This solicitation is for wastewater treatment plant upgrades at Mount Rushmore National Memorial in South Dakota. The National Park Service is seeking design and construction services to rehabilitate and expand the existing wastewater treatment plant. Key work includes replacing solids dewatering equipment, upgrading aeration basins and clarifiers, installing new instrumentation and controls, and replacing aging infrastructure. The total project cost is estimated at $9-12 million. The solicitation was issued on June 13, 2023 with proposals due by July 15 and award planned for late 2023. The contract will be a firm-fixed-price design-build contract. The solicitation encourages proposals from small businesses and SDVOSBs.
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OLD
BALDY
MOUNTAIN
TO 385
MOUNT RUSHMORE
SCULPTURES
VISITOR AREA
LEGEND
AMPHITHEATER
WATER RESERVOIR
CONCESSION
BUILDING
ENERGY
CENTER
DORMITORY
INTERPRETIVE
CENTER
MAINTENANCE BUILDING
SCULPTOR'S STUDIO
& RESIDENCE
WASTE WATER
TREATMENT PLANT
WATER PUMPING
& STORAGE AREA
SWITCHBACK
(INACTIVE)
HOUSING
AREA
TO 36
16A
KEYSTONE
TO 16
TO
HAYWARD
THIS PROJECT
MOUNT RUSHMORE NATIONAL MEMORIAL
SCALE OF FEET
400' 0' 800'
100 0 100 200
400'
SCALE OF METERS
WASTEWATER TREATMENT PLANT EXPANSION
MAP LEGEND
PARK BOUNDARY
PAVED ROAD
UNPAVED ROAD
TRAIL
VISITOR CENTER
PARK HEADQUARTERS
PARKING
RESTROOMS
HQ.
V.C.
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
C R e v it L o c a l\ -0
S e ri e s
G e n e ra l_ R ic W e b e r.
rv t
/1
/2
:0 :1
A
M
VOL4
MOUNT RUSHMORE NATIONAL MONUMENT
272051
COVER SHEET VOLUME 4RDW
CLZ / TWM / HHD
06/13/23
RDW
18678704-
FINAL CONSTRUCTION DOCUMENTS
SCHEDULE OF DRAWINGS VOLUME 4
SHEET SUB-SHEET SHEET NAME
177 04-VOL4 COVER SHEET VOLUME 4
178 04-X101 WEST AERATION BASIN (1A/2A) PROCESS DEMOLITION PLANS
179 04-X102 WEST AERATION BASIN (1A/2A) ELECTRICAL DEMOLITION PLAN
180 04-S101 WEST AERATION BASIN (1A/2A) PLAN
181 04-D101 WEST AERATION BASIN (1A/2A) PROCESS PLAN
182 04-E101 WEST AERATION BASIN (1A/2A) POWER AND LIGHTING PLANS
183 05-S101 EAST AERATION BASIN (1B/2B) FOUNDATION PLAN
184 05-S102 EAST AERATION BASIN (1B/2B) UPPER LEVEL FLOOR PLAN
185 05-S301 EAST AERATION BASIN (1B/2B) SECTIONS
186 05-D101 EAST AERATION BASIN (1B/2B) PROCESS PLAN & SECTION
187 05-E101 EAST AERATION BASIN (1B/2B) POWER AND LIGHTING PLAN
188 06-X101 WEST CLARIFIER (#1) ELECTRICAL DEMOLITION PLAN
189 06-D101 WEST CLARIFIER (#1) DEMOLITION & PROCESS PLAN
190 06-E101 WEST CLARIFIER (#1) POWER AND LIGHTING PLAN
191 07-S101 EAST CLARIFIER (#2) FOUNDATION PLAN
192 07-S102 EAST CLARIFIER (#2) UPPER LEVEL FLOOR PLAN
193 07-S301 EAST CLARIFIER (#2) SECTIONS
194 07-D101 EAST CLARIFIER (#2) PROCESS PLAN & SECTIONS
195 07-E101 EAST CLARIFIER (#2) POWER AND LIGHTING PLAN
196 08-X101 WINTER BIOSOLIDS STORAGE DEMOLITION PLAN
197 08-X102 WINTER BIOSOLIDS STORAGE ELECTRICAL PLAN - DEMO
198 08-D101 WINTER BIOSOLIDS STORAGE PROCESS PLAN & SECTIONS
199 08-D501 WINTER BIOSOLIDS STORAGE BUILDING TANK DETAILS
200 08-M101 WINTER BIOSOLIDS STORAGE MECHANICAL PLANS
201 08-E101 WINTER BIOSOLIDS STORAGE POWER AND LIGHTING PLANS
202 08-E102 WINTER BIOSOLIDS LIGHTNING PROTECTION / GROUNDING PLAN
203 08-E601 WINTER BIOSOLIDS ONE-LINE & SCHEDULE
204 08-E602 WINTER BIOSOLIDS MOTOR CONTROL DIAGRAMS
205 09-G001 INSTRUMENTATION P&ID -INSTRUMENTATION LEGEND
206 09-G002 INSTRUMENTATION P&ID -INSTRUMENTATION LEGEND
207 09-Y501 INSTRUMENTATION INSTRUMENT INSTALLATION DETAILS
208 09-Y502 INSTREMENTATION INSTRUMENT INSTALLATION DETAILS
209 09-Y601 INSTRUMENTATION P&ID HEADWORKS
210 09-Y602 INSTRUMENTATION P&ID INFLUENT EQ BASIN & AERATED SLUDGE HOLDING TANK
211 09-Y603 INSTRUMENTATION P&ID - EQUALIZATION BASIN
212 09-Y604 INSTRUMENTATION P&ID - AERATION BASIN 1A / 2A
213 09-Y605 INSTRUMENTATION P&ID - AERATION BASIN 1B / 2B
214 09-Y606 INSTRUMENTATION P&ID - AERATION BLOWERS
215 09-Y607 INSTRUMENTATION P&ID - ARP PUMPS
216 09-Y608 INSTRUMENTATION P&ID - CLARIFIER 1
217 09-Y609 INSTRUMENTATION P&ID - CLARIFIER 2
218 09-Y610 INSTRUMENTATION P&ID - RWAS PUMPS
219 09-Y611 INSTRUMENTATION P&ID - SCUM PIT
220 09-Y612 INSTRUMENTATION P&ID - SAND FILTERS AND REAERATION COLUMN
221 09-Y613 INSTRUMENTATION P&ID - UV TREATMENT AND OUTFALL
222 09-Y614 INSTRUMENTATION P&ID - MICRO-C SYSTEM SHEET 1 OF 2
223 09-Y615 INSTRUMENTATION P&ID - MICRO-C SYSTEM SHEET 2 OF 2
224 09-Y616 INSTRUMENTATION P&ID - CENTRIFUGE FEED PUMPS
225 09-Y617 INSTRUMENTATION P&ID - DEWATERING CENTRIFUGES
226 09-Y618 INSTRUMENTATION P&ID - DEWATERING POLYMER SYSTEM
227 09-Y619 INSTRUMENTATION P&ID - TRUCK LOADOUT
228 09-Y620 INSTRUMENTATION P&ID - FERRIC CHLORIDE SYSTEM
229 09-Y621 INSTRUMENTATION P&ID - SODIUM HYDROXIDE SYSTEM
230 09-Y622 INSTRUMENTATION P&ID - NORTH BUILDING SUMP
231 09-Y623 INSTRUMENTATION P&ID - WINTER SOLIDS BUILDING
232 09-Y624 INSTRUMENTATION P&ID - NORTH BUILDING ALARM SIGNALING SYSTEM
233 09-Y625 INSTRUMENTATION P&ID - SOUTH BUILDING ALARM SIGNALING SYSTEM
234 09-Y626 INSTRUMENTATION P&ID - WINTER SOLIDS BUILDING ALARM SIGNALING SYSTEM
235 09-Y701 INSTRUMENTATION PROCESS CONTROL SYSTEM COMMUNICATIONS DIAGRAM
VOLUME 4
X01
X01
X01
X02
X02
X02
X02 X02
X02
X02
X02
X03
X03
X03 X03
X03
X03 X04
X04 X04
X03 X03
X03 X03
X03 X03
X05 X05
X06
X06
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
M
O R
U W a s te w a te r R e h a b a n d E x p a n s io n
/1
-0
-D
.r v t
/9
/2
:3
:1
P
M
X101
MOUNT RUSHMORE NATIONAL MEMORIAL
272051
WEST AERATION BASIN
(1A/2A) PROCESS
DEMOLITION PLANS
CLR
DJG
06/13/23
KSP
18678704-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
WEST AERATION BASIN (A1/2A) PROCESS DEMOLITION LOWER PLAN
ASCALE
WEST AERATION BASIN (1A/2A) PROCESS DEMOLITION GRADE PLAN
NOTES:
1. COORDINATE DEMOLITION WITH THE OWNER. THE
TREATMENT SYSTEM SHALL REMAIN IN SERVICE AT
ALL TIMES. REFER TO SECTION 01 31 00 FOR
ADDITIONAL REQUIREMENTS.
2. REMOVE ALL SUPPORTS AND ANCHOR BOLTS.
PATCH THE STRUCTURE AS SPECIFIED IN SECTION
01 73 29.
3. SEE SPECIFICATION SECTION 01 27 00 FOR
DESCRIPTION OF BID OPTIONS.
KEYNOTES
X01 EXCAVATE AND REMOVED BURIED PIPING AND
FITTINGS AND PREPARE REMAINING PIPING FOR NEW
CONNECTION.
X02 REMOVE EXISTING AERATION DIFFUSERS AND
SUBMERGED AERATION PIPING. PREPARE REMAINING
AIR DISTRIBUTION PIPING FOR CONNECTION TO NEW
DIFFUSER SYSTEM.
X03 REMOVE EXISTING MIXERS. PATCH AND PREPARE
AERATION BASIN TO RECIEVE NEW MIXERS.
X04 REMOVE EXISTING WASTEWATER INFLUENT PIPING.
PATCH CONCRETE WALL PENENTRATIONS AND
ANCHOR BOLT LOCATIONS.
X05 RETAIN EXISTING PNEUMATIC AIR FLOW CONTROL
VALVES FOR CONNECTION TO NEW DIFFUSER PIPING.
X06 BID OPTION #2, REHABILITATE DOME COVER AS
SPECIFIED IN SECTION 09 01 91 - REFINISHING
FIBERGLASS DOMES. THE BASE BID EXCLUDES DOME
REHABILITATION WORK.
IC
ICIC
IC
IC IC
IC
ICIC IC IC
IC
IC IC
ICIC
IC IC
IC
IC
IC
IC
IC
IC
J
EXISTING
INSTRUMENT
CABINET
E3 E3
E3
E3
E3
E3
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-E
.r v t
/9
/2
:0
:0
A M
X102
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
WEST AERATION BASIN
(1A/2A) ELECTRICAL
DEMOLITION PLAN
GB
KLG
06/13/23
MTJ
18678704-
100% DRAFT CONSTRUCTION DOCUMENTS
ASCALE
WEST AERATION BASIN (1A/2A) DEMOLITION PLAN
KEYNOTES - DEMOLITION
# DESCRIPTION
E3
1' -0
4'
-9
1'-0" 8" 8" 1'-0"
(F.V.)
5'-6"
(F.V.)
5'-6"
04-S101
2-#5 DIAG EF
#5@ 8 EW EF
EXISTING
WALL
1' -4
#6X18"@ 12 OC
DWL W/ 6" MIN
EMBED INTO
EXISTING WALL
EXISTING
SLAB
SEE PLAN SEE PLAN
OPENING
TYP
ASCALE
1 0 1 2
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-S
.r v t
-J u n -2
S101
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
WEST AERATION BASIN
(1A/2A) PLAN
GS
SKM
06/13/23
TJH
18678704-
FINAL CONSTRUCTION DOCUMENTS
SCALE A
WEST AERATION BASIN (1A/2A) PLAN1
SCALE A
WALL ELEVATION2
06/13/23
6"-RC
6"-CLI
6"-CLI
6"-CLI
6"-RC
4"-RC/RAS
4"-RC/RAS
SEE 01-C106 FOR
CONTINUATION SEE 01-C106 FOR
CONTINUATION
SEE 01-C106 FOR
CONTINUATION
SEE 01-C106 FOR
CONTINUATION
4"-ABI 4"-ABI
PLUG VALVE (TYP)(NC)(NC)
SEE 05-D101 FOR
CONTINUATION
1AX1a
1AX1b
2AX1a
2AX1b
1OX1a 2OX1a
1OX1b 2OX1b
ANOXIC 1
ANOXIC 1
ANOXIC 1
ANOXIC 1
OXIC 1 OXIC 1
OXIC 1 OXIC 1
AERATION BASIN NO. 1A AERATION BASIN NO. 2A
8"-ABI
8"-ABI
SUMERSIBLE
MIXER (TYP)
SEE 05-D101 FOR
CONTINUATION
6"-CLI
04-ABMX-1A1
04-ABMX-1A3
04-ABMX-1A2 04-ABMX-2A2
04-ABMX-2A3
04-ABMX-2A1
6"-RC
4"-LPA
3"-LPA3"-LPA
D01 D01
D03
D02D02
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
M
O R
U W a s te w a te r R e h a b a n d E x p a n s io n
/1
-0
-D
.r v t
/9
/2
:3
:1
P
M
D101
MOUNT RUSHMORE NATIONAL MEMORIAL
272051
WEST AERATION BASIN
(1A/2A) PROCESS PLAN
CLR
DJG
06/13/23
KSP
18678704-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
WEST AERATION BASIN (1A/2A) PROCESS PLAN
KEYNOTES - PROCESS
# DESCRIPTION
D01 SEE SHEET 00D-002 FOR PROCESS AIR SCHEMATIC AND VALVE
REQUIREMENTS.
D02 PROVIDE PNEUMATIC CONTROL VALVES AS SHOWN ON THE
PROCESS AIR SCHMEATIC (NOT INCLUDED IN PROCESS PLAN
VIEW).
D03 BID OPTION #2, REHABILITATE DOME COVER AS SPECIFIED IN
SECTION 09 01 91 - REFINISHING FIBERGLASS DOMES. THE BASE
BID EXCLUDES DOME REHABILITATION WORK.
NOTES:
1. SEE SPECIFICATION SECTION 01 27 00 FOR DESCRIPTION OF
BID OPTIONS.
IC
IC IC
IC
ICIC IC IC
IC
IC IC
ICIC
IC IC
IC
IC
IC
IC
IC
IC
J
S
RECONNECT
TO EXISTING
CIRCUIT (TYP)
LSHH-134
AV-146C
AIT-147
AE-147A
AIT-146
AE-146B
AIT-137
AIT-136
AE-136B
AE-137A
AV-136C
AIT-138
AIT-148
AE-138A AE-148B
AE-148A
AE-138B
AV-146A
AV-146BAV-136B
AV-136A
AE-146AAE-136A
EXISTING NEMA 4X
INSTRUMENT CABINET
04-ABMX-1A2 04-ABMX-2A2
04-ABMX-2A304-ABMX-1A3
04-ABMX-1A1 04-ABMX-2A1
00-E502 DISCONNECTS FOR
MIXERS, MOUNT ON
RACK TYP OF 10
LSHH-144
E04
S2 S2
S2 S2
E01
E02 E02
E02E02
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-E
.r v t
/9
/2
:0
:0
A M
E101
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
WEST AERATION BASIN
(1A/2A) POWER AND
LIGHTING PLANS
GB
KLG
06/13/23
MTJ
18678704-
100% DRAFT CONSTRUCTION DOCUMENTS
ASCALE
WEST AERATION BASIN (1A/2A) POWER PLAN
ASCALE
WEST AERATION BASIN (1A/2A) LIGHTING PLAN
KEYNOTES - ELECTRICAL
# DESCRIPTION
E01 VERIFY LIGHTING CONTROL SWITCHES AT EACH ENTRANCE TO THE
AERATION BASION ARE IN GOOD CONDITION AND REPLACE SWITCHES
IF REQUIRED. CIRCUIT LIGHTING TO EXISTING SWITCHES.
E02 REPLACE EXISTING LUMINAIRE WITH STANCHION MOUNT. PROVIDE 1
1/2" CONDUIT FOR SUPPORT.
E04 EXISTING NEMA 4X PULL BOX.
GENERAL NOTES
1. SEE AREA CLASSIFICATION AND ELECTRICAL EQUIPMENT INSTALLATION
SCHEDULE ON SHEET 00-E607.
1'-0"1'-6" 5'-6" 1'-0" 5'-6" 1'-0" 5'-6" 1'-0" 5'-6" 1'-6"1'-0"
-0
7'
-0
1' -0
1'
-6
8' -0
1'
-0
9' -9
1'
-0
'-0
1'
-6
1' -0
1'-6" CONCRETE BASE
SEE SHEET NOTE 1
TOC EL 4975.003'
-6
1'-0"
1'-0"
1'-6"
1'-6"
1'-0"
1'-0"
1'-0"
1'-0"
1' -6
1' -0
1' -0
1'
-0
1' -0
1' -0
1' -0
1' -6
1' -0
1' -0
05-S301
05-S301
05-S301
05-S301
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-S
.r v t
-J u n -2
S101
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
EAST AERATION BASIN
(1B/2B) FOUNDATION PLAN
GS
SKM
06/13/23
TJH
18678705-
FINAL CONSTRUCTION DOCUMENTSASCALE
AERATION BASIN FOUNDATION PLAN
GENERAL NOTES:
1. SEE SHEET 00-S001 FOR GENERAL STRUCTURAL NOTES.
2. FOR TYPICAL STRUCTURAL DETAILS, SEE SHEETS 00-S
SERIES SHEETS.
3. COORDINATE ALL WALL AND SLAB PENETRATIONS WITH
ELECTRICAL AND PROCESS DRAWINGS.
SHEET NOTES:
1. 1'-6" CONCRETE BASE SLAB WITH #8@9 EW T&B W/ 90 DEG HK
EE. NORTH/SOUTH BARS ARE INNER BARS. OVER A 2'-0"
THICK FREE DRAINING GRANULAR BEDDING.
7' -0
5'
-0
9' -9
4'
-0
5' -0
6"
1' -0
12'-4" 3'-4" 12'-4"
1'-0" 6"
10'-6" 4"
3'-4" 4"
10'-6" 6"
1'-0"
PRE-FABRICATED
DOME BY DOME
MANUFACTURER
1'-0" CONCRETE SLAB
SEE SHEET NOTE 2
TOC EL 4993.00
1' -0
6"
05-S301
1'-0" 8" 8" 1'-0"
8" 1'-0" 1'-0" 8"
1'-0" 8" 8" 1'-0"
WALL OPENING BELOW,
TYP
TOC
EL 4993.00
TOC
EL 4993.00
GUARDRAIL,
SEE NOTE 3
TOW
EL 4995.00
05-S301
05-S301
05-S301
SIM
05-S301
05-S301
SIM
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-S
.r v t
-J u n -2
S102
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
EAST AERATION BASIN
(1B/2B) UPPER LEVEL
FLOOR PLAN
GS
SKM
06/13/23
TJH
18678705-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
AERATION BASIN UPPER LEVEL FLOOR PLAN
GENERAL NOTES:
1. SEE SHEET 00-S001 FOR GENERAL STRUCTURAL NOTES.
2. FOR TYPICAL STRUCTURAL DETAILS, SEE SHEETS 00-S
SERIES SHEETS.
SHEET NOTES:
1. PRE-FABRICATED DOME ON AERATION BASIN TO BE
ATTACHED TO AERATION BASIN BY DOME MANUFACTURER.
2. 1'-0" CONCRETE SLAB WITH #5@12 EW T&B. NORTH/SOUTH
BARS ARE INNER BARS.
3. SEE SPECIFICATION 05 52 46 FOR GUARDRAIL REQUIREMENTS.
KEYNOTES:
1 REMOVABLE RAILING SECTION
SEE PLANSEE PLAN
GRADE
SEE CIVIL
SEE PLAN
#5@8 EW EF
#7@8 EW EF
3" C
LR
#7@8 DOWELS EF
SLAB REINFORCING,
SEE PLAN
SEE PLAN
ROUGHENED CJ
W/ 6" PVC WS
(MIN)
2'-0"
FREE DRAINING
GRANULAR MATERIAL,
SEE SHEET NOTE 1,
SHEET 05-S101
FIBERGLASS DOME,
ATTACHMENT TO CONCRETE
BY DOME MANUFACTURER
LAP
LAP
LAP
TOC WALL
EL = SEE PLAN
MAIN LEVEL
EL = SEE PLAN
TOC SLAB
EL = SEE PLAN
4'-0"
S E
E P
LA
N
EQ EQ
REINFORCING,
SEE PLAN
NOTE 1
SEE PLAN
#6@8 EW EF
NOTES:
1. TOP SLAB NOT PRESENT AT SIM CONDITION.
3" C
LR
FREE DRAINING
GRANULAR MATERIAL,
SEE SHEET NOTE 1,
SHEET 05-S101
#6@8 DOWELS EF
SLAB REINFORCING,
SEE PLAN
LAP
LAP
TOC SLAB
EL = SEE PLAN
MAIN LEVEL
EL = SEE PLAN
GUARDRAIL, SEE
SPECIFICATION 05 52 46
#5@8 EW EFSEE PLAN
GRADE
SEE CIVIL
#7@8 EW EF
SEE PLAN
SLAB REINFORCING,
SEE PLAN
6" PVC WS
3" C
LR
#7@8 DOWELS EF
SEE PLAN
(MIN)
2'-0"
FREE DRAINING
GRANULAR MATERIAL,
SEE SHEET NOTE 1,
SHEET 05-S101
S E
E P
LA
N
FIBERGLASS DOME,
ATTACHMENT TO CONCRETE
BY DOME MANUFACTURER
LAP
LAP
#5@12 W/STD
HK AT END
LAP
LAP
TOC WALL
EL = SEE PLAN
MAIN LEVEL
EL = SEE PLAN
TOC SLAB
EL = SEE PLAN
8"
SEE PLANSEE PLANSEE PLANSEE PLANSEE PLAN
S E
E P
LA
N
8"
4-#8 EW
FREE DRAINING GRANULAR
MATERIAL, SEE SHEET NOTE 1,
SHEET 05-S101
REINF TO MATCH
SLAB REINF IN SIZE
& SPACING
LAPREINFORCING,
SEE PLAN
#6@8 DOWELS
#6@8 EW EF
1' -4
REINFORCING,
SEE PLAN
S E
E P
LA
N
SEE PLAN
PLAN
SEE
#5@8 EW EF
#6@8 EW EF
#7@8 EW EF
2-#5 DIAG EF
SEE PLANSEE PLAN
#5@12 W/STD HK AT END
LAP BSCALE
ASCALE
1 0 1 2
SCALE OF FEET
2 0 2 4
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-S
.r v t
-J u n -2
S301
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
EAST AERATION BASIN
(1B/2B) SECTIONS
GS
SKM
06/13/23
TJH
18678705-
FINAL CONSTRUCTION DOCUMENTS
SCALE A
WALL SECTION1
SCALE A
WALL SECTION2
SCALE A
WALL SECTION3
SCALE B
SECTION4
SCALE B
SECTION5
SEE 01-C106 FOR
CONTINUATION
SEE 07-D101 FOR
CONTINUATION
SEE 01-C106 FOR
CONTINUATION
SEE 01-C106 FOR
CONTINUATION
6"-RC
6"-CLI
6"-CLI
6"-CLI
6"-RC
4"-RC/RAS
4"-RC/RAS
4"-ABI
D101
PLUG VALVE (TYP)
1'-0"
1'-0"
1'-0" 1'-0"
8"
1OX1c
OXIC 1
AERATION BASIN NO. 1B AERATION BASIN NO. 2B
1OX1d
OXIC 1
1OX1e
OXIC 1
1AX2
ANOXIC 1
1OX2
OXIC 2
2OX1c
OXIC 1
2OX1d
OXIC 1
2OX1e
OXIC 1
2AX2
ANOXIC 1
2OX2
OXIC 2
8"-ABI
8"-ABI
SEE 04-D101 FOR
CONTINUATION
SEE 04-D101 FOR
CONTINUATION
05-ABMX-2B1
05-ABMX-2B5
05-ABMX-2B4
05-ABMX-2B2
05-ABMX-2B305-ABMX-1B3
05-ABMX-1B205-ABMX-1B4
05-ABMX-1B5
05-ABMX-1B1
SUMERSIBLE
MIXER (TYP)
4"-LPA
D01
TOC SLAB
4975.00
TOC WALL
4995.00
6"-CLI
6"-RC
CL 4985.50
8"-ABI
CL 4991.35
4"-ABI
CL 4987.50
4"-RC/RAS
CL 4985.50
4"-RC/RAS
CL 4985.50
PLUG VALVE (TYP)
8"-ABI
CL 4986.25
3"-LPA 3"-LPA
4"-LPA
3"-LPA
CL 4987.50
6"-CLI
CL 4986.92
6"-CLI
6"-CLI
CL 4986.50
CL 4985.39
EL 4988.17(AT TEE)
(AT TEE)
(AT BEND)
D02
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
M
O R
U W a s te w a te r R e h a b a n d E x p a n s io n
/1
-0
-D
.r v t
/9
/2
:3
:2
P
M
D101
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
EAST AERATION BASIN
(1B/2B) PROCESS PLAN &
SECTION
CLR
DJG
06/13/23
KSP
18678705-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
PROPOSED AERATION BASIN PROCESS PLAN
SCALE AD101
SECTION2
KEYNOTES - PROCESS
# DESCRIPTION
D01 SEE SHEET 00-D002 FOR PROCESS AIR SCHEMATIC AND
VALVING REQUIREMENTS.
D02 NEW DOME COVER AS SPECIFIED IN SECTION 46 13 01 -
FIBERGLASS COVERS - DOME TYPE.
IC
IC IC
IC
ICIC IC IC
IC
IC IC
ICIC
IC IC
IC
IC
IC
IC
IC
IC
S
AIT-236
AIT-238 AIT-248
AIT-246
AIT-247
AIT-237
LSHH-234 LSHH-244
AE-237A
AE-236B
AV-236C
AV-246C
AE-247A
AE-246B
AV-246B
AV-246A
AE-248B
AE-248AAE-238A
AV-236A
AV-236B
AE-236A AE-246A
AE-238B
MOUNT MIXER
DECONTACTOR TO
GUARDRAIL,
DETAIL
4/00E502 (TYP)
05-ABMX-1B3
05-ABMX-1B4
05-ABMX-1B2 05-ABMX-2B2
05-ABMX-2B4
05-ABMX-1B5
05-ABMX-1B1 05-ABMX-2B1
05-ABMX-2B5
05-ABMX-2B3
INSTRUMENT CABINET
MOUNT ON RACK
DISCONNECTS FOR
MIXERS, MOUNT ON
TYP OF 10
00-E502
S2 S2
S2 S2
E01 E01
E01 E01
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-E
.r v t
/9
/2
:1
:5
A M
E101
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
EAST AERATION BASIN
(1B/2B) POWER AND
LIGHTING PLAN
GB
KLG
06/13/23
MTJ
18678705-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
EAST AERATION BASIN (1B/2B) BASIN POWER PLAN
ASCALE
EAST AERATION BASIN (1B/2B) BASIN LIGHTING PLAN
KEYNOTES - ELECTRICAL
# DESCRIPTION
E01 PROVIDE 1 1/2" CONDUIT FOR SUPPORT OF STANCHION MOUNT
LUMINAIRE.
GENERAL NOTES
1. SEE AREA CLASSIFICATION AND ELECTRICAL EQUIPMENT INSTALLATION
SCHEDULE ON SHEET 00-E607.
187 235
J
IC IC
IC
IC
IC
IC
X01
X02
X03
LSHL-310
LSHH-310
LSHL-194
LSHH-194
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-E
.r v t
/9
/2
:5
:5
A
M
X101
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
WEST CLARIFIER (#1)
ELECTRICAL DEMOLITION
PLAN
GB
KLG
06/13/23
MTJ
18678706-
FINAL CONSTRUCTION DOCUMENTS
1/4" = 1'-0"
WEST CLARIFIER (#1) DEMOLITION PLAN
KEYNOTES - DEMOLITION
# DESCRIPTION
X01 REMOVE CONTROL PANEL, CABLE AND
CONDUIT TO REMAIN AND BE
RECONNECTED.
X02 REMOVE ELECTRICAL CONNECTION TO
MECHAINSM.
X03 REMOVE INSTRUMENTS, CABLE TO
REMAIN AND BE RECONNECTED.
6"-CLI
4"-CLI
6"-SCM
6"-FTI
4"-RAS/WAS
SEE 01-C106 FOR
CONTINUATION
SEE 01-C106 FOR
CONTINUATION
SEE 01-C106 FOR
CONTINUATION
06-CLAR-1
D01
D01
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
M
O R
U W a s te w a te r R e h a b a n d E x p a n s io n
/1
-0
-D
.r v t
/9
/2
:3
:5
P
M
D101
MOUNT RUSHMORE NATIONAL MEMORIAL
272051
WEST CLARIFIER (#1)
DEMOLITION & PROCESS
PLAN
CLR
DJG
06/13/23
KSP
18678706-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
EXISTING FINAL CLARIFIER PROCESS PLAN
ASCALE
EXISTING FINAL CLARIFIER DEMOLITION PLAN
KEYNOTES - PROCESS
# DESCRIPTION
D01 BID OPTION #2, REHABILITATE DOME COVER AS SPECIFIED IN
SECTION 09 01 91 - REFINISHING FIBERGLASS DOMES. THE BASE
BID EXCLUDES DOME REHABILITATION WORK.
NOTES:
1. SEE SPECIFICATION SECTION 01 27 00 FOR DESCRIPTION OF
BID OPTIONS.
IC IC
IC
IC
IC
IC
J
S
E01
E02
E03
06-CLAR-1
LSHH-310
LSHL-310
LCP2-17NSHH-155
NSH-155
LE-155
LSHH-194
LSHL-194
LIT-155
E02
06-CLAR-1
S2 E04
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-E
.r v t
/9
/2
:0
:4
A M
E101
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
WEST CLARIFIER (#1)
POWER AND LIGHTING
PLAN
GB
KLG
06/13/23
MTJ
18678706-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
WEST CLARIFIER (#1) POWER PLAN
ASCALE
WEST CLARIFIER (#1) LIGHTING PLAN
GENERAL NOTES
1. SEE AREA CLASSIFICATION AND ELECTRICAL EQUIPMENT INSTALLATION
SCHEDULE ON SHEET 00-E607.
KEYNOTES - ELECTRICAL
# DESCRIPTION
E01 REPLACE EXISTING CONTROL PANEL,
RE-USE EXISTING CONDUITS. CP
06-CLAR-1.
E02 EXISTING 8X8 NEMA 4X.
E03 MOUNT TO GUARDRAIL.
E04 REPLACE EXISTING LUMINAIRE WITH
STANCHION MOUNT. PROVIDE 1 1/2"
CONDUIT FOR SUPPORT.
R
2' -2
R 10'-0
1'-2" THICK MAT SLAB WITH
#6 RADIAL BARS 14" OC
MAX TOP & BOTTOM
OUTER BARS
#6 @ 14 CIRCUMFERENTIAL
TOP & BOT INNER BARS, TYP
STAGGER 2X LAP SPLICE
LENGTH AS SHOWN IN
SCHEDULE. STAGGER LAPS
MIN 3'-0"
1'-0" 1'-2"
07-S301
07-S301
KCJ WITH WS IN WALL
AT THIRD POINTS
KCJ WITH WS
MAX
1'-2"
MAX
1'-2"
R 3'-8"
ASCALE
1 0 1 2
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-S
.r v t
-J u n -2
S101
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
EAST CLARIFIER (#2)
FOUNDATION PLAN
ARA
SKM
06/13/23
TJH
18678707-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
CLARIFIER FOUNDATION PLAN
GENERAL NOTES:
1. SEE SHEET 00-S001 FOR GENERAL STRUCTURAL NOTES.
2. FOR TYPICAL STRUCTURAL DETAILS, SEE SHEETS 00-S
SERIES SHEETS.
SHEET NOTES:
1. PROVIDE 6" PVC WATERSTOPS IN ALL CONSTRUCTION JOINTS
IN ALL SLABS, WALL TO SLAB JOINTS, AND WALL
CONSTRUCTION OR CONTROL JOINTS FOR ALL BELOW GRADE
EXTERIOR WALLS AND WATER CONTAINING STRUCTURES
UNLESS NOTED OTHERWISE.
2. COORDINATE AND VERIFY ALL DIMENSIONS AND LOCATIONS
OF SUPPORTS WITH ACTUAL CLARIFIER EQUIPMENT
FURNISHED.
3. PROVIDE 24" GRANULAR FILL BENEATH CLARIFIER SLAB.
R 11 '-2
1'-2" 1'-0" 6"
CONCRETE
STAIRS
TOC TOPPING
TOC TOPPING
07-S301
EFFLUENT
PIPING
TOCEL 4987.89
TOCEL 4988.59
TOC
4989.22
KCJ WITH WS IN WALL
AT THIRD POINTS
KCJ IN LAUNDER WALL
AND SLAB AT THIRD
POINTS
1'-1 7/8"
MECHANISM SUPPLIER TO
DESIGN AND FURNISH
SCUM BOX SUPPORT
FRAME PER SPEC 46 43 24.
HANDRAIL PER
SPEC 05 52 46.
WALKWAY PER
SPEC 46 43 24.
ASCALE
1 0 1 2
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-S
.r v t
-J u n -2
S102
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
EAST CLARIFIER (#2) UPPER
LEVEL FLOOR PLAN
ARA
SKM
06/13/23
TJH
18678707-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
CLARIFIER UPPER LEVEL FLOOR PLAN
GENERAL NOTES:
1. SEE SHEET 00-S001 FOR GENERAL STRUCTURAL NOTES.
2. FOR TYPICAL STRUCTURAL DETAILS, SEE SHEETS 00-S
SERIES SHEETS.
SHEET NOTES:
1. PROVIDE 6" PVC WATERSTOPS IN ALL CONSTRUCTION JOINTS
IN ALL SLABS, WALL TO SLAB JOINTS, AND WALL
CONSTRUCTION OR CONTROL JOINTS FOR ALL BELOW GRADE
EXTERIOR WALLS AND WATER CONTAINING STRUCTURES
UNLESS NOTED OTHERWISE.
2. FIBERGLASS DOME TO BE ANCHORED TO CLARIFIER WALL BY
DOME MANUFACTURER.
3. COORDINATE STRUCTURAL WITH ACTUAL CLARIFIER
EQUIPMENT SUPPLIED.
4. STAIR HEIGHT TO BE DETERMINED BY EQUIPMENT PROVIDED,
USE 7" RISERS, 11" TREAD.
5. SEE SPECIFICATION 05 52 46 FOR WALKWAY GUARDRAIL
REQUIREMENTS.
SEE PLAN
3" C
LR
SEE PLAN
2" CONCRETE
TOPPING
RADIAL BARS, SEE
PLAN
ROUGHENED CJ
W/ 6" PVC WS
LAP TYP
#6 @ 12 DOWELS EF
#6 @ 12 EW EF
CONCRETE
TOPPING VARIES,
SEE PLAN
ROUGHENED CJ
3-#5 EQ SPACED
TOP & BOT
#4 @ 12
3-#5 HORIZ STAGGER
LAPS MIN 6'-0"
#5 @ 12 TOP & BOT W/
MATCHING DOWEL AND
MECHANICAL SPLICE @
CONTRACTOR OPTION
GRADE,
SEE CIVIL
SEE PLAN
CONNECTION OF FIBERGLASS
DOME TO CLARIFIER WALL BY
DOME MANUFACTURER.
TOC
EL 4975.12
TOC
EL 4975.29
TOC
EL 4993.12
FIBERGLASS DOME
FRAME DOME AROUND WALKWAY
SUPPORT AND MECHANISM
ATTACHMENT AS REQUIRED
FREE DRAINING
GRANULAR MATERIAL,
SEE SHEET NOTE 3,
SHEET 07-S101
2'-0" (MIN)
SEE PLAN
ATTACHMENT OF CLARIFIER
MECHANISM TO EXTERIOR WALL
BY MECHANISM MANUFACTURER.
TOC
4987.72
TOC
SEE PLAN
2"
CIRCUMFERENTIAL
BARS, SEE PLAN
TOC FILL
(MIN)
2'-0" 3'-0" 1'-0" 3'-0"
1'-0"
1' -2
#5 @ 12 EW
FREE DRAINING
GRANULAR MATERIAL,
SEE SHEET NOTE 3,
SHEET 07-S101
#5 @ 12 EW T&B
NOTE:
COORDINATE ANGLE OF CENTRAL COLUMN OPENING WITH MECHANISM SUPPLIED.
4" RAS/WAS PIPE,
SEE PROCESS
-2
MECHANISM DRIVE
SHAFT SUPPORT
BRACKET AND
BEARING
7'-0" DIAMETER
#5 @ 12 EW T&B
TOC
EL 4972.12
TOC
4974.37
KCJ
4-#5 BARS
EACH WAY
CENTERED
AT OPENING
SLAB REINF
SEE PLAN
"90°
6"
1/ 2"
PROVIDE 7/16" WIDE X 1 1/2"
LONG SLOTS FOR WEIR
ELEVATION ADJUSTMENT.
DETAIL OF
WEIR PLATE
2" 3"
1/
2" 3"
7/8"
7/8"
1' -0
/2
1/
2"
1/ 2"
(PROJ.)
1 1/2"
ADJUST 132 - 5/8" X 10" HOOK ANCHOR
BOLTS WITH 1-H.N. & 1-C.W.
EA. (2-BOLTS PER SUPPT.)
45° CHAMFER FOR
MASTIC SEAL
5/8" X 1 3/4" CTS'K. FLAT HEAD
BOLTS WITH 1-H.N. & 1-C.W. EA.
3/4" X 2" M. BOLT WITH
1-H.N. & 2-C.W. EA.
SECTION AT WEIR
3"
DETAIL OF SCUM
BAFFLE JOINT
136 - 5/8"⌀ X 10" LG.
HOOK ANCHOR BOLTS
WITH 1-H.N. EA.
1/
2"
1/ 2"
SQ.
WASHER
1 3/4" PROJ.
BUTT PL.
5/ 8"
5/ 8"
1/
4" A
D
JU
S T
3"
V NOTCH WEIR
EL 4989.30
ASCALE
SCALE OF FEET
0 1 2 3
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-S
.r v t
-J u n -2
S301
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
EAST CLARIFIER (#2)
SECTIONS
ARA
SKM
06/13/23
TJH
18678707-
FINAL CONSTRUCTION DOCUMENTS
SCALE A
CLARIFIER WALL SECTION1
SCALE A
CENTRAL COLUMN SECTION2
SCALE A
SECTION3
SEE 05-D101 FOR
CONTINUATION
SEE 01-C106 FOR
CONTINUATION
SEE 01-C106 FOR
CONTINUATION
6"-CLI
4"-CLI
6"-SCM
4"-RAS/WAS
6"-FTI
D101
D101
07-CLAR-2
D101
TOC BOTTOM
4975.00
TOC CHANNEL
4987.50
MAIN LEVEL
4993.00
4"-RAS/WAS
CL 4972.37
6"-SCM
CL 4985.00
6"-FTI
CL 4988.04
07-CLAR-2
(AT WALL)
(AT WALL)
(AT WALL)
D01
TOC BOTTOM
4975.00
TOC CHANNEL
4987.50
MAIN LEVEL
4993.00
6"-CLI
CL 4985.50
4"-CLI
CL 4985.50 6"-SCM
CL 4985.00
07-CLAR-2
(AT WALL)
D01
TOC CHANNEL
4987.50
6"-SCM
CL 4985.00
(AT WALL)
BSCALE
ASCALE
2 0 2 64
SCALE OF FEET
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
M
O R
U W a s te w a te r R e h a b a n d E x p a n s io n
/1
-0
-D
.r v t
/9
/2
:3
:5
P
M
D101
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
EAST CLARIFIER (#2)
PROCESS PLAN &
SECTIONS
CLR
DJG
06/13/23
KSP
18678707-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
PROPOSED FINAL CLARIFIER PROCESS PLAN
SCALE AD101
SECTION2
SCALE AD101
SECTION3
SCALE BD101
SECTION4
KEYNOTES - PROCESS
# DESCRIPTION
D01 NEW DOME COVER AS SPECIFIED IN
SECTION 46 13 01 - FIBERGLASS COVERS -
DOME TYPE.
IC
IC
IC
J
S
NSHH-255
NSH-255
MCC-1
PLC-1
02-LP-1:37
E01
E02
E03
07-CLAR-2
LE-255
LIT-255
LSHH-294
LSHL-294
CP 07-CLAR-2
S2 E04
02-LP-1:38
E05
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-E
.r v t
/9
/2
:1
:5
A M
E101
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
EAST CLARIFIER (#2)
POWER AND LIGHTING
PLAN
GB
KLG
06/13/23
MTJ
18678707-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
EAST CLARIFIER (#2) POWER PLAN
ASCALE
EAST CLARIFIER (#2) LIGHTING PLAN
GENERAL NOTES
1. SEE AREA CLASSIFICATION AND ELECTRICAL EQUIPMENT INSTALLATION
SCHEDULE ON SHEET 00-E607.
KEYNOTES - ELECTRICAL
# DESCRIPTION
E01 DETAIL 04/00-E502.
E02 NEMA 4X PULLBOX, MOUNT TO
CLARIFIER WALL.
E03 MOUNT TO GUARDRAIL.
E04 MOUNT 1 1/4" CONUIT FOR STANCHION
MOUNT LIGHT TO GUARDRAIL.
E05 NEMA 4X PULLBOX.
X01
X01
X02
X02
X03
X04 X04
X05
A
X101
B
X101
C
X101
X03
X02X02
X02X02 X03
X01
X05
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
M
O R
U W a s te w a te r R e h a b a n d E x p a n s io n
/1
-0
-D
.r v t
/9
/2
:4
:3
P
M
X101 272051
WINTER BIOSOLIDS
STORAGE DEMOLITION
PLAN
CLR
DJG
06/13/23
KSP
18678708-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
WINTER BIOSOLIDS STORAGE FLOOR PLAN
GENERAL NOTES
1. CONTRACTOR TO TAKE SPECIAL CARE WHEN REMOVING
FEATURES ON THIS SHEET SO TO NOT DAMAGE THE EXISTING
STRUCTURE.
2. SEQUENCE WORK SO THAT WINTER SOLIDS DEWATERING
EQUIPMENT CAN BE UTILIZED DURING TIME PERIOD THAT
DEWATERING EQUIPMENT LOCATED IN THE SOUTH BUILDING IS
OUT OF SERVICE.
NO SCALE
PHOTOGRAPHA
NO SCALE
PHOTOGRAPHB
NO SCALE
PHOTOGRAPHC
X101
X101
X101
KEYNOTES - DEMOLITION
# DESCRIPTION
X01 REMOVE EXISTING EQUIPMENT PAD. USING A SAW, CUT PAD LOOSE
FROM EXISTING SLAB. DRILL OUT END OF ANY EXPOSED REBAR 1-1/2"
DEEP AND FILL WITH NON-SHRINK EPOXY GROUT.
X02 DEMOLISH AND DISPOSE OF BAG FILTER EQUIPMENT.
X03 DEMOLISH AND DISPOSE OF EXISTING SOLIDS HOLDING TANK.
X04 DEMOLISH AND DISPOSE OF ALL EXPOSED PIPING. CUT DRAIN LINES
FLUSH WITH FLOOR AND CAP OR PLUG UNUSED PIPING BELOW
FLOOR LEVEL SO AS NOT TO INTERFERE WITH NEW SOLIDS HOLDING
TANKS.
X05 DEMOLISH AND DISPOSED OF BAG FILTER COAGULANT TANK AND
ALL ASSOCIATED ELECTRICAL AND CONTROL CIRCUITS.
IC
J
T
P B
C B
INCOMING FEEDER
CONDUITS AND
JUNCTION BOX
TO REMAIN
INCOMING
CONTROLS
TO REMAIN
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-E
.r v t
/9
/2
:1
:0
A M
X102
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
WINTER BIOSOLIDS
STORAGE ELECTRICAL
PLAN - DEMO
GB
KLG
06/13/23
MTJ
18678708-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
WINTER BIOSOLIDS STORAGE ELECTRICAL PLAN - DEMO
GENERAL NOTES
1. DEMO ALL ELECTRICAL CONDUITS, WIRE AND EQUIPMENT BACK TO
SOURCE.
4"-WAS
4"-WAS
4"-DR
BIOSOLIDS TANK-1
BIO SOLIDS TANK-2
SEE 01-C103 FOR
CONITUATION
SEE 01-C103 FOR
CONITUATION
SEE 01-C103 FOR
CONITUATION
D101
D101
PLUG
VALVE
(TYP)
2 1/2"-WAS
WINTER SOLIDS
PUMP-1
WINTER SOLIDS
PUMP-2
08-WBT-1
08-WBT-2
4"-WAS
08-WSP-1
08-WSP-2
4"-WAS
4"-WAS
4"-WAS
FF
5004.00
CEILING
5012.504"-WAS
CL 5008.75
4"-WAS
CL 5001.00
BIO SOLIDS
TANK-2
PLUG
VALVE (TYP)
BIO SOLIDS
TANK-1
4"-WAS
4"-WAS
CL 5009.83
WINTER SOLIDS
PUMP-2
WINTER SOLIDS
PUMP-1
08-WBT-2 08-WBT-1
08-WSP-108-WSP-2
FF
5004.00
CEILING
5012.504"-WAS
CL 5008.75
BIO SOLIDS TANK-1
PLUG VALVE
(TYP)
4"-WAS
CL 5009.83
4"-WAS
CL 5007.67
WINTER BIOSOLIDS
PUMP-1
08-WBT-1
08-WSP-1
4"-WAS
CL 5005.00
4"-WAS
CL 5001.00
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
M
O R
U W a s te w a te r R e h a b a n d E x p a n s io n
/1
-0
-D
.r v t
/9
/2
:4
:2
P
M
D101
MOUNT RUSHMORE NATIONAL MEMORIAL
272051
WINTER BIOSOLIDS
STORAGE PROCESS PLAN &
SECTIONS
CLR
DJG
06/13/23
KSP
18678708-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
WINTER BIOSOLIDS STORAGE FLOOR PLAN
SCALE AD101
SECTION2
SCALE AD101
SECTION1
270°
315°
0°
45°
90°
135°
180°
225°
PLAN - BIOSOLIDS
STORAGE TANK (7'-2" ⌀ X 6'-5 1/2") - WBT-1
ITEM
DESCRIPTION
VERTICAL DISTANCE FROM
BASE OF TANK TO
CENTERLINE OF ITEM
1 6 IN DIA VENT CONNECTION NA - TOP ENTRY
2 4 IN DIA FILL CONNECTION SIDE - 4-3"
3 36 IN DIA TOP ACCESS FLANGE NA - TOP ENTRY
2 IN DIA OVERFLOW SIDE - 4'-3"
1 IN DIA DRAIN CONNECTION SIDE - 0'-6"
4 IN DIA PUMP SUCTION CONNECTION SIDE - 0'-6"
NADOME TOP-FLAT BOTTOM CONFIGURATION
2 IN ULTRA SONIC SENSOR NA - TOP ENTRY
270°
315°
0°
45°
90°
135°
180°
225°
PLAN - BIOSOLIDS
STORAGE TANK (7'-2" ⌀ X 6'-5 1/2") - WBT-2
ITEM
DESCRIPTION
VERTICAL DISTANCE FROM
BASE OF TANK TO
CENTERLINE OF ITEM
1 6 IN DIA VENT CONNECTION NA - TOP ENTRY
2 4 IN DIA FILL CONNECTION SIDE - 4-3"
3 36 IN DIA TOP ACCESS FLANGE NA - TOP ENTRY
2 IN DIA OVERFLOW SIDE - 4'-3"
1 IN DIA DRAIN CONNECTION SIDE - 0'-6"
4 IN DIA PUMP SUCTION CONNECTION SIDE - 0'-6"
NADOME TOP-FLAT BOTTOM CONFIGURATION
2 IN ULTRA SONIC SENSOR NA - TOP ENTRY
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
M
O R
U W a s te w a te r R e h a b a n d E x p a n s io n
/1
-0
-D
.r v t
/9
/2
:4
:2
P
M
D501
MOUNT RUSHMORE NATIONAL MEMORIAL
272051
WINTER BIOSOLIDS
STORAGE BUILDING TANK
DETAILS
CLR
DJG
06/13/23
KSP
18678708-
FINAL CONSTRUCTION DOCUMENTS
NO SCALE
BIOSOLIDS STORAGE TANK PLAN1
NO SCALE
BIOSOLIDS STORAGE TANK PLAN2
T
T
ΔP
Δ P
T 08-EF-1
08-MAU-1
x8 x1
12x12
12x12
G
-8 x
R1-12x8
R1-12x8
(435 CFM)
M1
A
M101
B
M101
EQUIPMENT PAD, SEE
STRUCTURAL DETAILS
1" LP PIPING UP
FROM BELOW GRADE.
SEE CIVIL PLANS FOR
CONTINUATIOM.
REGULATOR, DOWNSTREAM
PRESSURE 0.5"WC
SHUT-OFF VALVE
3/4"-NG
X1
X3
X2
FF
5004.00
CEILING
5012.50 x1
08-MAU-1
R1-12x8
EQUIPMENT PAD
FF
5004.00
CEILING
5012.50
8x12
12x12
08-EF-1
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
M
O R
U W a s te w a te r R e h a b a n d E x p a n s io n
/1
-0
-M
P .r v t
/9
/2
:1
:1
P M
M101
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
WINTER BIOSOLIDS
STORAGE MECHANICAL
PLANS
DJD
DJD
06/13/23
AJC
18678708-
100% DRAFT CONSTRUCTION DOCUMENTS
ASCALE
WINTER BIOSOLIDS STORAGE MECHANICAL PLAN
ASCALE
WINTER BIOSOLIDS STORAGE MECHANICAL DEMOLITION PLAN
SCALE AM101
SECTION AT 08-MAU-1A
SCALE AM101
SECTION AT 08-EF-1B
KEYNOTES - MECHANICAL
# DESCRIPTION
M1 TERMINATE OPEN END DUCT WITH BIRDSCREEN 12” AFF, MOUNT VOLUME
DAMPER IN VERTICAL 48” AFF AND BALANCE TO THE INDICATED CFM.
X1 DEMOLISH EXHAUST FAN IN VERTICAL, DUCTWORK, LOUVERS AND
CONTROLS.
X2 DEMOLISH INTAKE LOUVER AND DAMPER.
X3 DEMOLISH UNIT HEATER AND CONTROLS.
IC
IC
IC
J
IC
IC
IC
J
J
T
B
E
E
-M A
U
-108-LP-1:1
+48"
GFCI
08-LP-1:1
08-LP-1:1
+48"
GFCI
MS 08-SP-1
MS 08-SP-2
08-LP-1
08-BP-1
WP
GFCI
WET
08-SP-2
08-SP-1
PGB
LIT-380
LIT-375
PSH-298
PSH-299
+48"
GFCI
08-EF-1
08-WBT-2
08-WBT-1
08-BP-1
INCOMING FEEDER
CONDUITS AND
JUNCTION BOX
INCOMING
CONTROLS CONDUIT
AND JUNCTION BOX
08-LP-1:3
08-FS-1
08-FS-2
08-BVAP-103-INV-1:6
AFD 08-WSP-1
AFD 08-WSP-2
E02 E03
E04
AIT-681, ASH-681
ASHH-681, AE-681
XS-681.
08-LP-1:2
P3
P3E P3E
P3E
P3
GO/NO GO
LIGHT SYSTEM
03-INV-1:6 03-INV-1:6
03-INV-1:6
W2
03-INV-1:6
03-INV-1:6
E02 E02
E02
E02
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-E
.r v t
/9
/2
:1
:2
A M
E101
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
WINTER BIOSOLIDS
STORAGE POWER AND
LIGHTING PLANS
GB
KLG
06/13/23
MTJ
18678708-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
WINTER BIOSOLIDS STORAGE POWER PLAN
ASCALE
WINTER BIOSOLIDS STORAGE LIGHTING PLAN
GENERAL NOTES
1. SEE AREA CLASSIFICATION AND ELECTRICAL EQUIPMENT INSTALLATION
SCHEDULE ON SHEET 00-E607.
KEYNOTES - ELECTRICAL
# DESCRIPTION
E02 CIRCUIT EMERGENCY LIGHTING
FIXTURES AND 08-BVAP-1 TO 03-INV-1 IN
THE SOUTH BUILDING. PROVIDE
DISCONNECT SWITCH WITH SIGN
READING "EMERGENCY LIGHTING
CIRCUIT DISCONNECT SWTICH. DO NOT
TURN OFF EXCEPT FOR MAINTENANCE".
PROVIDE #4 CONDUCTORS FROM
03-INV-1 TO SWTICH AND THEN
TRANSITION TO #12 CONDUCTORS
INSIDE OF BUILDING.
E03 PROVIDE PULL BOX FOR DISCRETE
SIGNALS TO 03-PLC-2 FIELD LOCATE AND
SIZE PER NEC REQUIREMENTS FOR THE
CONDUIT CONFIGURATION.
E04 PROVIDE PULL BOX FOR ANALOG
SIGNALS TO 03-PLC-2. FIELD LOCATE
AND SIZE PER NEC REQUIREMENTS FOR
THE CONDUIT CONFIGURATION.
#4/0 AWG, TYP.
REFER TO SECTION
26 41 13 (TYP)
ASCALE
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-E
.r v t
/9
/2
:1
:0
A M
E102
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
WINTER BIOSOLIDS
LIGHTNING PROTECTION /
GROUNDING PLAN
GB
KLG
06/13/23
MTJ
18678708-
FINAL CONSTRUCTION DOCUMENTS
ASCALE
WINTER BIOSOLIDS LIGHTNING
PROTECTION / GROUNDING PLAN
GENERAL NOTES
1. SEE AREA CLASSIFICATION AND ELECTRICAL EQUIPMENT INSTALLATION
SCHEDULE ON SHEET 00-E607.
2. REFER TO SECTION 26 41 13 FOR ADDITIONAL LIGHTING PROTECTION
SYSTEM DESIGN AND INSTALLATION REQUIREMENTS.
5 5 4 4
30KVA ,3PH
480:208Y/120V
08-LP-1
120/208V
3PH,
4W
-C
D
AFD
-C
D
AFD
0.5
BRANCH PANEL 08-BP-1 100A, 480, 3 PHASE, 3W, 22KAIC, NEMA 4X
100 A 3P
F R
O M
3-
M C
C -1
A T
S O
U T
H B
U
IL
D
IN
G
20A 3P
W
IN
T E
R S
O
LI
D S
P
U M
P
-W S
P -2
3#
,1 #1
2G , 3
/4 "C
20A 3P
3#
,1 #1
2G , 3
/4 "C
S U
M P
P U
M P
-S
P P
-1
20A 3P
W
IN
T E
R S
O
LI
D
P
U M
P
-W S
P -1
S U
M P
P U
M P
-S
P P
-2
3#
,1 #1
2G , 3
/4 "C
20A 3P
3#6, 1#10G, 1"C
45A 3P
30 A 3P
3#
,1 #1
2G , 3
/4 "C
3#1, 1#8G, 1 1/2"C 3#
, 1
#1 2G
, 3 /4
"C
15AF
M A
K E
U P
A
IR
U N
IT
-M A
U -1
20A 3P
MFR CABLE, 3/4"C MFR CABLE, 3/4"C
IC IC
#6 BARE,
1/2"C
4#1, 1#6G, 2"C
E01
SPD
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-E
.r v t
/9
/2
:1
:0
A M
E601
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
WINTER BIOSOLIDS
ONE-LINE & SCHEDULE
GB
KLG
06/13/23
MTJ
18678708-
FINAL CONSTRUCTION DOCUMENTS
Notes:
TOTAL ESTIMATED DEMAND + SPARE: 3 A
SPARE AMPERAGE: 20.00%
TOTAL ESTIMATED DEMAND 3 A
TOTAL CONNECTED: 3 A
REC 720 VA 100.00% 720 VA TOTAL ESTIMATED DEMAND: 925 VA
LTS 90 VA 125.00% 113 VA TOTAL CONNECTED LOAD: 902 VA
HVAC 92 VA 100.00% 92 VA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND
PANEL TOTALS
TOTAL AMPS: 8 A 6 A 0 A
TOTAL LOAD: 810 VA 592 VA 0 VA
29 30 27 28 25 26 23 24 21 22 19 20 17 18 15 16 13 14
11 SPARE -- 20 A 1 0.0 12
9 SPARE -- 20 A 1 0.0 10
7 SPARE -- 20 A 1 0.0 0.0 1 15 A -- SPARE 8
5 SPARE -- 20 A 1 0.0 0.0 1 15 A -- SPARE 6
3 08-EF-1 HVAC 20 A 1 92.4 500.0 1 20 A Power 08-BVAP-1 4
1 REC REC 20 A 1 720.0 90.0 1 20 A LTS LIGHTING 2
CKT CIRCUIT DESCRIPTION CLASS TRIP P A B C P TRIP CLASS CIRCUIT DESCRIPTION CKT
Service Entrance Label: No 200% Neutral: No Enclosure: NEMA 4X Integral SPD: No MCB Rating: 100 A Mounting: WALL Wires: 4 Mains Rating: 100 A
Supply From: Phases: 3 Mains Type: MCB Location: WINTER BIOSOLIDS STORAGE BLDG Volts: 208Y/120 A.I.C. Rating:
Branch Panel: 08-LP-1
KEYNOTES - ELECTRICAL
# DESCRIPTION
E01 FUSE SIZE BASED ON BASIS OF DESIGN
EQUIPMENT RATINGS. COORDINATE
FUSE SIZES FOR THE ACTUAL SUPPLIED
EQUIPMENT IN ACCORDANCE WITH NEC
REQUIREMENTS. REFER TO APPROVED
EQUIPMENT SHOP DRAWINGS
FOREQUIPMENT RATINGS. TYPICAL ALL
EQUIPMENT SHOWN WITH WITH FUSED
DISCONNECT SWITCHES.
CPT
ON REMOTE
OFF
W
R
A
A
CR3CR4 CR2
AUTO MANUAL
CR1
CR2
CR3
CR4
CR2
CR5
MCP
HP
XO
Ø A
Ø B
Ø C
G N
D
480:120V
FUFU
FU
RUN
AFD
24V+
INPUT 1
INPUT 4
CR1OX
RUN COMMAND
CR2 PRESSURE SIGNAL
CR4 FAULT SIGNAL
CR3 RUNNING SIGNAL
PLC
OUTPUT 1
OUTPUT 2
INPUT 2
INPUT 3
PRESSURE
AFD INPUT/OUTPUT CONTROL
INPUT 1 REMOTE MOTOR START/STOP COMMAND CONTACT CLOSED - RUN COMMAND ISSUED
INPUT 2 INHIBIT CONTACT CLOSED - MOTOR IS PERMITTED TO RUN
CONTACT OPEN - TRIP/INHIBIT MOTOR RUN REGARDLESS OF CONTROL SOURCE
I/O FUNCTION CONTROL/STAUS DESCRIPTION
INPUT 4 AUTOMATIC/MANUAL COMMAND
CONTACT CLOSED - AUTOMATIC MODE
CONTACT OPEN - MANUAL MODE
INPUT 3 RESET CONTACT CLOSED - RESET THE AFD
RESET
POWER INDICATOR
RUN INDICATOR
FAULT INDICATOR
PRESSURE INDICATOR
MOTOR RUNNING
TO PLC
MOTOR FAULT
TO PLC
PRESSURE
SIGNAL TO PLC
CR5 AUTO/MANUAL COMMAND
OUTPUT 2 FAULT AFD HAS ISSUED A FAULT
OUTPUT 1 RUN AFD IS RUNNING BASED ON MOTOR CURRENT
SWITCH
AUX
AUTO MODE
SPEED SIGNAL
FROM
03-PLC-2
4-20mA
INPUT
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFA
u to d e s k D o c s /1
M O
R U
W a s te w a te r R e h a b a n d
E x p a n s io n
/1
-0
-E
.r v t
/9
/2
:1
:0
A M
E602
MOUNT RUSHMORE NATIONAL MEMORIAL
10298966
WINTER BIOSOLIDS MOTOR
CONTROL DIAGRAMS
GB
KLG
06/13/23
MTJ
18678708-
FINAL CONSTRUCTION DOCUMENTS
MOTOR CONTROL DIAGRAM 08-CD1
08-WSP-1
08-WSP-2
GENERAL NOTES
1. CONTROL DIAGRAMS ARE SHOWN FOR FUNCTIONAL PURPOSES.
PROVIDE COMPONENTS/INTERLOCKS NECESSARY FOR A COMPLETE
AND FUNCTIONING SYSTEM AS OUTLINED IN SECTION 40 61 96 -
PROCESS CONTROL DESCRIPTIONS.
2. ▲ DENOTES FIELD DEVICE.
XXX
ACKNOWLEDGE
EMERGENCY STOP
FAILURE
FORWARD-OFF-REVERSE
FORWARD-REVERSE
FAST-SLOW
HAND-AUTO
HAND-OFF-AUTO
HAND-OFF-REMOTE
LEAD-LAG
LEAD-LAG-STANDBY
LOCAL-OFF-REMOTE
LOCAL-REMOTE
LEAD-STANDBY
MANUAL-AUTO
OPEN-AUTO-CLOSE
OPEN-CLOSE
ON-OFF
OPEN-STOP-CLOSE
RUN-JOG
RUN-JOG-REVERSE
SILENCE
START-STOP
START
STOP
ACK
ES
FAIL
FOR
FR
FS
HA
HOA
HOR
LL
LLS
LOR
LR
LS
MA
OAC
OC
OO
OSC
RJ
RJR
SIL
SS
STR
STP
GENERAL NOTES:
1. THIS IS A STANDARD INSTRUMENTATION SYMBOLOGY AND
ABBREVIATIONS SHEET. LISTING OF SYMBOLS AND
ABBREVIATIONS DOES NOT IMPLY ALL SYMBOLS AND
ABBREVIATIONS HAVE BEEN USED ON THIS PROJECT.
2. SEE PROCESS, MECHANICAL AND PLUMBING LEGEND SHEET
FOR MISCELLANEOUS PIPING SYMBOLS.
3. SCREENING OR SHADING OF WORK IS USED TO INDICATE
EXISTING COMPONENTS OR TO DE-EMPHASIZE PROPOSED
IMPROVEMENTS TO HIGHLIGHT SELECTED TRADE WORK.
REFER TO CONTEXT OF EACH SHEET FOR USAGE.
4. VALVE SYMBOLS SHOWN HERE ARE APPLICABLE ONLY TO
INSTRUMENTATION DIAGRAMS. SEE PROCESS, MECHANICAL
AND PLUMBING LEGEND SHEET FOR VALVE SYMBOLS USED
ELSEWHERE ON THE SHEETS.
SUCCEEDING LETTERSFIRST LETTER
CONTROL
USER'S CHOICE
HIGH
LOW
CONTROL
STATION
RATIO (FRACTION)
DIFFERENTIAL
TIME; RATE OF
CHANGE
SCAN
SENSOR (PRIMARY
LIGHT
INDICATE
VIEWING DEVICE
GLASS, GAUGE
ELEMENT)
USER'S CHOICE
ALARMA
C
B
E
D
F
H
J
I
K
M
L
G
XXX
TIME SCHEDULE
RUNNING
TIME,
LEVEL
USERS CHOICE
USERS CHOICE
USER'S CHOICE
HAND
CURRENT
(ELECTRICAL)
POWER
FLOW RATE
VOLTAGE
ANALYSIS
BURNER,
COMBUSTION
FI
M
FT
SWITCH
USER'S CHOICE
TRANSMIT
DRIVER,
UNCLASSIFIED
AUXILLIARY DEVICES
MULTIFUNCTION
VALVE, DAMPER,
LOUVER
SAFETY
INTEGRATE,
TOTALIZE
X AXIS
Y AXIS
WELL PROBE
MULTIFUNCTION
RECORD
POINT (TEST)
CONNECTION
USER'S CHOICE
ORIFICE,
RESTRICTION
UNCLASSIFIED
FINAL CONTROL
ELEMENT
ACTUATOR,
N
P
O
Q
S
R
T
U
V
X
Y
W
Z
TEMPERATURE
VIBRATION, MECH.
WEIGHT, FORCE
POSITION,
DIMENSION
UNCLASSIFIED
EVENT, STATE
OR PRESENCE
MULTIVARIABLE
ANALYSIS
TORQUE
USER'S CHOICE
RADIATION
SPEED,
FREQUENCY
PRESSURE,
VACUUM
QUANTITY
TE
FG
O O
X X
MAIN PROCESS LINE
SECONDARY PROCESS LINE
AUXILIARY PROCESS LINE
DIRECTION OF FLOW
PNEUMATIC SIGNAL
ELECTRICAL SIGNAL
HYDRAULIC SIGNAL
SOFTWARE OR DATA LINK
SIGNAL CONNECTION
CROSSOVER - NO CONNECTION
CAPILLARY
OFF PAGE CONNECTOR
I
ORIFICE PLATE
PITOT TUBE OR ANNUBAR
ROTOMETER
SONIC OR ULTRASONIC FLOWMETER
MAGNETIC FLOWMETER
MASS DISPERSION FLOWMETER
FLUME
WEIR
PROPELLER OR TURBINE METER
VENTURI TUBE
VENTURI FLUME
FLOAT SWITCH
TEMPERATURE ELEMENT WITH THERMOWELL
SIGHT FLOW GLASS
LOCALLY MOUNTED FIELD INSTRUMENTATION
MOUNTED ON PANEL FRONT
MOUNTED INSIDE PANEL
FRONT PANEL MOUNTED ON AUXILIARY PANEL
(SUBSCRIPT INDICATES PANEL)
MOUNTED INSIDE AUXILIARY PANEL
PILOT LIGHT
INSTRUMENT FUNCTIONS SHARING COMMON HOUSING
COMPLEX INTERLOCK AS DEFINED IN CONTROL DIAGRAM OR IN
SPECIFICATIONS
SHARED DISPLAY, SHARED CONTROL,
FIELD MOUNTED
SHARED DISPLAY, SHARED CONTROL, PRIMARY LOCATION -
NORMALLY ACCESSIBLE TO OPERATOR
PROGRAMMABLE LOGIC CONTROL, PRIMARY LOCATION -
NORMALLY ACCESSIBLE TO OPERATOR
PROGRAMMABLE LOGIC CONTROL, FIELD MOUNTED
UNCLASSIFIED
MULTIFUNCTION
MIDDLE,
INTERMEDIATE
USER'S CHOICE
USER'S CHOICE
CLOSED
READOUT OR
PASSIVE
FUNCTION
OUTPUT/ACTIVE
FUNCTION
FUNCTION
MODIFIER
MEASURED OR
INITIATING
VARIABLE
VARIABLE
MODIFIER
INSTRUMENT SYMBOLOGYPRIMARY ELEMENT SYMBOLOGY
LINE TYPES
CROSS REFERENCE SYMBOLOGY
INSTRUMENT IDENTIFICATION LETTERS MISCELLANEOUS
SYMBOLOGY
CONTROL SWITCH NOTATION ABBREVIATIONS
DEVIATION
SCAN
INTEGRATE
TOTALIZE
RUN
STOP
ACCESSORY DEVICES
UNCLASSIFIED
Z AXIS SAFETY
INSTRUMENTED
SYSTEM
XXX
zzz
YYY
SUBSCRIPTS
XXX - CONNECTOR NUMBER
YYY - SHEET CONTINUATION
ZZZ - SERVICE ABBREVIATION
A
IA
ES
NG
HYD
PLANT COMPRESSED AIR
INSTRUMENTATION AIR
ELECTRIC SUPPLY
NATURAL GAS
HYDRAULIC
TYPES OF POWER SUPPLY
ANALOG INPUT
ANALOG OUTPUT
CHLORINE (ANALYZER MODIFIER)
DIGITAL INPUT
DENSITY (ANALYZER MODIFIER)
DIGITAL OUTPUT
VOLTAGE TO PNEUMATIC
INPUT/OUTPUT
CURRENT TO PNEUMATIC
OPERATOR INTERFACE
OXYGEN (ANALYZER MODIFIER)
CARBON MONOXIDE (ANALYZER MODIFIER)
CARBON DIOXIDE (ANALYZER MODIFIER)
COMBUSTIBLES (ANALYZER MODIFIER)
CONDUCTIVITY (ANALYZER MODIFIER)
DISSOLVED OXYGEN (ANALYZER MODIFIER)
HYDROGEN SULFIDE (ANALYZER MODIFIER)
HYDROGEN CHLORIDE (ANALYZER MODIFIER)
NITROGEN OXIDE (ANALYZER MODIFIER)
PROCESS AND INSTRUMENTATION DIAGRAM
AO
CO
AI
DO
DO
DI
I/O I/P
OI
O2
CL2
CO2
COMB
COND
DEN
E/P H2S
HCL
NOX
P&ID
TURBIDITY (ANALYZER MODIFIER)
WIDE AREA NETWORK
TURB
WAN
SUSPENDED SOLIDS (ANALYZER MODIFIER)SS
MISCELLANEOUS INSTRUMENTATION ABBREVIATIONS
PHOSPHATEPHOS
PMIS/PKG NO.
SHEET
OF
FINAL CONSTRUCTION DOCUMENTS
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFMOUNT RUSHMORE NATIONAL MEMORIAL
272051
EIS
KER
06/13/23
186787
CJA
INSTRUMENTATION
P&ID
INSTRUMENTATION LEGENDG001
09-
205 235
GENERAL NOTES:
1. THIS IS A STANDARD INSTRUMENTATION SYMBOLOGY AND
ABBREVIATIONS SHEET. LISTING OF SYMBOLS AND
ABBREVIATIONS DOES NOT IMPLY ALL SYMBOLS AND
ABBREVIATIONS HAVE BEEN USED ON THIS PROJECT.
2. SEE PROCESS, MECHANICAL AND PLUMBING LEGEND SHEET
FOR MISCELLANEOUS PIPING SYMBOLS.
3. SCREENING OR SHADING OF WORK IS USED TO INDICATE
EXISTING COMPONENTS OR TO DE-EMPHASIZE PROPOSED
IMPROVEMENTS TO HIGHLIGHT SELECTED TRADE WORK.
REFER TO CONTEXT OF EACH SHEET FOR USAGE.
4. VALVE SYMBOLS SHOWN HERE ARE APPLICABLE ONLY TO
INSTRUMENTATION DIAGRAMS. SEE PROCESS, MECHANICAL
AND PLUMBING LEGEND SHEET FOR VALVE SYMBOLS USED
ELSEWHERE ON THE SHEETS.
MISCELLANEOUS
SYMBOLOGY
EQUIPMENT
DIAPHRAGM PUMP
DOUBLE DISC PUMP
PROGRESSIVE CAVITY PUMP
POSITIVE DISPLACEMENT PUMP
HYDRAULICALLY ACTIVATED PISTON PUMP
HAND PUMP
PERISTALIC PUMP
PROPELLOR PUMP
POLYMER PUMP
EDUCTOR PUMP
CENTRIGUAL SUMP PUMP
CARBON FEED PUMP
CENTRIFUGAL PUMP
HORIZONTAL CENTRIFUGAL PUMP
RECIRCULATION PUMP
PROPORTING PUMP
SLUDGE LAGOON PUMP
ROTORY LOBE PUMP
SCREW PUMP
SUBMERSIBLE PUMP
VERTICAL INLINE PUMP
VACUUM PUMP
VERTICAL TURBINE SUBMERSIBLE PUMP
VERTICAL CAN PUMP TYPE 1
VERTICAL CAN PUMP TYPE 2
EQUIPMENT VALVES
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
CONE VALVE
BALL CHECK VALVE
DIAPHRAGM VALVE
DOUBLE-DISK CHECK VALVE
GATE OR GENERAL VALVE
GLOBE VALVE
KNIFE GATE VALVE
NEEDLE VALVE
PLUG VALVE
PINCH VALVE
THREE-WAY PLUG VALVE
THREE-WAY BALL VALVE
PRESSURE-REGULATING VALVE
PRESSURE-REDUCING VALVE
VAC = VACUUM
A = AIR RELEASE
AIR-RELEASE VACUUM VALVE
PRESSURE-RELIEF VALVE
X
OR
THREE-WAY CONTROL VALVE
SOLENOID
FLOAT OPERATOR
S
SPRING-OPPOSED SINGLE-ACTING
PNEUMATIC CYLINDER
DOUBLE-ACTING PNEUMATIC CYLINDER
PNEUMATIC DIAPHRAGM
PNEUMATIC DIAPHRAGM WITH POSITIONER
ACTUATOR SYMBOLOGY
M = MOTOR
P = PNEUMATIC
X OPERATOR ABBREVIATIONS:
ANNULAR SEAL
STACKED ANNULAR SEALS
FLEXIBLE HOSE
AERATION DIFFUSER
CAMERA
PMIS/PKG NO.
SHEET
OF
FINAL CONSTRUCTION DOCUMENTS
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFMOUNT RUSHMORE NATIONAL MEMORIAL
272051
EIS
KER
06/13/23
186787
CJA
INSTRUMENTATION
P&ID
INSTRUMENTATION LEGENDG002
206 235
PRESSURE INSTRUMENTATION
WITH ANNULAR SEAL
NOT TO SCALE
NOTES:
1. SEAL UNITS TO BE FACTORY ASSEMBLED.
2. MODIFY ORIENTATION OF INSTRUMENT WHERE INSTALLED ON VERTICAL PIPE.
1/4" SST PIPE FITTINGS
PRESSURE GAUGEPRESSURE INDICATING TRANSMITTER
WITH PRESSURE SWITCH
PRESSURE INSTRUMENTATION
WITH ANNULAR SEAL
NOT TO SCALE
NOTES:
1. SEAL UNITS TO BE FACTORY ASSEMBLED.
2. MODIFY ORIENTATION OF INSTRUMENT WHERE INSTALLED ON VERTICAL PIPE.
1/4" SST PIPE NIPPLE
PRESSURE GAUGE
FLANGE BOLT
FLANGE GASKET
FLANGE BOLT
FLANGE GASKET
2 GROUNDING RINGS
MAGMETER
BONDING STUD ON BODY
GROUND RING BOND TO
METER BODY WITH #10
STRANDED COPPER WIRE
MAGNETIC FLOW METER GROUNDING
RING BONDING DETAIL
NOT TO SCALE
NOTES:
1. THREADOLET TO BE MOUNTED ON THE
HORIZONTAL CENTERLINE OF THE PIPE.
2. SWITCH "FLAT-UP AND LEVEL" INDICATOR
SHALL BE ADHERED TO.
3. ALL CONDUIT RUNS MUST BE SUPPORTED AT
LEAST EVERY 10 FEET AND WITHIN 2 FEET OF
EACH END. ALL MOUNTED BRACKETS ARE TO
BE ANCHORED SECURELY TO AN I-BEAM, WALL,
OR STAND.
REMOTE PRESSURE TRANSMITTER-
LIQUID APPLICATIONS
NOT TO SCALE
1/2" SS TUBING, TYPICALBALL VALVE
PROCESS PIPE
SLOPE DOWN
1/2 INCH
PER FOOT
SLOPE DOWN
1/2 INCH
PER FOOT
PRESSURE
TRANSMITTER
2-VALVE MANIFOLD
THERMAL FLOW SWITCH
GENERAL INSTALLATION
NOT TO SCALE
FURNISHED WITH SWITCH
FURNISHED WITH SWITCH
NOTE 1
NOTE 1
NOTE 2
NOTE 2
PIPE SPEC. #
ITEM DESCRIPTION
MATERIAL LIST
SPEC.NUM.
1 1" THREADOLET
2 FLOW SWITCH
REMOTE MOUNT
LOCAL MOUNT
1/2" PIPE
PROCESS PIPE
2-VALVE MANIFOLD
PRESSURE
TRANSMITTER
NOTES
ALL MATERIALS AND TYPE FITTINGS FOR EACH
INSTALLATION ARE PER PIPING SPECIFICATION.
PMIS/PKG NO.
SHEET
OF
FINAL CONSTRUCTION DOCUMENTS
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFMOUNT RUSHMORE NATIONAL MEMORIAL
272051
EIS
KER
06/13/23
186787
CJA
INSTRUMENTATION
INSTRUMENT
INSTALLATION DETAILSY501
207 235
TYPICAL INSTALLATION DETAIL
WET WELL LEVEL FLOATS
NOT TO SCALE
JUNCTION BOX
ACCESS OPENING
(SEE NOTE 1)
TOP OF WET WELL
WET WELL WALL
PROVIDE SLACK IN CABLE
TO ENABLE FUTURE ADJUSTMENT
1"PVC MOUNTING PIPE
STRAP FLOAT SWITCH CABLE TO
PIPE EVERY 12"
PIPE CLAMP & 3/8" SS BOLTS WITH
EXPANSION ANCHORS EVERY 3' MAX
CABLE
FLOAT
FLOAT
NOTES:
1. LEVEL FLOATS TO BE MOUNTED WITHIN 18" TO ONE SIDEOF ACCESS
OPENING.
2. WHEN FLOATS ARE SET CLOSER THAN 18" OF LEVEL DIFFERENCE,
ROTATE FLOATS AROUND PIPE TO AVOID INTERFERENCE.
PMIS/PKG NO.
SHEET
OF
FINAL CONSTRUCTION DOCUMENTS
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFMOUNT RUSHMORE NATIONAL MEMORIAL
272051
EIS
KER
06/13/23
186787
CJA
INSTRUMENTATION
INSTRUMENT
INSTALLATION DETAILSY502
208 235
PROCESS
HMI
PLC-2
B 09-Y623
DRAIN FROM
WINTER SOLIDS BUILDING
MANHOLE MANHOLE CHANNEL SCREEN
03-SCR-1
LIT
LI
MA
FAULT
M
FE
US
FIT
SAMPLER
FI
BAR SCREEN
(MANUAL)
INFLUENT CHANNEL
8" SCREEN OVERFLOW
A 09-Y602
TO EQ BASIN
6"-SS
DUMPSTER
M
MA
M
LI
FI
HS
ESTOP
FOR
HOA
LCS 03-SCR-01
LOCAL CONTROL STATION
S
S
S
SV-105C
SV-105B
SV-105A
NPW
RUN
O/L
KQI
HOURS
R
TEMP
HS
RESET
CP 03-SCR-1
CONTROL PANEL
SANITARY SEWER
FROM PARK
(V)
(V)
(V)
(V)
(V)
(V)
GENERAL NOTES:
1. THE PROCESS AND INSTRUMENTATION
DIAGRAM IS NOT USED TO PROVIDE
COMPLETE DETAIL OF ALL MECHANICAL
COMPONENTS (E.G. ISOLATION VALVES).
THE PRIMARY FUNCTION OF THIS
DIAGRAM IS TO DEPICT
INSTRUMENTATION, CONTROL
FUNCTIONS AND SIGNALS ASSOCIATED
WITH THE PROCESS.
SC
SC
INFLUENT SAMPLER
(CS-1)
INSTRUMENTATION
P&ID
HEADWORKS
PMIS/PKG NO.
SHEET
OF
FINAL CONSTRUCTION DOCUMENTS
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFMOUNT RUSHMORE NATIONAL MEMORIAL
272051
EIS
KER
06/13/23
186787
CJA
Y601
209 235
PLC-2
FROM SOUTH BUILDING SUMP PUMP
A 09-Y601
FROM HEADWORKS
B 09-Y611
FROM CLARIFIERS
(VIA SCUM PIT)
B 09-Y610
FROM RWAS
PUMPS
INFLUENT FLOW
EQUALIZATION BASIN
AERATED SLUDGE
HOLDING TANK
D 09-Y606
FROM AERATION
BLOWERS
A 09-Y604
TO AERATION
BASINS 2A, 1B, 2B
C 09-Y603
TO EQUALIZATION
BASIN
M
LIT
03-EQMX-1
E 09-Y603
TO EQUALIZATION
D 09-Y616
TO DEWATERING
BASIN DECANT
FE
FV
OVERFLOW
FV
B 09-Y604
BASINS 1A
M
EQ BASIN BYPASS
FV-125
LIT
ZC
FI
FI
ZC
FI
FI
LI
LIT
LI
M
M
RUN
MA
MA
FAIL
ZC
ZC
A 09-Y603
FROM EQUALIZATION BASIN
LPA
B 09-Y619
FROM LOADOUT
TGS
WAS / SCUM
A 09-Y601
FROM SOUTH BUILDING
UPPER LEVEL DRAINS
A 09-Y601
FROM HEADWORKS
CEN
A 09-Y619
CENTRATE FROM CENTRIFUGES
AND LOADOUT DRAIN
FV-225
I P
I P
GENERAL NOTES:
1. THE PROCESS AND INSTRUMENTATION
DIAGRAM IS NOT USED TO PROVIDE
COMPLETE DETAIL OF ALL MECHANICAL
COMPONENTS (E.G. ISOLATION VALVES).
THE PRIMARY FUNCTION OF THIS
DIAGRAM IS TO DEPICT
INSTRUMENTATION, CONTROL
FUNCTIONS AND SIGNALS ASSOCIATED
WITH THE PROCESS.
FIC
FLOW
FIC
FLOW
B 09-Y620
FROM FERRIC CHLORIDE SYSTEM
A 09-Y620
FROM FERRIC CHLORIDE SYSTEM
B 09-Y621
FROM SODIUM HYDROXIDE SYSTEM
A 09-Y621
FROM SODIUM HYDROXIDE SYSTEM
FC
FC
MS
TSH
GRINDER
03-ABIGR-1
KEYNOTES
# DESCRIPTION
Y01 BID OPTION #5, PROVIDE NEW AERATION
BASIN INFLUENT GRINDER (03-ABIGR-1),
CONTROL PANEL, VALVES AND PIPING.
THE BASE BID EXCLUDES THE ADDITION
OF THIS EQUIPMENT.
Y##
R
RUN
A
FAIL
HS
HOA
W
PWR
HS
M
MA
YL
HS
S/S M
RUN
MA
FAIL
YL
AUTO
M
Y01
480V
CONTROL PANEL
CP 03-ABIGR-1
PMIS/PKG NO.
SHEET
OF
FINAL CONSTRUCTION DOCUMENTS
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFMOUNT RUSHMORE NATIONAL MEMORIAL
272051
EIS
KER
06/13/23
186787
CJA INFLUENT EQ BASIN & AERATED
SLUDGE HOLDING TANKY602
09- INSTRUMENTATION
210 235
PLC-2
C 09-Y602
FROM INFLUENT FLOW
F 09-Y602
FROM AERATED SLUDGE
HOLDING TANK
EQUALIZATION BASIN #2
OVERFLOW
EQUALIZATION BASIN #3
M
LSLL
SUMP
M
LSLL
TO INFLUENT FLOW
03-EQMX-3
03-EQMX-2
LALL
LALL
M
M
RUN
MA
MA
FAIL
LALL
LALL
M
M
RUN
MA
MA
FAIL
GENERAL NOTES:
1. THE PROCESS AND INSTRUMENTATION
DIAGRAM IS NOT USED TO PROVIDE
COMPLETE DETAIL OF ALL MECHANICAL
COMPONENTS (E.G. ISOLATION VALVES).
THE PRIMARY FUNCTION OF THIS
DIAGRAM IS TO DEPICT
INSTRUMENTATION, CONTROL
FUNCTIONS AND SIGNALS ASSOCIATED
WITH THE PROCESS.
MS
MS
TSH
TSH
PMIS/PKG NO.
SHEET
OF
FINAL CONSTRUCTION DOCUMENTS
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFMOUNT RUSHMORE NATIONAL MEMORIAL
272051
EIS
KER
06/13/23
186787
CJA
INSTRUMENTATION
P&ID
EQUALIZATION BASINY603
211 235
PLC-1
F 09-Y605
TO AERATION BASIN 1B
09-Y606
FROM BLOWER HEADER
09-Y607
FROM ARP PUMPS
09-Y602
FROM INFLUENT FLOW
EQUALIZATION BASIN
09-Y607
FROM ARP PUMPS
PP
P
LSHH
137A
AE
DO
136B
AE
DO
M
04-ABMX-1A3
AIT
AIT
138A
AE
NO3
138B
AE
PH/TEMP
M
04-ABMX-1A1
M
04-ABMX-1A2
136A
AE
DO
M
04-ABMX-2A1
M
04-ABMX-2A2
146A
AE
DO
P
146B
AE
DO
LSHH
147A
AE
DO
M
04-ABMX-2A3
AIT
09-Y607
TO ARP PUMPS
09-Y607
TO ARP PUMPS
09-Y608
TO CLARIFIER NO. 1
RC/RAS
LPA
ABI
RC/RAS
LPA
09-Y605
FROM AERATION BASIN 2B
CLI
148A
NO3
148B
AE
PH/TEMP
ABI
ZC
136C
M
M
RUN
MA
MA
FAIL
TYPICAL OF 6 MIXERS TYPICAL OF 6 AIR VALVES
ZC
136C
P
LAHH
LAHH
TYPICAL OF 2
LEVEL SWITCHES
AI
138B
AI
138A
TI
138B
AI
138B pH
TI
138B
TEMP
AI
138A
NO3
AI
136B
AI
136B
DO
AI
136A
AI
136A
DO
AI
146B
AI
146B
DO
AI
146A
AI
146A
DO
AI
148B
AI
148A
TI
148B
AI
148B pH
TI
148B
TEMP
AI
148A
NO3
AIRZONE
1OX1b
ZONE
1AX1b ZONE
1OX1aZONE 1AX1a
AERATION BASIN 1A
AERATION BASIN 2A
ZONE
2AX1b
ZONE
2OX1b
ZONE
2OX1aZONE
2AX1a
AIR
AI
137A
AI
137A
DO
AIT
AIT
AI
147A
AI
147A
DO
A
B
A
C
B
AV-136BAV-136C
AV-136A
AV-146A
AV-146BAV-146C
A
B
C
RC
RC
CLI
HS
HS
S/S
ABI
09-Y602
FROM INFLUENT FLOW
EQUALIZATION BASIN
B
ABI
09-Y622A
ABI
P
D 09-Y605
TO AERATION BASIN 2B
E 09-Y605
TO AERATION BASINS 1B, 2B
GENERAL NOTES:
1. THE PROCESS AND INSTRUMENTATION
DIAGRAM IS NOT USED TO PROVIDE
COMPLETE DETAIL OF ALL MECHANICAL
COMPONENTS (E.G. ISOLATION VALVES).
THE PRIMARY FUNCTION OF THIS
DIAGRAM IS TO DEPICT
INSTRUMENTATION, CONTROL
FUNCTIONS AND SIGNALS ASSOCIATED
WITH THE PROCESS.
MS
TSH
AIR
AIR
AIR
AIR
AIR
AIR
CLI
CLI
FROM NORTH BUILDING
SUMP PUMP
PMIS/PKG NO.
SHEET
OF
F…