Addendum_Items_20230828_-_Attachment_00-D004_0008.pdf

PDF 193 KB Posted

Attached to
MORU 272051 WWTP Solicitation
Solicitation number
140P2023R0125
Issued by

About this file

This document is a process flow diagram for a wastewater treatment plant. It depicts the flow of water and solids through various treatment units including clarifiers, anoxic and oxic basins, tertiary filters, ultraviolet disinfection, and a bi solids handling system. The bi solids handling system includes centrifuges, conveyors, and polymer makeup units. A bid option is shown to replace existing centrifuge and solids handling equipment. Key valves, mixers and filters are also identified.

The related federal contract opportunity is a solicitation issued by the National Park Service for upgrades to the Mount Rushmore National Monument Wastewater Treatment Plant. The solicitation number is 140P2023R0125 and involves replacing process equipment and solids handling units per the details in the process flow diagram. The response due date and award timing are not specified.

View the file

Other files

File Type Posted
Amendment_08_Questions_and_Answers_0008.pdf PDF
Sol_140P2023R0125_Amd_0008.pdf PDF
Addendum_Items_20230828_0008.pdf PDF
Addendum_20230905_0008.pdf PDF
Attachment_00-D004_0007.pdf PDF
Addendum_Items_0007.pdf PDF
Sol_140P2023R0125_Amd_0007.pdf PDF
Questions_and_Answers_for_Solicitation_140P2023R0125_0007.pdf PDF
MORU_CD_Volume_4_0006.pdf PDF
MORU_CD_Volume_1_0006.pdf PDF
MORU_CD_Volume_3_0006.pdf PDF
MORU_CD_Volume_2_0006.pdf PDF
Sol_140P2023R0125_Amd_0006.pdf PDF
MORU_Prebid_Sign_in_Sheet_0006.pdf PDF
Sol_140P2023R0125_Amd_0005.pdf PDF
Amendment_05_Attachment_5_VOLUME_3__South_Bldg__COMPLETE_0005.pdf PDF
Amendment_04_Attachment_12a_Fillable_B08_Solit_PSP_Vol_II_LmtOnSubcontracting_REQD_0004.xlsx XLSX spreadsheet
Amendment_04_Attachment_2a_Specification_Water_Treatment_Plant_Expansion_Project_Manual_-_Volume_2_-_6-12-23_0004.pdf PDF
Amendment_04_Attachment_13_Wage_Detemination_0004.pdf PDF
Amendment_04_Attachment_12_Fillable_-_ContractPriceSchedule_23_6_13_CD_0004.xlsx XLSX spreadsheet
Amendment_04_Attachment_4_VOLUME_2__North_Bldg__COMPLETE_0004.pdf PDF
Amendment_04_Attachment_7_STATEMENT_OF_STRUCTURAL_TESTS_AND_SPECIAL_INSPECTIONS_0004.pdf PDF
Amendment_04_Attachment_2_Specification_Water_Treatment_Plant_Expansion_Project_Manual_-_Volume_1_-_6-12-23_Rev1_0004.pdf PDF
Amendment_04_Attachment_9_Closeout-OperationMaintenance-Requirements_0004.pdf PDF
Amendment_04_Attachment_5_VOLUME_3__South_Bldg__COMPLETE_0004.pdf PDF
Amendment_04_Attachment_10_Bid_Bond__VOL-1-24-16e_0004.pdf PDF
Amendment_04_Attachment_6_VOLUME_4__Series_04-09__COMPLETE_0004.pdf PDF
Amendment_04_Attachment_11_PSP_VOL_1_0004.pdf PDF
Amendment_04_Attachment_8_Geotechnical_Report_0004.pdf PDF
Amendment_04_Attachment_1_SF-1442_and_Clauses_0004.pdf PDF
Amendment_04_Attachment_3_VOLUME_1_Series_00-01__General__Civil_0004.pdf PDF
Amendment_04_Attachment_11a_PSP_VOL_2_0004.pdf PDF
Sol_140P2023R0125_Amd_0004.pdf PDF
Amendment_03_MORU_Water_Treatment_Plant_Expansion_Project_Manual_-_Volume_1_-_6-12-23_Rev1_0003.pdf PDF
MORU_Water_Treatment_Plant_Expansion_Project_Manual_-_Volume_1_-_6-12-23_Rev1_0003.pdf PDF
MORU_Water_Treatment_Plant_Expansion_Project_Manual_-_Volume_2_-_6-12-23_0003.pdf PDF
Amendment_03_MORU_Water_Treatment_Plant_Expansion_Project_Manual_-_Volume_2_-_6-12-23_0003.pdf PDF
Sol_140P2023R0125_Amd_0003.pdf PDF
Sol_140P2023R0125_Amd_0002.pdf PDF
Amendment_02_MORU_MAP_0002.pdf PDF
Amendment_02_MORU_WWTP_PREBID_INSTRUCTIONS_0002.pdf PDF
Sol_140P2023R0125_Amd_0001.pdf PDF
B08__WWTP_SOLICITATION_140P2023R0125_7_24_23_0001.pdf PDF
Attachment_2_VOLUME_1_Series_00-01__General__Civil.pdf PDF
Attachment_7_MORUGeotechnical_Report.pdf PDF
Attachment_6_STATEMENT_OF_STRUCTURAL_TESTS_AND_SPECIAL_INSPECTIONS.pdf PDF
Attachment_9a_Bid_Bond__VOL-1-24-16e.pdf PDF
Attachment_3_VOLUME_2__North_Bldg__COMPLETE.pdf PDF
Sol_140P2023R0125.pdf PDF
Attachment_10a_Fillable_-_ContractPriceSchedule_23_6_13_CD.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RWAS-1

ARP-1

M

FLOW

METER

E

M

FLOW

METER

E

RWAS-2

M

FLOW

METER

E

M

FLOW

METER

E

M

FLOW

METER

ARP-2

M

FLOW

METER

RAS/WAS

SUCTION

(FROM

CLARIFIER 1)

RECYCLE/RAS

DISCHARGE

(RAS FROM

CLARIFIER 1

RECYCLE FROM

BASIN 1B (1OX1a))

RECYCLE

SUCTION

(FROM BASIN 1A

(1OX1b))

(NOT USED)

WAS DISCHARGE

RECYCLE

SUCTION

(FROM BASIN 2A

(2OX1b))

(NOT USED)

RECYCLE/RAS

DISCHARGE

(RAS FROM

CLARIFIER 2

RECYCLE FROM

BASIN 2B

(2OX1a))

RAS/WAS

SUCTION

(FROM

CLARFIER 2)

NORTH BUILDING SOLIDS SCHEMATIC FOR ANOXIC-OXIC-ANOXIC-OXIC (AOAO) PROCESS

A

B

CD EF

G

WAS/SCUM FROM

NORTH BUILDING/

CLARIFIERS

TO WINTER

SOLIDS STORAGE

FROM WINTER

SOLIDS STORAGE

SOLIDS

HOLDING

TANK

M

FLOW

METER

M

FLOW

METER

CENTRIFUGE-1

CENTRIFUGE-2

GRINDER

CENTRIFUGE

FEED PUMP-1

CENTRIFUGE

FEED PUMP-2

VENT

VENT

CONVEYOR-2

CONVEYOR-1

TRUCK

LOADING

CONVEYOR

TRUCK BAY

DRAIN

TO EQ BASIN

NPW POLY

SOLIDS DEWATERING SCHEMATIC

TO SOLIDS HOLDING

INLINE

FLITER

SAND

FILTER-1

RE-AERATION

COLUMN-1

UV-1 M

FLOW

METER

TO OUTFALL

FILTER FEED FROM

CLARIFIER NO. 1 M

SAND

FILTER-2

SAND

FILTER-3

INLINE

FLITER

FILTER FEED FROM

CLARIFIER NO. 2 N RE-AERATION

COLUMN-2

TO NORTH

BUILDING SUMP

UV-2

COMPOSITE

SAMPLER

TERTIARY TREATMENT

VENT

THRU

ROOF

BIOSOLIDS

TANK-1

VENT

THRU

ROOF

2 1/2" Ø

WAS/SCUM FROM

NORTH BUILDING/

CLARIFIERS

WAS/SCUM TO

CENTRIFUGE

FEED PUMP

PUMP TO MANHOLE SMH-1

PROPOSED WINTER SOLIDS BUILDING

P

R

R

S

S

TSS

AIT

NTU

AIT

NO3

AIT

pH

AIT

pH

AIT

NTU

AIT

DO

AIT

NH3

AIT

NO3

AIT

OP

AIT

MeOH

MeOH

MeOH

RECYCLE

SUCTION

(FROM BASIN 1B

(1OX1e))

J

RECYCLE/RAS

DISCHARGE

(TO BASIN 1B

(1OX1c))

(NOT USED)

H

RECYCLE/RAS

DISCHARGE

(TO BASIN 2B

(2OX1c))

(NOT USED)

L

RECYCLE

SUCTION

(FROM BASIN 2B

(2OX1e))

K

ARP-3

(BACKUP)

M

FLOW

METER

NC

NC

NC

NC

NC

NC

NC

NC

NC

NC

NC

NC

TO PROCESS BASINS

FI

LT

ER

BY

PA

SS

CHECK

VALVE

SUMP PUMP

SP-1

WINTER SOLIDS

PUMP-2

WINTER SOLIDS

PUMP-1

BIOSOLIDS

TANK-2

KEYNOTES - GENERAL

# DESCRIPTION

G01 BID OPTION 1, PROVIDE NEW CENTRIFUGES (O3-CEN-1 &

03-CEN-2), SOLIDS CONVEYORS (03-CNV-1, 03-CNV-2, & 03-CNVT-1),

POLYMER MAKEUP UNITS (03-CPB-1 & 03-CPB-2), AND PIPING. THE

BASE BID EXCLUDES REPLACEMENT OF THIS EQUIPMENT.

GXX

G01

GENERAL NOTE

1. SEE SPECIFICATION SECTION 01 27 00 FOR DESCRIPTION OF

BID OPTIONS.

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

PROCESS FLOW

DIAGRAMS

186787

14 235

CLR

KSP

DJG

06/13/23 MOUNT RUSHMORE NATIONAL MONUMENT

272051 00-

D004

FINAL CONSTRUCTION DOCUMENTS

MicroC

Inline Mixer

Delete valves

Delete filters