Addendum_Items_0007.pdf
PDF 206 KB Posted
- Attached to
- MORU 272051 WWTP Solicitation
- Solicitation number
- 140P2023R0125
About this file
This addendum document provides revisions to specifications and drawings for a wastewater treatment plant project. Key changes include replacing equipment manufacturers in various sections, deleting requirements for forms, coatings and inspections, revising equipment details and performance parameters, and modifying a process flow diagram. The related federal contract opportunity is a solicitation from the Department of the Interior National Park Service for the MORU 272051 WWTP project.
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number HDR Client Name Issue Date Engineering Master Specifications Library Deliverable Type
ADDENDUM FORM
00 91 13 - 1 ENGINEERING MASTER
CHANGES TO SPECIFICATIONS
#.# Section 03 11 13 – Formwork: Delete Paragraph 3.2.F. Straight forms are not allowed for circular clarifier walls.
#.# Section 32 12 16 – Asphaltic Concrete Vehicular Paving: Add Paragraph 2.2.B “Recycled Asphalt
Product (RAP) may be utilized up to 15% of the total weight of the mixture.”
#.# Section 32 12 16 – Asphaltic Concrete Vehicular Paving: Delete Paragraph 3.1.C., prime coat is not required.
#.# Section 41 12 13 – Conveyors – Screw: Under paragraph 2.1.A.1. add “Spirac”.
#.# Section 43 41 43 – Polyethylene Chemical Tanks: Under paragraph 2.1.A. add “Assmann”.
#.# Section 46 13 01 – Fiberglass Covers – Dome Type: Under paragraph 2.1.A. add “Midwestern
Fabricators”.
#.# Section 46 33 33 – Liquid Polymer Feed Equipment: Under paragraph 2.1.A.1. add “VeloDyne”.
#.# Section 46 41 00 – Mixers: Under paragraph 2.1.A. add “Sulzer”.
#.# Section 46 41 00 – Mixers: In Paragraph 2.3.A. delete “Anoxic and Oxic Basin mixers (16 total units)” and replace with “Anoxic, Oxic, and Equalization Basin mixers (17 total)”.
#.# Section 46 41 00 – Mixers: In Paragraph 2.3.A.1. delete equipment tags and replace with “(04-
ABMX-1A1, 04-ABMX-2A1, 05-ABMX-1B4, and 05-ABMX-2B4)”.
#.# Section 46 41 00 – Mixers: In Paragraph 2.3.A.2. delete equipment tags and replace with “(04-
ABMX-1A2, 04-ABMX-1A3, 04-ABMX-2A2, 04-ABMX-2A3, 05-ABMX-1B1, 05-ABMX-1B2,
05-ABMX-1B3, 05-ABMX-1B5, 05-ABMX-2B1, 05-ABMX-2B2, 05-ABMX-2B3, and 05-
ABMX-2B5)”.
#.# Section 46 41 00 – Mixers: Delete Paragraph 2.3.A.3. and replace with:
“Equalization Mixers (03-EQMX-1)
a. Mixer Unit: TR30-1.89-8/8
b. Mast/Rail: AVU60 mast/rail”.
#.# Section 46 41 00 – Mixers: In Paragraph 2.3.A.5. delete “& OX2”.
#.# Section 46 41 00 – Mixers: In Paragraph 2.3.A.6. delete “OX1” and replace with “Oxic”.
#.# Section 46 41 00 – Mixers: In Paragraph 2.3.A.8. delete “& OX2”.
#.# Section 46 41 00 – Mixers: In Paragraph 2.3.A.9. delete “OX1” and replace with “Oxic”.
#.# Section 46 43 24 – Spiral Scraper Circular Secondary Clarifier Equipment: Add Paragraph
1.1.A.1.b. “Bridge Supported”.
#.# Section 46 43 24 – Spiral Scraper Circular Secondary Clarifier Equipment: Delete Paragraph
1.3.A.3. NACE inspection is not required.
#.# Section 46 43 24 – Spiral Scraper Circular Secondary Clarifier Equipment: Delete Paragraph 1.3.B
“Independent Design Evaluation of Drive”.
ADDENDUM FORM
00 91 13 - 2 ENGINEERING MASTER
#.# Section 46 43 24 – Spiral Scraper Circular Secondary Clarifier Equipment: Delete Paragraph 2.3.A and Replace with “Bridge: 316 Stainless Steel”.
#.# Section 46 43 24 – Spiral Scraper Circular Secondary Clarifier Equipment: Delete Paragraph 2.3.Y.
Weirs and baffles are specified in Section 06 85 14.
#.# Section 46 43 24 – Spiral Scraper Circular Secondary Clarifier Equipment: Delete Paragraph 2.4.C
“Center Pier” and Paragraph 2.4.E. “Center Drive Cage”. These items do not apply as the mechanism is bridge supported and will utilize a worm gear.
#.# Section 46 51 21 – Aeration System – Course Bubble Type: In Paragraph 1.3.B.1, delete
“Equalization (EQ)”.
#.# Section 46 51 21 – Aeration System – Course Bubble Type: Delete Paragraphs 1.3.B.1.a, 1.3.B.1.b., and 1.3.B.1.c.
#.# Section 46 51 21 – Aeration System – Course Bubble Type: In Paragraph 1.3.B.1.g, delete “300 scfm” and replace with “42 scfm”.
#.# Section 46 51 21 – Aeration System – Course Bubble Type: In Paragraph 1.5.A.1.f.1.b., delete “10 ft SWD” and replace with “11.5 ft SWD”.
#.# Section 46 51 21 – Aeration System – Course Bubble Type: In Paragraph 1.5.A.1.f.1.c., delete “30 scfm/kcf” and replace with “15 scfm/kcf”.
#.# Section 46 51 21 – Aeration System – Course Bubble Type: In Paragraph 1.5.A.1.f.1.e., delete “85 scfm” and replace with “42 scfm”.
#.# Section 46 51 21 – Aeration System – Course Bubble Type: In Paragraph 1.6.A.4.f., delete “12 supports” and replace with “3 supports”.
#.# Section 46 51 32 – Flexible Membrane Diffusers: After Paragraphs 2.3.A.4., add “and installed”.
#.# Section 46 51 32 – Flexible Membrane Diffusers: After Paragraphs 2.3.A.4.a. and 2.3.A.4.b, add
“as required based on manufacturer design calculations”.
#.# Section 46 51 32 – Flexible Membrane Diffusers: Delete Paragraph 2.3.A.5.
#.# Section 46 51 32 – Flexible Membrane Diffusers: Delete Paragraph 2.3.A.6. and table, Replace with the following paragraph and table: “Maximum airflow per basin (each train): 680 scfm. Total airflow both trains: 1,360 scfm”.
Basin 1AX1a 1AX1b 1OX1a 1OX1b 1OX1c 1OX1d 1OX1e 1AX2 1OX2 Depth 16 16 16 16 16 16 16 16 16 Length 5 4.75 13.25 25 7 22.75 8 9.75 11 Width 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 Volume, cu ft 440 418 1,166 2,200 616 2,002 704 858 968 Peak Air Flow, scfm - 95 95 150 40 120 30 75 75
#.# Section 46 53 44 – Vertical Upflow Continuous Backwash Sand Filter: Add paragraph 1.1.A.2.e.
“Access platform extending from building second level over both new filters”.
ADDENDUM FORM
00 91 13 - 3 ENGINEERING MASTER
#.# Section 46 53 44 – Vertical Upflow Continuous Backwash Sand Filter: Add paragraph 2.2.D.8.f.
“Access Platform: Aluminum”.
#.# Section 46 53 44 – Vertical Upflow Continuous Backwash Sand Filter: Delete paragraph 2.3.B.1.c.
#.# Section 46 76 33 – Centrifuges: At the end of Paragraph 1.6.A. add “equivalent to or greater than the current operating equipment”.
#.# Section 46 76 33 – Centrifuges: Delete the Table in Paragraph 1.6.B. and replace with the following table:
Characteristic Range Value Used for Performance Acceptance
Schedule 5 days/week, 3-8hrs/day 5 days/week, 3-8hrs/day Feed Solids Concentration (%T.S.) 0.4 – 1.0% 0.4 – 1.0% Individual Centrifuge Solids Loading Rate 40-60 lbs/hr
Hydraulic loading rate 15-25 GPM 20 GPM
Total Volatile Solids (% T.V.S.) Max 65% pH 6.0 – 7.5
#.# Section 46 76 33 – Centrifuges: Delete Paragraph 1.6.C. and replace with “The CENTRIFUGE
MANUFACTURER shall meet a guaranteed centrifuge performance equal to or greater than current centrifuge performance based lab testing results and/or existing centrifuge historical performance.”
Parameter Performance Guarantee
Cake Solids Equal to or Greater than 21.0% TS Active Polymer Use
Equal to or Less than 20 lbs/dry ton
Solids Capture Equal to or Greater than 95.0%
#.# Section 46 76 33 – Centrifuges: In paragraph 2.3.B.1. Change “3 IN” to “1.5 IN”. In paragraph
2.3.B.2. Change “Flanged” to “Feed pipe”.
#.# Section 46 76 33 – Centrifuges: In paragraph 2.3.C.1.a.1) Change “3,250 rpm” to “4,250 rpm”.
#.# Section 46 76 33 – Centrifuges: In paragraph 2.3.C.2.a. Change “4.5:1” to “4.0:1”.
#.# Section 46 76 33 – Centrifuges: In paragraph 2.3.C.3.a. Change “20” to “10”.
#.# Section 46 76 33 – Centrifuges: In paragraph 2.3.C.4.a. Add “Maximum”.
#.# Section 46 76 33 – Centrifuges: In paragraph 2.3.C.6. Change “3,250” to “5,000”.
#.# Section 46 76 33 – Centrifuges: At the end of paragraph 3.5.A. Add “the manufacturer will conduct performance testing to demonstrate acceptable process performance as specified in section 1.6 above.”.
#.# Section 46 76 33 – Centrifuges: Delete Paragraph 3.5.G. and 3.5.H.4. including reimbursement calculations.
ADDENDUM FORM
00 91 13 - 4 ENGINEERING MASTER
CHANGES TO DRAWINGS
#.# Drawing 00-D004, Process Flow Diagrams: Modify the Drawing as shown and indicated on attached Sketch.
#.# Drawing 09-Y612, Instrumentation P&ID – Sand Filters and Reaeration Column: Delete Sample
Pumps (02-SAP-1, 02-SAP-2, 02-SAP-3, and 02-SAP-4) and Control Panels (CP 02-SAP-1 and CP
02-SAP-2).
ATTACHMENTS
The items listed below and bound following this document’s “End of Addendum” designation, are part of this Addendum.
#.# Drawings attachments hereto are as follows:
• Markups to Drawing 00-D004 – Process Flow Diagrams.
| CHANGES TO SPECIFICATIONS |
| CHANGES TO DRAWINGS |
| ATTACHMENTS |