This addendum modifies specifications for a wastewater treatment plant project. Key changes include allowing recycled asphalt product up to 15% in paving mixtures. Mixer specifications are altered, with equipment tags and counts updated. Aeration requirements are adjusted for various basins. Centrifuge performance guarantees are specified, including cake solids, polymer use, and solids capture rates. Sample pumps are removed from instrumentation drawings. A process flow diagram drawing is modified as indicated in an attached sketch.

The addendum relates to the National Park Service solicitation for wastewater treatment plant upgrades at MORU 272051. Project specifications and drawings are revised through this addendum prior to the agency seeking bids.

View the file

Other files

File Type Posted
Amendment_08_Questions_and_Answers_0008.pdf PDF
Sol_140P2023R0125_Amd_0008.pdf PDF
Addendum_Items_20230828_-_Attachment_00-D004_0008.pdf PDF
Addendum_20230905_0008.pdf PDF
Attachment_00-D004_0007.pdf PDF
Addendum_Items_0007.pdf PDF
Sol_140P2023R0125_Amd_0007.pdf PDF
Questions_and_Answers_for_Solicitation_140P2023R0125_0007.pdf PDF
MORU_CD_Volume_4_0006.pdf PDF
MORU_CD_Volume_1_0006.pdf PDF
MORU_CD_Volume_3_0006.pdf PDF
MORU_CD_Volume_2_0006.pdf PDF
Sol_140P2023R0125_Amd_0006.pdf PDF
MORU_Prebid_Sign_in_Sheet_0006.pdf PDF
Sol_140P2023R0125_Amd_0005.pdf PDF
Amendment_05_Attachment_5_VOLUME_3__South_Bldg__COMPLETE_0005.pdf PDF
Amendment_04_Attachment_12a_Fillable_B08_Solit_PSP_Vol_II_LmtOnSubcontracting_REQD_0004.xlsx XLSX spreadsheet
Amendment_04_Attachment_2a_Specification_Water_Treatment_Plant_Expansion_Project_Manual_-_Volume_2_-_6-12-23_0004.pdf PDF
Amendment_04_Attachment_13_Wage_Detemination_0004.pdf PDF
Amendment_04_Attachment_12_Fillable_-_ContractPriceSchedule_23_6_13_CD_0004.xlsx XLSX spreadsheet
Amendment_04_Attachment_4_VOLUME_2__North_Bldg__COMPLETE_0004.pdf PDF
Amendment_04_Attachment_7_STATEMENT_OF_STRUCTURAL_TESTS_AND_SPECIAL_INSPECTIONS_0004.pdf PDF
Amendment_04_Attachment_2_Specification_Water_Treatment_Plant_Expansion_Project_Manual_-_Volume_1_-_6-12-23_Rev1_0004.pdf PDF
Amendment_04_Attachment_9_Closeout-OperationMaintenance-Requirements_0004.pdf PDF
Amendment_04_Attachment_5_VOLUME_3__South_Bldg__COMPLETE_0004.pdf PDF
Amendment_04_Attachment_10_Bid_Bond__VOL-1-24-16e_0004.pdf PDF
Amendment_04_Attachment_6_VOLUME_4__Series_04-09__COMPLETE_0004.pdf PDF
Amendment_04_Attachment_11_PSP_VOL_1_0004.pdf PDF
Amendment_04_Attachment_8_Geotechnical_Report_0004.pdf PDF
Amendment_04_Attachment_1_SF-1442_and_Clauses_0004.pdf PDF
Amendment_04_Attachment_3_VOLUME_1_Series_00-01__General__Civil_0004.pdf PDF
Amendment_04_Attachment_11a_PSP_VOL_2_0004.pdf PDF
Sol_140P2023R0125_Amd_0004.pdf PDF
Amendment_03_MORU_Water_Treatment_Plant_Expansion_Project_Manual_-_Volume_1_-_6-12-23_Rev1_0003.pdf PDF
MORU_Water_Treatment_Plant_Expansion_Project_Manual_-_Volume_1_-_6-12-23_Rev1_0003.pdf PDF
MORU_Water_Treatment_Plant_Expansion_Project_Manual_-_Volume_2_-_6-12-23_0003.pdf PDF
Amendment_03_MORU_Water_Treatment_Plant_Expansion_Project_Manual_-_Volume_2_-_6-12-23_0003.pdf PDF
Sol_140P2023R0125_Amd_0003.pdf PDF
Sol_140P2023R0125_Amd_0002.pdf PDF
Amendment_02_MORU_MAP_0002.pdf PDF
Amendment_02_MORU_WWTP_PREBID_INSTRUCTIONS_0002.pdf PDF
Sol_140P2023R0125_Amd_0001.pdf PDF
B08__WWTP_SOLICITATION_140P2023R0125_7_24_23_0001.pdf PDF
Attachment_2_VOLUME_1_Series_00-01__General__Civil.pdf PDF
Attachment_7_MORUGeotechnical_Report.pdf PDF
Attachment_6_STATEMENT_OF_STRUCTURAL_TESTS_AND_SPECIAL_INSPECTIONS.pdf PDF
Attachment_9a_Bid_Bond__VOL-1-24-16e.pdf PDF
Attachment_3_VOLUME_2__North_Bldg__COMPLETE.pdf PDF
Sol_140P2023R0125.pdf PDF
Attachment_10a_Fillable_-_ContractPriceSchedule_23_6_13_CD.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number HDR Client Name Issue Date

Engineering Master Specifications Library Deliverable Type

ADDENDUM FORM

00 91 13 - 1 ENGINEERING MASTER

CHANGES TO SPECIFICATIONS

#.# Section 03 11 13 – Formwork: Delete Paragraph 3.2.F. Straight forms are not allowed for circular clarifier walls.

#.# Section 32 12 16 – Asphaltic Concrete Vehicular Paving: Add Paragraph 2.2.B “Recycled Asphalt

Product (RAP) may be utilized up to 15% of the total weight of the mixture.”

#.# Section 32 12 16 – Asphaltic Concrete Vehicular Paving: Delete Paragraph 3.1.C., prime coat is not required.

#.# Section 41 12 13 – Conveyors – Screw: Under paragraph 2.1.A.1. add “Spirac”.

#.# Section 43 41 43 – Polyethylene Chemical Tanks: Under paragraph 2.1.A. add “Assmann”.

#.# Section 46 13 01 – Fiberglass Covers – Dome Type: Under paragraph 2.1.A. add “Midwestern

Fabricators”.

#.# Section 46 33 33 – Liquid Polymer Feed Equipment: Under paragraph 2.1.A.1. add “VeloDyne”.

#.# Section 46 41 00 – Mixers: Under paragraph 2.1.A. add “Sulzer”.

#.# Section 46 41 00 – Mixers: In Paragraph 2.3.A. delete “Anoxic and Oxic Basin mixers (16 total units)” and replace with “Anoxic, Oxic, and Equalization Basin mixers (17 total)”.

#.# Section 46 41 00 – Mixers: In Paragraph 2.3.A.1. delete equipment tags and replace with “(04-

ABMX-1A1, 04-ABMX-2A1, 05-ABMX-1B4, and 05-ABMX-2B4)”.

#.# Section 46 41 00 – Mixers: In Paragraph 2.3.A.2. delete equipment tags and replace with “(04-

ABMX-1A2, 04-ABMX-1A3, 04-ABMX-2A2, 04-ABMX-2A3, 05-ABMX-1B1, 05-ABMX-1B2,

05-ABMX-1B3, 05-ABMX-1B5, 05-ABMX-2B1, 05-ABMX-2B2, 05-ABMX-2B3, and 05-

ABMX-2B5)”.

#.# Section 46 41 00 – Mixers: Delete Paragraph 2.3.A.3. and replace with:

“Equalization Mixers (03-EQMX-1)

a. Mixer Unit: TR30-1.89-8/8

b. Mast/Rail: AVU60 mast/rail”.

#.# Section 46 41 00 – Mixers: In Paragraph 2.3.A.5. delete “& OX2”.

#.# Section 46 41 00 – Mixers: In Paragraph 2.3.A.6. delete “OX1” and replace with “Oxic”.

#.# Section 46 41 00 – Mixers: In Paragraph 2.3.A.8. delete “& OX2”.

#.# Section 46 41 00 – Mixers: In Paragraph 2.3.A.9. delete “OX1” and replace with “Oxic”.

#.# Section 46 43 24 – Spiral Scraper Circular Secondary Clarifier Equipment: Add Paragraph

1.1.A.1.b. “Bridge Supported”.

#.# Section 46 43 24 – Spiral Scraper Circular Secondary Clarifier Equipment: Delete Paragraph

1.3.A.3. NACE inspection is not required.

#.# Section 46 43 24 – Spiral Scraper Circular Secondary Clarifier Equipment: Delete Paragraph 1.3.B

“Independent Design Evaluation of Drive”.

ADDENDUM FORM

00 91 13 - 2 ENGINEERING MASTER

#.# Section 46 43 24 – Spiral Scraper Circular Secondary Clarifier Equipment: Delete Paragraph 2.3.A and Replace with “Bridge: 316 Stainless Steel”.

#.# Section 46 43 24 – Spiral Scraper Circular Secondary Clarifier Equipment: Delete Paragraph 2.3.Y.

Weirs and baffles are specified in Section 06 85 14.

#.# Section 46 43 24 – Spiral Scraper Circular Secondary Clarifier Equipment: Delete Paragraph 2.4.C

“Center Pier” and Paragraph 2.4.E. “Center Drive Cage”. These items do not apply as the mechanism is bridge supported and will utilize a worm gear.

#.# Section 46 51 21 – Aeration System – Course Bubble Type: In Paragraph 1.3.B.1, delete

“Equalization (EQ)”.

#.# Section 46 51 21 – Aeration System – Course Bubble Type: Delete Paragraphs 1.3.B.1.a, 1.3.B.1.b., and 1.3.B.1.c.

#.# Section 46 51 21 – Aeration System – Course Bubble Type: In Paragraph 1.3.B.1.g, delete “300 scfm” and replace with “42 scfm”.

#.# Section 46 51 21 – Aeration System – Course Bubble Type: In Paragraph 1.5.A.1.f.1.b., delete “10 ft SWD” and replace with “11.5 ft SWD”.

#.# Section 46 51 21 – Aeration System – Course Bubble Type: In Paragraph 1.5.A.1.f.1.c., delete “30 scfm/kcf” and replace with “15 scfm/kcf”.

#.# Section 46 51 21 – Aeration System – Course Bubble Type: In Paragraph 1.5.A.1.f.1.e., delete “85 scfm” and replace with “42 scfm”.

#.# Section 46 51 21 – Aeration System – Course Bubble Type: In Paragraph 1.6.A.4.f., delete “12 supports” and replace with “3 supports”.

#.# Section 46 51 32 – Flexible Membrane Diffusers: After Paragraphs 2.3.A.4., add “and installed”.

#.# Section 46 51 32 – Flexible Membrane Diffusers: After Paragraphs 2.3.A.4.a. and 2.3.A.4.b, add

“as required based on manufacturer design calculations”.

#.# Section 46 51 32 – Flexible Membrane Diffusers: Delete Paragraph 2.3.A.5.

#.# Section 46 51 32 – Flexible Membrane Diffusers: Delete Paragraph 2.3.A.6. and table, Replace with the following paragraph and table: “Maximum airflow per basin (each train): 680 scfm. Total airflow both trains: 1,360 scfm”.

Basin 1AX1a 1AX1b 1OX1a 1OX1b 1OX1c 1OX1d 1OX1e 1AX2 1OX2

Depth 16 16 16 16 16 16 16 16 16

Length 5 4.75 13.25 25 7 22.75 8 9.75 11

Width 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5

Volume, cu ft 440 418 1,166 2,200 616 2,002 704 858 968

Peak Air Flow, scfm - 95 95 150 40 120 30 75 75

#.# Section 46 53 44 – Vertical Upflow Continuous Backwash Sand Filter: Add paragraph 1.1.A.2.e.

“Access platform extending from building second level over both new filters”.

ADDENDUM FORM

00 91 13 - 3 ENGINEERING MASTER

#.# Section 46 53 44 – Vertical Upflow Continuous Backwash Sand Filter: Add paragraph 2.2.D.8.f.

“Access Platform: Aluminum”.

#.# Section 46 53 44 – Vertical Upflow Continuous Backwash Sand Filter: Delete paragraph 2.3.B.1.c.

#.# Section 46 76 33 – Centrifuges: At the end of Paragraph 1.6.A. add “equivalent to or greater than the current operating equipment”.

#.# Section 46 76 33 – Centrifuges: Delete the Table in Paragraph 1.6.B. and replace with the following table:

Characteristic Range Value Used for Performance

Acceptance

Schedule 5 days/week, 3-8hrs/day 5 days/week, 3-8hrs/day

Feed Solids Concentration (%T.S.) 0.4 – 1.0% 0.4 – 1.0%

Individual Centrifuge Solids

Loading Rate 40-60 lbs/hr

Hydraulic loading rate

15-25 GPM 20 GPM

Total Volatile Solids (% T.V.S.) Max 65% pH 6.0 – 7.5

#.# Section 46 76 33 – Centrifuges: Delete Paragraph 1.6.C. and replace with “The CENTRIFUGE

MANUFACTURER shall meet a guaranteed centrifuge performance equal to or greater than current centrifuge performance based lab testing results and/or existing centrifuge historical performance.”

Parameter Performance Guarantee

Cake Solids Equal to or Greater than 21.0% TS

Active Polymer

Use

Equal to or Less than 20 lbs/dry ton

Solids Capture Equal to or Greater than 95.0%

#.# Section 46 76 33 – Centrifuges: In paragraph 2.3.B.1. Change “3 IN” to “1.5 IN”. In paragraph

2.3.B.2. Change “Flanged” to “Feed pipe”.

#.# Section 46 76 33 – Centrifuges: In paragraph 2.3.C.1.a.1) Change “3,250 rpm” to “4,250 rpm”.

#.# Section 46 76 33 – Centrifuges: In paragraph 2.3.C.2.a. Change “4.5:1” to “4.0:1”.

#.# Section 46 76 33 – Centrifuges: In paragraph 2.3.C.3.a. Change “20” to “10”.

#.# Section 46 76 33 – Centrifuges: In paragraph 2.3.C.4.a. Add “Maximum”.

#.# Section 46 76 33 – Centrifuges: In paragraph 2.3.C.6. Change “3,250” to “5,000”.

#.# Section 46 76 33 – Centrifuges: At the end of paragraph 3.5.A. Add “the manufacturer will conduct performance testing to demonstrate acceptable process performance as specified in section 1.6 above.”.

#.# Section 46 76 33 – Centrifuges: Delete Paragraph 3.5.G. and 3.5.H.4. including reimbursement calculations.

ADDENDUM FORM

00 91 13 - 4 ENGINEERING MASTER

CHANGES TO DRAWINGS

#.# Drawing 00-D004, Process Flow Diagrams: Modify the Drawing as shown and indicated on attached Sketch.

#.# Drawing 09-Y612, Instrumentation P&ID – Sand Filters and Reaeration Column: Delete Sample

Pumps (02-SAP-1, 02-SAP-2, 02-SAP-3, and 02-SAP-4) and Control Panels (CP 02-SAP-1 and CP

02-SAP-2).

ATTACHMENTS

The items listed below and bound following this document’s “End of Addendum” designation, are part of this Addendum.

#.# Drawings attachments hereto are as follows:

• Markups to Drawing 00-D004 – Process Flow Diagrams.

File details come from the government source that posted it. Updated .