAL TO THE CONTRACTOR THE AMOUNT OF
DEMOLITION WORK INVOLVED. A SITE INVESTIGATION BY THE
CONTRACTOR SHOULD BE PERFORMED TO AID IN DETERMINING THE
COMPLETE EXTENT OF WORK INVOLVED.
3. ALL EXISTING BRANCH CIRCUITS BEING REMOVED SHALL BE REMOVED
AS COMPLETE AS POSSIBLE. EXISTING CONDUCTORS SHALL BE
REMOVED COMPLETELY FROM THEIR RACEWAYS, REMOVED FROM SITE
AND NOT REUSED EXCEPT WHERE SPECIFICALLY NOTED OTHERWISE.
WHERE AN EXISTING DEVICE IS SHOWN REMOVED FROM AN EXISTING
CIRCUIT, NEW WIRING SHALL BE PROVIDED AS REQUIRED TO ENSURE
CONTINUITY OF EXISTING CIRCUIT. ELECTRICAL RACEWAYS WHERE
STUBBED FROM A CONCRETE FLOOR OR WALL SHALL BE CHISELED 2
INCHES BELOW SURFACE, GROUTED AND SCREED.
4. ALL EXISTING LIGHT FIXTURES, LAMPS, AND ELECTRICAL EQUIPMENT
SHOWN TO BE REMOVED SHALL BE REMOVED BY THE CONTRACTOR.
EXISTING FIXTURES AND EQUIPMENT CONSIDERED SALVAGEABLE BY
THE OWNER AND NOT SHOWN TO BE REUSED SHALL BE TURNED OVER
TO THE OWNER OR REMOVED FROM SITE AS DIRECTED BY OWNER.
LAMPS AND BALLASTS THAT ARE CONSIDERED AS HAZARDOUS WASTE
SHALL BE DISPOSED OF PROPERLY.
5. ALL EXISTING SURFACE MOUNTED BACK BOXES, CONDUIT, WIREWAY,
JUNCTION BOXES, ETC. SHOWN REMOVED SHALL BE REMOVED IN THEIR
ENTIRETY. ALL RECESSED BACKBOXES, JUNCTION BOXES SHOWN
REMOVED SHALL BE ABANDONED IN PLACE AND COVERED WITH
STAINLESS STEEL COVER PLATES. ALL RECESSED CONDUIT SHALL BE
ABANDONED IN PLACE AND CAPPED OFF IN A SUITABLE MANNER PER
LOCAL INSPECTORS REQUIREMENTS.
6. REMOVE ELECTRICAL CONNECTIONS TO ALL MECHANICAL AND
PROCESS EQUIPMENT BEING REMOVED BY OTHER CONTRACTORS.
COORDINATE EQUIPMENT REMOVAL LOCATIONS WITH OTHER
DRAWINGS.
7. ALL EQUIPMENT AND DEVICES SHOWN TO BE REMOVED ON THIS SHEET
ARE CIRCUITED FROM EITHER MCC-1 (480V), LP2 (120/208V)OR AFD'S
(480V) UNLESS OTHERWISE NOTED. SEE MCC-1 DEMOLITION ONE LINE
FOR 480V LOADS, ALL OTHER LOADS ARE FED FROM LP2.
8. EXISTING CONDUIT, WIREWAY, JUNCTION BOXES, ETC. MAY BE RE-USED
AFTER CLEANING AND SWABING. RE-USED RACEWAYS SHALL MEET THE
REQUIREMENTS OF THE NEC.
9. SEE DEMOLITION ONE LINE DIAGRAMS FOR INSTRUMENTATION AND
CONTROL DEMOLITION.
10. SEE SPECIFICATION SECTION 01 27 00 FOR DESCRIPTION OF BID
OPTIONS.
GENERAL NOTESKEYNOTES - DEMOLITION
# DESCRIPTION
X02 JUNCTION BOX CONTAINS THERMOSTAT
HEAT TRACING CIRCUIT THAT SERVES
THE PROCESS LINE TO THE EXISTING
AERATION BASIN. REMOVE JUNCTION
BOX, CONDUITS, AND WIRING AS
REQUIRED AND PROVIDE A NEW HEAT
TRACE CIRCUIT FOR THE EXISTING LINE.
X03 BASE BID: AIR COMPRESSOR TO BE
RELOCATED, REWIRED AS SHOWN ON
03-E602 AND 00-E601. BID OPTION 3: AIR
COMPRESSOR TO BE REMOVED.
KEYNOTES - DEMOLITION
# DESCRIPTION
X05 BID OPTION #1: CENTRIFUGE FEED PUMP
CFP-1 AND ASSOCIATED INSTRUMENTS
AND WIRING TO BE REMOVED. BASE BID:
CENTRIFUGE FEED PUMP CFP-1
CONTROL PANEL CFP-1 AFD, PRESSURE
SWITCHES PSLL-210 AND PSHH-213 TO
REMAIN IN PLACE, REWIRED AS SHOWN
ON 03-E602 AND 00-E601.
X06 BID OPTION #1: ASG-1 AND ASSOCIATED
WIRING TO BE REMOVED. BASE BID:
GRINDER ASG-1 TO REMAIN, REWIRED
AS SHOWN ON 03-E602 AND 00-E601.
IC
SV
SV
SV
T
SS
CFP-1 AFD
B-1 AFD
PLC-2
M C
C
CHANNEL
SCREEN FS-1
EXISTING
LP3 TO
REMIAN
T -L
P
CENTRIFUGE C-1
CONTROL PANEL
B-3 AFD
B-2 AFD
SCREEN FS-1
CONTROL PANEL
CENTRIFUGE
C-1
PF-1 PF-2
IC-1
EUH-2
DEWATERING
POLYMER SKID
IC-1
X01
X07
X07
X10
X08
X09
X10
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-E
.r v t
/9
/2
:0
:5
A M
X106
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
SOUTH BUILDING UPPER
LEVEL ELECTRICAL
DEMOLITION PLAN
GB
KLG
06/13/23
MTJ
18678703-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
SOUTH BUILDING UPPER LEVEL ELECTRICAL DEMOLITION PLAN
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING, PAINTING
OR REPLACEMENT OF ALL WALL, CEILING, OR OTHER BUILDING
ELEMENTS WHICH ARE DISTURBED AS PART OF THE DEMOLITION OR
INSTALLATION OF ELECTRICAL WORK.
2. THE CONTRACTOR SHALL COMPLETELY REMOVE ALL SWITCHES,
DISCONNECTS, LIGHTING FIXTURES AND OTHER ASSOCIATED ITEMS AS
SHOWN (CROSSHATCHED). REMOVE ASSOCIATED WIRING AND
RACEWAYS UNLESS NOTED OTHERWISE. THE ITEMS INDICATED
SPECIFICALLY ON THE DRAWINGS TO BE REMOVED ARE ONLY TO
INDICATE IN GENERAL TO THE CONTRACTOR THE AMOUNT OF
DEMOLITION WORK INVOLVED. A SITE INVESTIGATION BY THE
CONTRACTOR SHOULD BE PERFORMED TO AID IN DETERMINING THE
COMPLETE EXTENT OF WORK INVOLVED.
3. ALL EXISTING BRANCH CIRCUITS BEING REMOVED SHALL BE REMOVED
AS COMPLETE AS POSSIBLE. EXISTING CONDUCTORS SHALL BE
REMOVED COMPLETELY FROM THEIR RACEWAYS, REMOVED FROM SITE
AND NOT REUSED EXCEPT WHERE SPECIFICALLY NOTED OTHERWISE.
WHERE AN EXISTING DEVICE IS SHOWN REMOVED FROM AN EXISTING
CIRCUIT, NEW WIRING SHALL BE PROVIDED AS REQUIRED TO ENSURE
CONTINUITY OF EXISTING CIRCUIT. ELECTRICAL RACEWAYS WHERE
STUBBED FROM A CONCRETE FLOOR OR WALL SHALL BE CHISELED 2
INCHES BELOW SURFACE, GROUTED AND SCREED.
4. ALL EXISTING LIGHT FIXTURES, LAMPS, AND ELECTRICAL EQUIPMENT
SHOWN TO BE REMOVED SHALL BE REMOVED BY THE CONTRACTOR.
EXISTING FIXTURES AND EQUIPMENT CONSIDERED SALVAGEABLE BY
THE OWNER AND NOT SHOWN TO BE REUSED SHALL BE TURNED OVER
TO THE OWNER OR REMOVED FROM SITE AS DIRECTED BY OWNER.
LAMPS AND BALLASTS THAT ARE CONSIDERED AS HAZARDOUS WASTE
SHALL BE DISPOSED OF PROPERLY.
5. ALL EXISTING SURFACE MOUNTED BACK BOXES, CONDUIT, WIREWAY,
JUNCTION BOXES, ETC. SHOWN REMOVED SHALL BE REMOVED IN THEIR
ENTIRETY. ALL RECESSED BACKBOXES, JUNCTION BOXES SHOWN
REMOVED SHALL BE ABANDONED IN PLACE AND COVERED WITH
STAINLESS STEEL COVER PLATES. ALL RECESSED CONDUIT SHALL BE
ABANDONED IN PLACE AND CAPPED OFF IN A SUITABLE MANNER PER
LOCAL INSPECTORS REQUIREMENTS.
6. REMOVE ELECTRICAL CONNECTIONS TO ALL MECHANICAL AND
PROCESS EQUIPMENT BEING REMOVED BY OTHER CONTRACTORS.
COORDINATE EQUIPMENT REMOVAL LOCATIONS WITH OTHER
DRAWINGS.
7. ALL EQUIPMENT AND DEVICES SHOWN TO BE REMOVED ON THIS SHEET
ARE CIRCUITED FROM EITHER MCC-1 (480V), LP2 (120/208V)OR AFD'S
(480V) UNLESS OTHERWISE NOTED. SEE MCC-1 DEMOLITION ONE LINE
FOR 480V LOADS, ALL OTHER LOADS ARE FED FROM LP2.
8. EXISTING CONDUIT, WIREWAY, JUNCTION BOXES, ETC. MAY BE RE-USED
AFTER CLEANING AND SWABING. RE-USED RACEWAYS SHALL MEET THE
REQUIREMENTS OF THE NEC.
9. SEE DEMOLITION ONE LINE DIAGRAMS FOR INSTRUMENTATION AND
CONTROL DEMOLITION.
10. SEE SPECIFICATION SECTION 01 27 00 FOR DESCRIPTION OF BID
OPTIONS.
GENERAL NOTES
KEYNOTES - DEMOLITION
# DESCRIPTION
X01 DEMOLISH MCC2 AFTER BOTH PROCESS
TRAINS ARE OPERATIONAL.
X07 BID OPTION #1: REMOVE CONVEYOR AND
ALL ASSOCIATED EQUIPMENT. BASE BID:
INCLINED SCREW CONVEYOR IC-1,
CONTROL PANEL, AND ASSOCIATED
EQUIPMENT TO REMAIN, REWIRED AS
SHOWN ON 03-E602 AND 00-E601.
X08 BID OPTION #1: REMOVE DEWATERING
POLYMER PUMP AND ALL ASSOCIATED
EQUIPMENT. BASE BID: DEWATERING
POLYMER PUMP, CONTROL PANEL, AND
ASSOCIATED EQUIPMENT TO REMAIN,
REWIRED AS SHOWN IN 00-E601.
X09 BID OPTION #1: CFP-1 AND ASSOCIATED
EQUIPMENT TO BE REMOVED. BASE BID:
CENTRIFUGE FEED PUMP CFP-1,
CONTROL PANEL CFP-1 AFD, PRESSURE
SWITCHES PSLL-210 AND PSHH-213 TO
REMAIN, REWIRED AS SHOWN ON
03-E602 AND 00-E601.
X10 BID OPTION #1: C-1 AND ASSOCIATED
EQUIPMENT TO BE REMOVED. BASE BID:
CENTRIFUGE C-1 AND CONTROL PANEL
TO REMAIN, REWIRED AS SHOWN ON
03-E602 AND 00-E601.
SA
?4
1/2
2 15 15 15
LP3 XFMR
45KVA ,3PH
480:208Y/120V
LP-3
120/208V
3PH,
4W
5 35 7.5 3
?4
45KVA ,3PH
480:208Y/120V
LP-6
120/208V
3PH,
4W
?4
1 1/2
?4
7 1/2
EXISTING MCC-2 600A, 480/277V, 3 PHASE, 4W, 22KAIC
350A 3P
EXISTING MCC-2 600A, 480/277V, 3 PHASE, 4W, 22KAIC (CONTINUED)
S U
R G
E A
R R
E S
T O
R 3#
8, #8 G
, 1 "C
C H
A N
N E
L S
C R
E E
N
C O
N T
R O
L P
A N
E L
F S
-1
3#
,1 #1
2G , 3
/4 "C
20A 3P
3#
, 4 /C
#1 4, #1
2G , 1
"C P
R O
P E
LL
E
R F
A N
P F
-1 F
R O
M E
X
IS
T
IN
G
M
C -1
B
LO
W
R
B -1
3# 8, 1#
G , 1
"C
30A 3P
30A 3P
30A 3P
B
LO
W
-2
B
LO
W
-3
3# 8, 1#
G , 1
"C
3# 8, 1#
G , 1
"C
45A 3P 20A
3P
C E
N T
R
IF
U G
E F
E
D
P U
P
F P
-1
3#
,1 #1
2G , 3
/4 "C
100A 3P
C E
N T
R
IF
U G
E M
IV
E 3#
2, 1#
6G , 1
/4
"C
C E
N T
R
IF
U
C K
D R
IV
E
20A 3P
IN
C
LI
N
E D
S C
R
W
O
N V
E Y
O R
IC
-1
3#
,1 #1
2G , 3
/4 "C
3#
, 1 #1
2, #1 4, 3/
4" C
30A 3P
S U
B M
E R
S
IB
LE
IX
E R
S M
-1
3#
, 1 #1
0, /4 "C
30A 3P
G R
IN
D
E R
A S
G -1
20A 3P
30A 3P
3#
, 1 #1
2, /4 "C
R E
C Y
C
LE
P U
M P
A R
P -2
AFD
45A 3P
3#4, 1#8G, 1 1/4"C
45A 3P
3#4, 1#8G, 1 1/4"C
4#2, 1#8G, 1 1/2"C
SOLIDS
DEWATERING
BUILDING MAIN
DISCONNECT
S O
LI
S
W A
T E
R
U
IL
D
IN
G
F E
E D
E R
3#
, 1 #1
2, /4 "C
E
LE
C T
R
IC
U N
IT
H
E A
T E
R E
U H
-1
20A 3P
30A 3P
3#
, 4 /C
#1 4, #1
2G , 1
"C D
U C
T F
A N
D F
-1
3#
, 1 #1
2, /4 "C
E
LE
C T
R
IC
U N
IT
H
E A
T E
R E
U H
-2
20A 3P
30A 3P
3# 8, #1
0, /4 "C
A
IR
C O
M P
R E
S S
O R
25A 3P
3#
, 1 #1
2G , 3
/4 "C
M A
G N
E S
IU
H
Y D
R O
X
ID
E M
IX
E
R M
H M
X -1
AFDAFDAFDAFD
A
IR
C O
O
LE
R (T
O B
E R
E
LO
C A
T E
D
X11 X11 X11 X11 X11
X16
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-E
.r v t
/9
/2
:0
:5
A M
X601
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
SOUTH BUILDING
ELECTRICAL MCC-2
ONE-LINE - DEMO
GB
KLG
06/13/23
MTJ
18678703-
FINAL CONSTRUCTION DOCUMENTS
KEYNOTES - DEMOLITION
# DESCRIPTION
X11 BID OPTION #1: EQUIPMENT TO BE
REMOVED. BASE BID: EQUIPMENT TO
REMAIN, REWIRED AS SHOWN ON
03-E602 AND 00-E601.
X16 BID OPTION #3: EQUIPMENT TO BE
REMOVED. BASE BID: EQUIPMENT TO
REMAIN, REWIRES AS SHOWN ON
03-E602 AND 00-E601.
GENERAL NOTES
1. SEE SPECIFICATION SECTION 01 27 00 FOR DESCRIPTION OF BID
OPTIONS.
X07
X09 X10
X06
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-E
.r v t
/9
/2
:0
:0
A M
X602
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
SOUTH BUILDING MISC
ONE-LINE - DEMO
GB
KLG
06/13/23
MTJ
18678703-
FINAL CONSTRUCTION DOCUMENTS
KEYNOTES - DEMOLITION
# DESCRIPTION
X06 BID OPTION #1: ASG-1 AND ASSOCIATED
WIRING TO BE REMOVED. BASE BID:
GRINDER ASG-1 TO REMAIN, REWIRED
AS SHOWN ON 03-E602 AND 00-E601.
X07 BID OPTION #1: REMOVE CONVEYOR AND
ALL ASSOCIATED EQUIPMENT. BASE BID:
INCLINED SCREW CONVEYOR IC-1,
CONTROL PANEL, AND ASSOCIATED
EQUIPMENT TO REMAIN, REWIRED AS
SHOWN ON 03-E602 AND 00-E601.
X09 BID OPTION #1: CFP-1 AND ASSOCIATED
EQUIPMENT TO BE REMOVED. BASE BID:
CENTRIFUGE FEED PUMP CFP-1,
CONTROL PANEL CFP-1 AFD, PRESSURE
SWITCHES PSLL-210 AND PSHH-213 TO
REMAIN, REWIRED AS SHOWN ON
03-E602 AND 00-E601.
X10 BID OPTION #1: C-1 AND ASSOCIATED
EQUIPMENT TO BE REMOVED. BASE BID:
CENTRIFUGE C-1 AND CONTROL PANEL
TO REMAIN, REWIRED AS SHOWN ON
03-E602 AND 00-E601.
GENERAL NOTES
X15 X15 X15 X15 X15 X15 X15X15
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-E
.r v t
/9
/2
:0
:0
A M
X603
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
SOUTH BUILDING MISC
ONE-LINE - DEMO
GB
KLG
06/13/23
MTJ
18678703-
FINAL CONSTRUCTION DOCUMENTS
GENERAL NOTES
1. PORTIONS OF EXISTING CONDUITS MAY BE REUSED FOR NEW WORK.
PROVIDED THE CONDUITS ARE FOUND TO BE IN GOOD CONDITION. THE
CONTRACTOR SHALL DETERMINE WHICH, IF ANY CONDUITS ARE
SUITABLE FOR REUSE.
2. SEE SPECIFICATION SECTION 01 27 00 FOR DESCRIPTION OF BID
OPTIONS.
KEYNOTES - DEMOLITION
# DESCRIPTION
X15 BID OPTION #1: EQUIPMENT TO BE
REMOVED. BASE BID: EQUIPMENT TO
REMAIN, REWIRED AS SHOWN ON
00-E601.
UP
TOC = 97'-5"
TOC = 97'-4 1/2"
TOC = 95'-6"
6" SLAB ON GRADE W/ #5@12 EW,
CENTERED. PROVIDE 15 MIL VAPOR
BARRIER OVER 24" COMPACTED
GRANULAR FILL.
TOC = 100'-0"
EQUIPMENT PAD
SLOPE
SLOPE
S
LO
P E
S
LO
P E
STAIRS,
SEE ARCH
TOC = 97'-4"
EXISTING
RETAINING WALL
FOUNDATION
2'-0"
1'-2"
2'-0"
NOTE 2
NOTE 2
EXISTING
APPROACH SLAB
5' -0
STOOP TYPICAL
SEE 3/00-S502
THICKENED
SLAB
TOF = 96'-0"
F8.0
97'-0"
ISOLATION JOINT, SEE
DETAIL 9/00-S501
TOC = 97'-6"
8" MASONRY
WALL, TYPE '8A'
8' -3
1'
-0
8' -3
/2
1'
-2
8' -5
/2
6'-8" 1'-0" 29'-11 1/2"
2'-8" 5'-7 1/2" 2'-0" 8'-0" 8'-0" 17'-10 1/2" 5'-0" 1'-1" 2'-0"
5' -8
'-7
/2
2" E
J
5' -5
/2
'-0
9' -4
11"
EQUIPMENT PAD
5' -0
5' -9
/2
'-0
'-2
/2
APPROACH SLAB
SEE 4/00-S502
2" EXP JOINT BETWEEN
NEW AND EXISTING
STRUCTURES
SEE 2/00-S504 TYP
" S
Q C
OLU
M N
" S
Q C
OLU
M N
FD
EQUIPMENT
PAD
03-S301
03-S301
03-S301
03-S302
03-S301
'-8
/2
2" E
J F
.V
1' -1
1"
5' -2
INTERCEPTOR
SEE PLUMBING
5' -0
1' -4
F
.V
2'-0"X2'-0"X3'-9"
SUMP PIT
10" MASONRY WALL,
TYPE '10A'
14'-7" 3'-3" 19'-10"
TOW = 99'-0"
2'-0" 1'-2" 2'-0"
2' -0
1'
-2
2' -0
2'-0" 1'-2" 2'-0"
10'-0"
1'-9"X1'-9"X1'-10"
SUMP PIT
TOF = 96'-0"
7'-8"
9' -6
03-S302
F6.0
97'-0"
1' -0
SEE NOTE 8
FOOTING SCHEDULE
MARK SIZE
LENGTH x WIDTH x DEPTH
REINFORCING REMARKS
F6.0 6'-0" x 6'-0" x 1'-6" 7-#6 EW T&B
STD HK EE
OF REINF
F8.0 8'-0" x 7'-0" x 1'-6" 9-#6 T&B N/S 8-#6 T&B E/W
STD HK EE
OF REINF
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-S
.r v t
-J u n -2
S101
MOUNT RUSHMORE NATIONAL MEMORIAL
272051
SOUTH BUILDING
FOUNDATION PLAN
GS
SKM
06/13/23
TJH
18678703-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
SOUTH BUILDING FOUNDATION PLAN
GENERAL NOTES:
1. SEE SHEET 00-S001 FOR GENERAL STRUCTURAL NOTES.
2. FOR TYPICAL STRUCTURAL DETAILS, SEE SHEETS 00-S
SERIES SHEETS.
SHEET NOTES:
1. FINISH FLOOR ELEVATION 100'-0" = SITE CIVIL ELEVATION
4991.33. CONTRACTOR TO VERIFY EXISTING FINISH FLOOR
ELEVATION BEFORE BEGINNING CONSTRUCTION.
2. INDICATES SPAN DIRECTION OF 1 1/2" GRATING.
3. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL
INFORMATION ON THICKENED, SLOPED, OR DEPRESSED
SLABS.
4. SEE PROCESS SHEETS FOR ADDITIONAL INFORMATION ON
FLOOR DRAINS (FD), FLOOR CLEANOUT (CO), AND TRENCH
DRAIN (TD) LOCATIONS.
5. COORDINATE SIZE AND LOCATION OF EQUIPMENT PADS WITH
MECHANICAL, ELECTRICAL, AND PROCESS DRAWINGS. SEE
STRUCTURAL DRAWINGS FOR TYPICAL EQUIPMENT PAD
DETAILS UNLESS NOTED OTHERWISE.
6. INDICATES SLOPE DOWN DIRECTION OF SLAB OR
CONCRETE TOPPING.
7. SEE DETAIL 3/00-S503 MASONRY REINFORCING SCHEDULE.
8. 8" WIDE x 6" DEEP TRENCH. SLOPE TRENCH 1/8" / 1'-0" TOWARD
SUMP PIT WITH COVER RATED FOR GARAGE TRAFFIC.
9. 2 1/2" ZIP SYSTEM TO BE FASTENED TO CONCRETE AND
MASONRY PER MANUFACTURER RECOMMENDATIONS. SEE
ARCHITECTURAL.
SLOPE
06/13/23
10" SLAB W/ #5@6 EW, T&B.
TOC = 115'-8"
NORTH/SOUTH BARS ARE
EXTERIOR BARS
SEE SHEET NOTE 7 FOR
ADDITIONAL REQ.
2" EXP JOINT BETWEEN
NEW AND EXISTING
STRUCTURES
8" MASONRY
WALL, TYPE ‘8A’
CONCRETE
CONTAINMENT
CURB
STAIRS,
SEE ARCH
MASONRY WALL
BELOW, TYP
B16x24
B16x24
2" EXP JOINT
BETWEEN NEW
STRUCTURE AND
GARAGE
8" MASONRY WALL,
TYPE '8B'
M L-
M
L-
6' -1
/2
" 1' -4
9' -8
1' -4
8' -8
4"
9" (TYP)
03-S301
6' -7
/2
'-0
9' -4
EQUIPMENT
PAD, TYP SEE
DETAIL 5/00-S502
TOC
EL 117’-0”
TOC
EL 116’-0”
TOC
EL 116’-0”
TOC
EL 116’-0”
10" TYP
03-S301 7
03-S301
03-S301
00-S505
00-S505
5" T
Y P
10" MASONRY WALL,
TYPE '10A'
TOC
EL 116’-0”
03-S301
WALL STEP
MASONRY INFILL,
SEE ARCH
03-S301
EQUIPMENT
PAD
03-S303
03-S303
PRECAST LINTEL
TOC EL 114’-0”
10" MASONRY
WALL, TYPE '10A'
(F.V. CLEAR OPENING)
15'-10"
SEE DETAILS 5 AND
6/03S-303 FOR FRAMING
AT GARAGE DOOR
FLOOR DRAIN IN EXISTING SLAB.
AVOID CORING THROUGH
REINF. PLACE DRAIN BETWEEN
REINFORCING MATS.
SLAB OPENING
TYP, SEE MECH
B16x24
'-7
/2
8'-3 1/2"
EQUIPMENT PAD, TYP SEE
DETAIL 6/00-S502. SIZE PAD
PER MANUFACTURER
REQUIREMENTS.
NEW OPENING IN EXISTING
SLAB. AVOID CORING THROUGH
REINF. PLACE PIPING BETWEEN
REINFORCING MATS.
TOC
EL 119’-0”
TOC
EL 117’-3”
TOC
EL 119’-0”
TOC
EL 117’-3”
NEW OPENING IN EXISTING WALL.
CONTRACTOR TO SCAN WALL TO
AVOID CUTTING THROUGH REINF.
REVISE LAYOUT AS REQUIRED TO
AVOID VERTICAL WALL REINF.
SEE 1/03-S303 FOR LINTEL DETAIL.
NEW OPENING IN EXISTING
WALL. CONTRACTOR TO SCAN
WALL TO AVOID CUTTING
THROUGH REINF. REVISE
LAYOUT AS REQUIRED TO
AVOID VERTICAL WALL REINF.
S1
PROVIDE LIFTING HOOK IN
SLAB FOR TANK BELOW.
ANCHOR HOOK TO SLAB
PER MANUFACTURER
SPECIFICATIONS.
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-S
.r v t
-J u n -2
S102
MOUNT RUSHMORE NATIONAL MEMORIAL
272051
SOUTH BUILDING UPPER
LEVEL FLOOR PLAN
GS
SKM
06/13/23
TJH
18678703-
FINAL CONSTRUCTION DOCUMENTS
1/4" = 1'-0"
SOUTH BUILDING UPPER LEVEL FLOOR PLAN
GENERAL NOTES:
1. SEE SHEET 00-S001 FOR GENERAL STRUCTURAL NOTES.
2. FOR TYPICAL STRUCTURAL DETAILS, SEE SHEETS 00-S
SERIES SHEETS.
SHEET NOTES:
1. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL
INFORMATION ON THICKENED, SLOPED, OR DEPRESSED
SLABS.
2. SEE PROCESS SHEETS FOR ADDITIONAL INFORMATION ON
FLOOR DRAINS (FD), FLOOR CLEANOUT (CO), AND TRENCH
DRAIN (TD) LOCATIONS.
3. COORDINATE SIZE AND LOCATION OF EQUIPMENT PADS
WITH MECHANICAL, ELECTRICAL, AND PROCESS
DRAWINGS. SEE STRUCTURAL DRAWINGS FOR TYPICAL
EQUIPMENT PAD DETAILS UNLESS NOTED OTHERWISE.
4. SEE DETAIL 3/00-S503 MASONRY REINFORCING SCHEDULE.
5. ALL FRAMING TO BE DOUGLAS-FIR NO. 1. UNLESS NOTED
OTHERWISE. WOOD IN CONTACT WITH CONCRETE TO BE
GREEN PRESSURE TREATED.
6. 2 1/2" ZIP SYSTEM TO BE FASTENED TO CONCRETE AND
MASONRY PER MANUFACTURER RECOMMENDATIONS. SEE
ARCHITECTURAL.
7. TERMINATE TOP NORTH/SOUTH BARS WITH 180 DEG HOOK
AT CANTILEVERED END. ROTATE BARS AS NECESSAR TO
MAINTAIN COVER.
BID OPTION #1 INCLUDES NEW CENTRIFUGE PADS AND
NEW OPENINGS IN EXISTING STRUCTURE TO SUPPORT
NEW EQUIPMENT PIPING AND CONVEYERS. BASE BID WLL
USE EXISTING CENTRIFUGE PADS.
KEYNOTE:
S1
JOIST BEARING
2-2X8
S
P A
C E
S
'-0
O
C
7'
-0
JOIST BEARING
T2-SHORT
T2-SHORT
T2
T2
T2
T2
T2
T2-SHORT
T2 - SHORT
1' -3
S P
A C
IN
G
S O
F
'-0
O C
4' -0
2'
-2
1' -2
/2
T 3-
S H
O R
T
3'-0" 18 SPACINGS OF 2'-0" = 36'-0" 3'-0"
T 3-
S H
O R
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T 3-
S H
O R
T
2- T
3- S
H O
R T
W16X45 CONT
TRUSS BEARING
TRUSS BEARING
2" EXP JOINT BETWEEN
NEW AND EXISTING
STRUCTURES
2" EXP JOINT
BETWEEN NEW
STRUCTURE AND
GARAGE
S
LO
P E
SLOPE
SLOPE
2X8
2X8
2X8
2X8
2X8
2X8
2X8
2X8
2X8
2X8
2X8
2X8
2X82-2X8
2X6
2X
2X6 2X6
2X
2X
2X
2X6
2X6
PRE-ENGINEERED
WOOD TRUSS
2X6 LADDER
FRAMING @ 24" OC
DOUBLE TRUSS
2-2X6 BLOCKING
ABOVE WALL TYP
2X
2X6 LADDER
FRAMING @ 24" OC
2-2X6 BLOCKING
ABOVE WALL TYP
03-S302
03-S302
ML-2
ML-1
ML-2 ML-2
M L-
M
L-
M L-
M L-
BRIDGING AS
REQUIRED BY
TRUSS MFR
BLOCKING AT
1/4 POINTS
TYP
TYP
TYP
S302
TYP
BRIDGING AS
REQUIRED BY
TRUSS MFR
TYP
TYP
TOC
EL 126' - 2 3/8"
TOS = 127’-6 1/2”
03-S302
03-S302
03-S302
EL 127’-5 1/2”
EL 128’-7 1/4”
TRUSS BEARING
EL 127’-9 1/2”
EL 124’-9 1/2”
TRUSS BEARING
EL 124’-9 1/2”
EL 127'-9 1/2”
ML-1
2X8
2X8
2X8
2X8
2X8
2X8
2X8
2X8
2X8
2X8
2X8
2X8
2X8
TPL 2X8
03-S302
2X6 LADDER
FRAMING @ 24" OC
W16X31
TOS = 125’-8”1
03-S303
6' -1
1/
2"
'-5
NOTE 3
N O
T E
14'-10"
1/
2"
2X
'-8
03-S303
CONVEYERS TO BE SUPPORTED
FROM ROOF RAFTERS. MAX LOAD
PER RAFTER TO BE 250 LBS AT
MIDSPAN.
DL + LL
DL + DRIFT SNOW LOAD
DL + SNOW LOAD
DL + WIND LOAD
LL(1)=20PSF
NOTES:
1. DESIGN BOTTOM CHORD: DL = 10PSF & LL = 10PSF
DL(1)=14PSF
NOTES:
1. DESIGN BOTTOM CHORD: DL = 10PSF & LL = 10PSF
SL(1)=47PSF
DL(1)=14PSF
DL(2)=24PSF
NOTES:
1. DESIGN BOTTOM CHORD: DL = 10PSF & LL = 10PSF
DL(2)=24PSF
DL(1)=7PSF
DL(2)=10PSF
NOTES:
DL(2)=10PSF
SL(1)=47PSF
SL(2)=62PSF
DL(2)=24PSF
DL(2)=24PSF
GENERAL NOTES:
1. WIND LOADS ARE ULTIMATE LOADS.
2. TRUSS MANUFACTURER TO INCLUDE OUTRIGGER LOADS TO ASSOCIATED
TRUSSES SHOWN ON PLANS, DL=24 PSF, LL=20 PSF, SL=47 PSF.
OVERHANG
SEE PLANS
SPAN - SEE PLANS
OVERHANG
SEE PLANS
OVERHANG
SEE PLANS
SPAN - SEE PLANS
OVERHANG
SEE PLANS
OVERHANG
SEE PLANS
SPAN - SEE PLANS
OVERHANG
SEE PLANS
OVERHANG
SEE PLANS
SPAN - SEE PLANS
OVERHANG
SEE PLANS
6'
1. DESIGN BOTTOM CHORD: DL = 2PSF
2. SEE PRE-ENGINEERED WOOD TRUSS
WIND UPLIFT DIAGRAM FOR TRUSS WIND
UPLIFT PRESSURES.
3. WIND UPLIFT LOADS ACT NORMAL TO THE
ROOF SURFACE.
SEE NOTE 2, TYP
DL(1)=14PSF
DL(2)=24PSF DL(2)=24PSF
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-S
.r v t
-J u n -2
S103
MOUNT RUSHMORE NATIONAL MEMORIAL
272051
SOUTH BUILDING ROOF
FRAMING PLAN AND TRUSS
LOADING DIAGRAMS
GS
SKM
06/13/23
TJH
18678703-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
SOUTH BUILDING ROOF FRAMING PLAN
GENERAL NOTES:
1. SEE SHEET 00-S001 FOR GENERAL STRUCTURAL NOTES.
2. FOR TYPICAL STRUCTURAL DETAILS, SEE SHEETS 00-S SERIES SHEETS.
NO SCALE
TRUSS LOADING DIAGRAMS2
SHEET NOTES:
1. TX INDICATES THE TRUSS TYPE, SEE TRUSS LOADING DIAGRAMS THIS SHEET
FOR LAYOUT. -SHORT INDICATES DROP TRUSS AT LADDER FRAMING.
2. INDICATES SLOPE DOWN DIRECTION OF ROOF TRUSSES.
3. INDICATES SPAN DIRECTION OF PLYWOOD. SANDWICH PANEL
SYSTEM 5/8" 40/20 PLYWOOD.
4. TOP OF MASONRY WALL EL = 121'-1 1/8" UNO.
5. PRE-ENGINEERED TRUSSES SHALL BE DESIGNED BY TRUSS MANUFACTURER.
6. SEE GENERAL NOTES FOR SHEATHING CONNECTION REQUIREMENTS.
7. TEMPORARY AND PERMANENT BRACING NOT SHOWN. SIZES AND LOCATIONS
OF BRACING TO BE DESIGNED BY CONTRACTOR'S ENGINEER AND SUBMITTED
ON SHOP DRAWING PRIOR TO CONSTRUCTION FOR REVIEW.
8. ML-X INDICATED MASONRY LINTEL, SEE DETAIL 1 ON SHEET 00-S503 FOR
MASONRY LINTEL DETAIL.
9. BRIDGING LAYOUT AND SIZING TO BE DESIGNED BY TRUSS MANUFACTURER.
10. ROOF RAFTERS OVER TRUCK BAY TO BE DOUGLAS-FIR DENSE SELECT
STRUCTURAL. UNLESS NOTED OTHERWISE. WOOD IN CONTACT WITH
CONCRETE TO BE GREEN PRESSURE TREATED.
11. ALL STEEL FRAMING TO BE GALVANIZED.
SLOPE
3"
LR
8"
1'-0" 2'-0" 1'-0"
2-#5 CONTINUOUS
LAP SPLICE
SEE PLAN
DOWELS TO MATCH VERT
WALL REINF ALTERNATE HOOK
CMU
VERT MASONRY WALL
REINF WHERE INDICATED
TOC
SEE PLAN
BOND BEAM, SEE CMU WALL
REINF SCHEDULE FOR REINF
MATCH SLAB REINF
IN SIZE & SPACING
LAP
BOND BEAM
SEE CMU WALL REINF
SCHEDULE FOR REINF
GALV L4x4x1/4"x2'-0" AT 4'-0"
OC MAX EA SIDE
1"
2-3/4" DIA EXPANSION ANCHOR
W/ 5" EMBED AT 10" OC
1" COMPRESSIBLE
FILLER
CONCRETE ROOF
SLAB REINFORCING
NOT SHOWN
CMU CUT TO FIT, FILL
SOLID WITH MORTAR
CMU WALL REINF W/
STD TOP HOOK
1/2" COMPRESSIBLE FILLER
BACKER ROD & SEALANT
00-S502
DOWELS TO MATCH VERT WALL
REINF ALTERNATE HOOK
CMU
VERT MASONRY WALL
REINF WHERE INDICATED
BOND BEAM, SEE CMU WALL
REINF SCHEDULE FOR REINF
LAP
#6@12 EW EF
2' -0
#5@12 T&B W/
STD HK EE
24" LAYER OF FREE
DRAINING GRANULAR
MATERIAL
MIN
6"
00-S502
3' -0
DOWELS TO MATCH VERT
WALL REINF ALTERNATE HOOK
CMU
VERT MASONRY WALL
REINF WHERE INDICATED
BOND BEAM, SEE CMU WALL
REINF SCHEDULE FOR REINF
LAP
#6@12 EW EF
#5@12 EW T&B
W/ STD HK EE
6" PVS WS
24" LAYER OF FREE
DRAINING GRANULAR
MATERIAL
MIN
6"
DOWELS TO MATCH VERT WALL REINF
ROTATE HK AS NEEDED TO MAINTAIN COVER
CMU
VERT MASONRY WALL
REINF WHERE INDICATED
BOND BEAM, SEE CMU WALL
REINF SCHEDULE FOR REINF
LAP
#5@12 T&B W/
STD HK EE
1/2" COMPRESSIBLE FILLER
BACKER ROD & SEALANT
1' -0
2'
-0
24" LAYER OF FREE DRAINING
GRANULAR MATERIAL
SLAB REINF, SEE PLAN
SEE PLAN SEE PLAN SEE PLAN
6-#5 CONT T&B TOF
SEE PLAN
MIN
6"
#6@12 EW EF
1' -0
2' -0
1'-4"
3-#7 BOTTOM W/ STD 90
DEGREE HOOK @ END
#4@12 STIRRUPS
2 LAYERS
3-#7 @ TOP
S E
E P
LA
N
SLAB REINFORCING
SEE PLAN
1'-2"
#3@12 TIES W/ 3 TIES
IN 5" AT TOP AND
BOTTOM OF COLUMN
8-#6 VERT
LAP
UPPER LEVEL
SEE PLAN
NOTE:
1. RUN T & B BEAM REINF FULL LENGTH OR SPLICE USING MECHANICAL
SPLICES. SEE SPECS FOR MECHANICAL SPLICE REQUIREMENTS.
2. WHERE UPPER LEVEL COLUMN IS NOT PRESENT, END COLUMN VERT
REINF W/STD HK AT TOP OF SLAB.
BOND BEAM, SEE CMU
WALL REINF SCHEDULE
FOR REINF
#3@12 U-BAR
DWL TO MATCH VERT
REINF ALTERNATE HK
VERT MASONRY WALL
REINF WHERE INDICATED
CMU
SEE PLAN
2-#5 CONT TOC
SEE PLAN
TOC
SEE PLAN
#6@16 ADHESIVE DOWEL W/
15" EMBEDMENT
CMU
VERT MASONRY WALL
REINF WHERE INDICATED
BOND BEAM, SEE CMU WALL
REINF SCHEDULE FOR REINF
LAP
EXISTING
WALL
TOC
SEE PLAN
SEE PLAN
1' -1
0"
TOC
SEE PLAN
T Y
P 2"
C
LR
CURB AND SLAB
REINF NOT SHOWN.
SEE DETAIL 2/00S-505
FOR REQUIREMENTS
3-#7 T&B W/ LENTON
TERMINATOR AT END.
EXTEND REINF 2'-0"
BEYOND EDGE OF
OPENING
#4@12 STIRRUPS
ASCALE
1 0 1 2
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-S
.r v t
-J u n -2
S301
MOUNT RUSHMORE NATIONAL MEMORIAL
272051
SOUTH BUILDING SECTIONSGS
SKM
06/13/23
TJH
18678703-
FINAL CONSTRUCTION DOCUMENTS
SCALE A
THICKENED SLAB DETAIL1
SCALE A
TYPICAL NON-LOAD BEARING CMU WALL SUPPORT @ CONCRETE FLOOR5
SCALE A
SECTION2
SCALE A
SECTION3
SCALE A
SECTION4
SCALE A
SECTION6
SCALE A
SECTION7
SCALE A
SECTION AT EXISTING WALL8
SCALE A
SECTION AT LINTEL9
TOP OF WALL
EL = SEE PLAN
NOTES:
1. SOFFIT ASSEMBLY NOT SHOWN, SEE ARCH DRAWINGS.
2. SEE PLYWOOD CONNECTION SCHEDULE FOR FASTENING REQUIREMENTS.
3. COORDINATE FASTENER REQUIRED FOR ATTACHMENT OF SIMPSON
CONNECTORS TO STRUCTURE TYP.
4. TRUSSES TO BE GREEN PRESSURE TREATED WHERE IN CONTACT WITH
MASONRY.
2X6 FASCIA
FRAMING
WOOD TRUSS
MATCH EXISTING
1'-3"
ROOF SHEATHING
SEE PLAN
PANEL EDGE NAILING
SEE PLYWOOD
CONNECTION SCHEDULE
CROSS BRACING BETWEEN
TRUSSES AS REQUIRED TO
TRANSFER SHEAR. COORDINATE
WITH SOFFIT VENTING
REQUIREMENTS, SEE ARCH
TRUSS SHEAR CONNECTION
BY TRUSS MFR, SEE SHEET
00-S001 FOR TRUSS DESIGN
NOTES AND LOADS
CONT BOND BEAM
SIMPSON STRONG TIE
LTA2 OR EQUAL AT FACE
OF EACH TRUSS
TOP OF WALL
EL = SEE PLAN
PANEL EDGE NAILING. SEE
PLYWOOD CONNECTION
SCHEDULE
DROP TOP CHORD OF
WOOD TRUSS
NOTES:
1. SOFFIT ASSEMBLY CONNECTION NOT SHOWN, SEE ARCH DRAWINGS.
2. SEE PLYWOOD CONNECTION SCHEDULE FOR FASTENING REQUIREMENTS,
3. PROVIDE DOUBLE TRUSS OR FLAT BLOCKING AS REQUIRED TO ACCOMODATE STRAP WIDTH.
4. COORDINATE FASTENERS REQUIRED FOR ATTACHMENT OF SIMPSON CONNECTORS TO
STRUCTURE TYP.
5. VERIFY SIZES.
6. TRUSSES TO BE GREEN PRESSURE TREATED WHERE IN CONTACT WITH MASONRY.
PER PLAN
SPACING
2X6 WOOD BLOCKING BETWEEN
EACH LADDER FRAMING
2X6 LADDER FRAMING @ 24"
OC W/ CS14 STRAP @ 24" OC
TYP. SIMPSON LUS26
HANGER TO TRUSS
2X6 MIN BLOCKING.
SEE PLAN FOR LIMITS
OF BLOCKING
WOOD TRUSS
SEE PLAN
CONT BOND BEAM
TRUSS SHEAR CONNECTION BY
TRUSS MFR, SEE SHEET 00-S001 FOR
TRUSS DESIGN NOTES AND LOADS
2X6 FRAMING
SIMPSON STRONG
TIE LTA2 OR EQUAL
AT FACE OF TRUSS
@ 2'-0" OC
TRIM LADDER FRAMING
TAIL TO BE 2X4
24" LAYER OF FREE DRAINING
GRANULAR MATERIAL
TOF
SEE PLAN
48" LAYER OF FREE DRAINING
GRANULAR MATERIAL
COL REINF, SEE
DETAIL 6/03-S301
SLAB REINF,
SEE PLAN
REINF, SEE PLAN
AND SCHEDULE
S E
E P
LA
N
SEE PLAN
DOWELS TO
MATCH COL REINF
LAP
MIN
6"
1/2" COMPRESSIBLE
FILLER BACKER ROD
& SEALANT TYPICAL
FINGER TIGHTEN
NUTS AND UPSET
THREADS. TYP UNO
PROVIDE 3"LONG
SLOTTED HOLES IN
BEAM FLANGE
BEARING PLATE,
SEE SCHEDULE
1" NON-SHRINK
GROUT MIN
STEEL BEAM
2-3/4" DIA x 1'-3"
HEADED ANCHOR
BOLTS AND WASHERS
U N
O
2' -0
MIN
1' - 4"
MIIN
1'-4"
FILL ALL SHADED
AREAS WITH GROUT
NOTE:
1. PROVIDE BEAM POCKET AND GROUT FULL AFTER BEAM IS IN PLACE.
SCHEDULE
SEE
TOP OF WALL
EL = SEE PLAN
NOTE:
1. SOFFIT ASSEMBLY NOT SHOWN, SEE ARCH DRAWINGS.
2. SEE PLYWOOD CONNECTION SCHEDULE FOR FASTENING REQUIREMENTS.
3. COORDINATE FASTENER REQUIRED FOR ATTACHMENT OF SIMPSON
CONNECTORS TO STRUCTURE TYP.
4. WOOD TO BE GREEN PRESSURE TREATED WHERE IN CONTACT WITH
MASONRY.
2X8 ROOF RAFTER
ROOF SHEATHING, SEE PLAN.
SEE PLYWOOD CONNECTION
SCHEDULE FOR ATTACHMENT
CONT BOND BEAM
NOTCH ROOF JOIST TO
PROVIDE HORIZONTAL
BEARING AT 2X8 MEMBER
1" GAP
CONT 2X8
PROVIDE L2x2x1/4 x 3" WITH LONG
SLOTTED HOLE FOR 5/8" BOLT
BOTH SIDES OF JOIST. FASTEN
TO 2X8 WITH STRONG DRIVE TB
WOOD TO STEEL CONNECTOR
OR APPROVED EQUAL
SLOPE
3 1/2"
2X4 FASCIA FRAMING
TOP OF WALL
EL = SEE PLAN
2X8 ROOF RAFTER
BEYOND
CONT BOND BEAM
CONT 2X8 ANCHORED TO MASONRY WITH
5/8" DIA x 1'-6" ANCHOR CAST INTO BOND
BEAM @ 2'-0" OC. PROVIDE 2"X2"X3/16"
PLATE WASHER
NOTE:
1. WOOD TO BE GREEN PRESSURE TREATED WHERE IN CONTACT
WITH MASONRY.
SLOPE
ROOF SHEATHING, SEE PLAN.
SEE PLYWOOD CONNECTION
SCHEDULE FOR ATTACHMENT SLOPE
SIMPSON STRONG TIE HU28 FACE
MOUNT HANGER OR APPROVED
EQUAL. PROVIDE SLOPED SEAT
AS REQUIRED FOR ROOF SLOPE
2X8 ROOF JOIST
2X8 CONT LEDGER BOARD
SEE ARCH FOR CLOSURE ABOVE LEDGER
EXISTING WALL
SLOPE
2X8 ROOF
RAFTER BEYOND
2X8 CONTINUOUS LEDGER BOARD. ANCHOR
TO EXISTING WALL WITH 2- 1/2" ANCHOR
ROD @ 1'-0" OC WITH WASHER AT NUT.
ENSURE 4 1/2" EMBED INTO MASONRY CELL.
INJECT HILTI HIT-HY 270 ADHESIVE SYSTEM
OR APPROVED EQUAL INTO MASONRY.
STAGGER BOLTS
EXISTING WALL
4" G
A G
E M
IN
FELT PAPER BETWEEN LEDGER AND CMU
JOIST BEARING
SEE PLAN
NOTE:
1. AT CONTRACTORS OPTION, CONTRACTOR MAY STOP COLUMN
1 1/2" SHORT AND SUPPORT BEAM ON A 1 1/2" GROUT BEDDING.
2. PROVIDE CROSS BRACING BETWEEN TRUSSES AS REQUIRED
TO TRANSFER SHEAR FROM ROOF DIAPHRAGM TO BEAM BELOW.
TOC
SEE PLAN
& NOTE 1
TOS
SEE PLAN
COL REINF, SEE
DETAIL 6/03-S301
W16, SEE PLAN
2" SQ x 1/4" THK
PL WASHER
(4) 3/4" F1554 GR 36
ANCHORS ON 5" GAGE
W/ 8" EMBEDMENT
5"
SIMPSON STRONG TIE HGA10
OR EQUAL WITH (4) 1/4 x 1 1/2 SDS TO TRUSS AND (4) 1/4 x 1 1/2
SDS TO SILL PLATE EACH SIDE
OF TRUSS
2X8 PLATE ANCHORED TO
BEAM WITH 2-1/2" DIA A307
BOLTS WITH WASHER AT NUT
ON WORKABLE GAGE, 2'-0" OC 3'
-3
1' -0
1'-4"SEE PLAN1'-4"
4 SIDES
GRATING, SEE
SPECIFICATIONS
S E
E P
LA
N
TOC
SEE PLAN
LAP ROUGHENED CJ W/
4" PVC WS 4 SIDES
REINF TO MATCH
SIZE AND SPACING
OF SLAB REINF
NOTE:
1. CONTRACTOR OPTION TO POUR BASE SLAB WITH SUMP PIT OR PROVIDE
CONSTRUCTION JOINT WITH 6" PVC WS ALL AROUND.
ASCALE
1 0 1 2
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-S
.r v t
-J u n -2
S302
MOUNT RUSHMORE NATIONAL MEMORIAL
272051
SOUTH BUILDING SECTIONSGS
SKM
06/13/23
TJH
18678703-
FINAL CONSTRUCTION DOCUMENTS
SCALE A
TYPICAL FRAMING CONNECTION AT WALL2
SCALE A
SECTION PARALLEL TO TRUSS1
SCALE A
SECTION8
SCALE A
TYPICAL STEEL BEG ON MASONRY DETAIL7
SCALE A
ROOF RAFTER AT NEW MASONRY WALL3
SCALE A
RAFTER SILL PLATE AT NEW MASONRY WALL4
SCALE A
ROOF JOIST AT EXISTING MASONRY WALL5
SCALE AS103
LEDGER BOARD AT EXISTING MASONRY WALL6
SCALE A
SECTION AT BEAM BEARING9
JOIST BEARING
SEE PLAN
SCALE A
SECTION AT SUMP PIT10
W16 BEAM
VENEER ANCHOR
SYSTEM
CMU SOAPS EA
SIDE OF BEAM
PL 1/4”x7”xCONT
TOP & BOTTOM
3/16
3/16
1/4” PLATE STIFFENER
EACH SIDE, EACH END
PL 1”x7”x7” W/ 2-1/2”x8” STUDS
1” NON-SHRINK
GROUT
GROUT ONE CELL
SOLID, FULL HEIGHT
OF OPENING
MIN
8"
LIMIT OF CMU
REMOVAL,
SEE ARCH
3/16
NOTE:
1. PROVIDE MORTAR BETWEEN LINTEL AND CMU AS REQUIRED FOR FULL CONTACT BETWEEN
LINTEL AND CMU.
2. GALVANIZE ALL STEEL ITEMS IN THIS DETAIL.
3. OPENINGS SHALL NOT BE CUT THROUGH MASONRY CONTROL JOINTS OR REINFORCING.
CONTRACTOR TO VERIFY PLACEMENT OF REINFORCING PRIOR TO CUTTING.
TOS
SEE PLAN TOC
SEE PLAN
EXISTING
CONCRETE WALL
(NOTE 1)
2'-0"
TOC EXIST
FIELD VERIFY
PRECAST LINTEL
2- CAST IN
THREADED INSERTS
2-5/8” A325 BOLTS
ON A 5” GAGE
W8x31
2-5/8” ADHESIVE
ANCHOR BOLTS ON A 5”
GAGE W/ 8” EMBEDMENT
NOTE:
1. FIELD VERIFY WITH OPENING OF EXISTING LOUVER.
1/2" COMPRESSIBLE
FILLER & SEALENT
1/2" PL STIFFNER
EA SIDE OF BEAM
1'-0"
2' -0
TOC
SEE PLAN
EXISTING CONCRETE WALL
2"
2"
2" 5"
5" 5"
5" 2"
6"
2- CAST IN
THREADED INSERTS3/4” PLATE
1/4
1/4
1/4
PRECAST LINTEL
1/2" COMPRESSIBLE FILLER
& SEALENT
TYP
2-3/4" THK PLATES
NOTES:
1. LOCATE REINF IN EXIST WALL PRIOR TO
DRILLING. DO NOT DAMAGE EXIST WALL REINF.
2 1/2" 2 1/2"
4" 4"
6"
2' -0
1'-0"
3-#7 T&B W/ 90 DEG
HK EE
#4@12 STIRRUPS
PRECAST LINTEL
EDGE OF
EXISTING WALL
2-5/8” A325 BOLTS W/ 11/16"
DIA HOLES IN TOP PLATE
5-3/4” ADHESIVE ANCHOR
BOLTS W/ 8” EMBED.
PROVIDE 13/16" DIA HOLES
IN PLATE
TOC
SEE PLAN
6"
2x4
2x6, TYP
2x6 BOTTOM
PLATE
2x6
6x6
2x6, TYP
HEADER,
SEE PLAN
2x6 TOP
PLATE
ROOF RAFTER,
SEE PLAN
6x6 2x6, TYP
FASTEN 2x6 STUDS
TOGETHER PER CHAPTER
23 OF THE IBC CODE
TYPICAL HEADER
CONNECTION PER 6/02-S301
3-1/4" DIA x 3 1/4" CONCRETE
SCREW ANCHOR FROM
STUD TO CONCRETE
EXISTING
MASONRY
1/2" DIA ANCHOR ROD AT 2'-0" OC.
ENSURE 4 1/2" EMBED INTO
MASONRY CELL. INJECT HILTI HIT-
HY 270 ADHESIVE SYSTEM OR
APPROVED EQUAL INTO MASONRY
SIMPSON STRONG TIE RPBZ
OR APPROVED EQUAL
2-3/8" DIA x 6" ADHESIVE
ANCHOR BOLT
EXISTING
CONCRETE
WALL BELOW
MASONRY,
SEE PLAN
2x4 2x6, TYP
2x6, TYP
6x6
SIDING AND
TRIM, SEE ARCH
9 1/2" 5 1/2" 1'-0 1/2"
HEADER ABOVE,
SEE PLAN
8 1/2"
SIMPSON STRONG TIE AE116 OR
EQUAL @ 2'-0" OC WITH 3- 1/2"
DIA ADHESIVE ANCHOR BOLT
INTO CMU AND 7-16d x 2 1/2"
NAIL INTO STUD
JOIST BEARING
SEE PLAN
(3)-2X8 CONTINUOUS LEDGER BOARDS.
2X8 TO BE FASTENED TOGETHER PER
CHAPTER 23 OF THE IBC. ANCHOR TO
MASONRY WALL WITH (2)-1/2" ANCHOR
ROD @ 1'-0" OC WITH WASHER AT NUT.
ENSURE 4 1/2" EMBED INTO MASONRY
CELL. INJECT HILTI HIT-HY 270 ADHESIVE
SYSTEM OR APPROVED EQUAL INTO
MASONRY. STAGGER BOLTS
SIMPSON STRONG TIE HGA10 OR
EQUAL W/ (4)-1/4 x 1 1/2" SDS TO TRUSS AND (4)-1/4 x 3" SDS TO
LEDGER BOARD EACH SIDE OF TRUSS
ROOF TRUSS BEYOND
4" G
A G
E M
IN
BSCALE
ASCALE
2 0 2 4
SCALE OF FEET
1 0 1 2
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-S
.r v t
-J u n -2
S303
MOUNT RUSHMORE NATIONAL MEMORIAL
272051
SOUTH BUILDING SECTIONSGS
SKM
06/13/23
TJH
18678703-
FINAL CONSTRUCTION DOCUMENTS
SCALE A
STEEL LINTEL DETAIL1
SCALE A
PRECAST LINTEL DETAIL4
SCALE A
PRECAST LINTEL DETAIL2
SCALE A
PRECAST LINTEL3
SCALE B
EL…