This document is a process flow diagram for a wastewater treatment plant. It details the piping and instrumentation diagram for the treatment process, which utilizes an anoxic-oxic-anoxic-oxic process. It shows the flow of water through clarifiers, filters, re-aeration columns and ultraviolet disinfection equipment. The solids handling process includes pumping sludge to a centrifuge for dewatering. Biogas from the process is vented through the roof. The related solicitation is for the Mount Rushmore National Monument Wastewater Treatment Plant and has a solicitation number of 140P2023R0125 issued by the National Park Service within the Department of the Interior.

View the file

Other files

File Type Posted
Amendment_08_Questions_and_Answers_0008.pdf PDF
Sol_140P2023R0125_Amd_0008.pdf PDF
Addendum_Items_20230828_0008.pdf PDF
Addendum_Items_20230828_-_Attachment_00-D004_0008.pdf PDF
Addendum_20230905_0008.pdf PDF
Addendum_Items_0007.pdf PDF
Sol_140P2023R0125_Amd_0007.pdf PDF
Questions_and_Answers_for_Solicitation_140P2023R0125_0007.pdf PDF
MORU_CD_Volume_4_0006.pdf PDF
MORU_CD_Volume_1_0006.pdf PDF
MORU_CD_Volume_3_0006.pdf PDF
MORU_CD_Volume_2_0006.pdf PDF
Sol_140P2023R0125_Amd_0006.pdf PDF
MORU_Prebid_Sign_in_Sheet_0006.pdf PDF
Sol_140P2023R0125_Amd_0005.pdf PDF
Amendment_05_Attachment_5_VOLUME_3__South_Bldg__COMPLETE_0005.pdf PDF
Amendment_04_Attachment_12a_Fillable_B08_Solit_PSP_Vol_II_LmtOnSubcontracting_REQD_0004.xlsx XLSX spreadsheet
Amendment_04_Attachment_2a_Specification_Water_Treatment_Plant_Expansion_Project_Manual_-_Volume_2_-_6-12-23_0004.pdf PDF
Amendment_04_Attachment_13_Wage_Detemination_0004.pdf PDF
Amendment_04_Attachment_12_Fillable_-_ContractPriceSchedule_23_6_13_CD_0004.xlsx XLSX spreadsheet
Amendment_04_Attachment_4_VOLUME_2__North_Bldg__COMPLETE_0004.pdf PDF
Amendment_04_Attachment_7_STATEMENT_OF_STRUCTURAL_TESTS_AND_SPECIAL_INSPECTIONS_0004.pdf PDF
Amendment_04_Attachment_2_Specification_Water_Treatment_Plant_Expansion_Project_Manual_-_Volume_1_-_6-12-23_Rev1_0004.pdf PDF
Amendment_04_Attachment_9_Closeout-OperationMaintenance-Requirements_0004.pdf PDF
Amendment_04_Attachment_5_VOLUME_3__South_Bldg__COMPLETE_0004.pdf PDF
Amendment_04_Attachment_10_Bid_Bond__VOL-1-24-16e_0004.pdf PDF
Amendment_04_Attachment_6_VOLUME_4__Series_04-09__COMPLETE_0004.pdf PDF
Amendment_04_Attachment_11_PSP_VOL_1_0004.pdf PDF
Amendment_04_Attachment_8_Geotechnical_Report_0004.pdf PDF
Amendment_04_Attachment_1_SF-1442_and_Clauses_0004.pdf PDF
Amendment_04_Attachment_3_VOLUME_1_Series_00-01__General__Civil_0004.pdf PDF
Amendment_04_Attachment_11a_PSP_VOL_2_0004.pdf PDF
Sol_140P2023R0125_Amd_0004.pdf PDF
Amendment_03_MORU_Water_Treatment_Plant_Expansion_Project_Manual_-_Volume_1_-_6-12-23_Rev1_0003.pdf PDF
MORU_Water_Treatment_Plant_Expansion_Project_Manual_-_Volume_1_-_6-12-23_Rev1_0003.pdf PDF
MORU_Water_Treatment_Plant_Expansion_Project_Manual_-_Volume_2_-_6-12-23_0003.pdf PDF
Amendment_03_MORU_Water_Treatment_Plant_Expansion_Project_Manual_-_Volume_2_-_6-12-23_0003.pdf PDF
Sol_140P2023R0125_Amd_0003.pdf PDF
Sol_140P2023R0125_Amd_0002.pdf PDF
Amendment_02_MORU_MAP_0002.pdf PDF
Amendment_02_MORU_WWTP_PREBID_INSTRUCTIONS_0002.pdf PDF
Sol_140P2023R0125_Amd_0001.pdf PDF
B08__WWTP_SOLICITATION_140P2023R0125_7_24_23_0001.pdf PDF
Attachment_2_VOLUME_1_Series_00-01__General__Civil.pdf PDF
Attachment_7_MORUGeotechnical_Report.pdf PDF
Attachment_6_STATEMENT_OF_STRUCTURAL_TESTS_AND_SPECIAL_INSPECTIONS.pdf PDF
Attachment_9a_Bid_Bond__VOL-1-24-16e.pdf PDF
Attachment_3_VOLUME_2__North_Bldg__COMPLETE.pdf PDF
Sol_140P2023R0125.pdf PDF
Attachment_10a_Fillable_-_ContractPriceSchedule_23_6_13_CD.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RWAS-1

ARP-1

M

FLOW

METER

E

M

FLOW

METER

E

RWAS-2

M

FLOW

METER

E

M

FLOW

METER

E

M

FLOW

METER

ARP-2

M

FLOW

METER

RAS/WAS

SUCTION

(FROM

CLARIFIER 1)

RECYCLE/RAS

DISCHARGE

(RAS FROM

CLARIFIER 1

RECYCLE FROM

BASIN 1B (1OX1a))

RECYCLE

SUCTION

(FROM BASIN 1A

(1OX1b))

(NOT USED)

WAS DISCHARGE

RECYCLE

SUCTION

(FROM BASIN 2A

(2OX1b))

(NOT USED)

RECYCLE/RAS

DISCHARGE

(RAS FROM

CLARIFIER 2

RECYCLE FROM

BASIN 2B

(2OX1a))

RAS/WAS

SUCTION

(FROM

CLARFIER 2)

NORTH BUILDING SOLIDS SCHEMATIC FOR ANOXIC-OXIC-ANOXIC-OXIC (AOAO) PROCESS

A

B

CD EF

G

WAS/SCUM FROM

NORTH BUILDING/

CLARIFIERS

TO WINTER

SOLIDS STORAGE

FROM WINTER

SOLIDS STORAGE

SOLIDS

HOLDING

TANK

M

FLOW

METER

M

FLOW

METER

CENTRIFUGE-1

CENTRIFUGE-2

GRINDER

CENTRIFUGE

FEED PUMP-1

CENTRIFUGE

FEED PUMP-2

VENT

VENT

CONVEYOR-2

CONVEYOR-1

TRUCK

LOADING

CONVEYOR

TRUCK BAY

DRAIN

TO EQ BASIN

NPW POLY

SOLIDS DEWATERING SCHEMATIC

TO SOLIDS HOLDING

INLINE

FLITER

SAND

FILTER-1

RE-AERATION

COLUMN-1

UV-1 M

FLOW

METER

TO OUTFALL

FILTER FEED FROM

CLARIFIER NO. 1 M

SAND

FILTER-2

SAND

FILTER-3

INLINE

FLITER

FILTER FEED FROM

CLARIFIER NO. 2 N RE-AERATION

COLUMN-2

TO NORTH

BUILDING SUMP

UV-2

COMPOSITE

SAMPLER

TERTIARY TREATMENT

VENT

THRU

ROOF

BIOSOLIDS

TANK-1

VENT

THRU

ROOF

2 1/2" Ø

WAS/SCUM FROM

NORTH BUILDING/

CLARIFIERS

WAS/SCUM TO

CENTRIFUGE

FEED PUMP

PUMP TO MANHOLE SMH-1

PROPOSED WINTER SOLIDS BUILDING

P

R

R

S

S

TSS

AIT

NTU

AIT

NO3

AIT

pH

AIT

pH

AIT

NTU

AIT

DO

AIT

NH3

AIT

NO3

AIT

OP

AIT

MeOH

MeOH

MeOH

RECYCLE

SUCTION

(FROM BASIN 1B

(1OX1e))

J

RECYCLE/RAS

DISCHARGE

(TO BASIN 1B

(1OX1c))

(NOT USED)

H

RECYCLE/RAS

DISCHARGE

(TO BASIN 2B

(2OX1c))

(NOT USED)

L

RECYCLE

SUCTION

(FROM BASIN 2B

(2OX1e))

K

ARP-3

(BACKUP)

M

FLOW

METER

NC

NC

NC

NC

NC

NC

NC

NC

NC

NC

NC

NC

TO PROCESS BASINS

FI

LT

ER

BY

PA

SS

CHECK

VALVE

SUMP PUMP

SP-1

WINTER SOLIDS

PUMP-2

WINTER SOLIDS

PUMP-1

BIOSOLIDS

TANK-2

KEYNOTES - GENERAL

# DESCRIPTION

G01 BID OPTION 1, PROVIDE NEW CENTRIFUGES (O3-CEN-1 &

03-CEN-2), SOLIDS CONVEYORS (03-CNV-1, 03-CNV-2, & 03-CNVT-1),

POLYMER MAKEUP UNITS (03-CPB-1 & 03-CPB-2), AND PIPING. THE

BASE BID EXCLUDES REPLACEMENT OF THIS EQUIPMENT.

GXX

G01

GENERAL NOTE

1. SEE SPECIFICATION SECTION 01 27 00 FOR DESCRIPTION OF

BID OPTIONS.

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF SHEET

PROCESS FLOW

DIAGRAMS

186787

14 235

CLR

KSP

DJG

06/13/23 MOUNT RUSHMORE NATIONAL MONUMENT

272051 00-

D004

FINAL CONSTRUCTION DOCUMENTS

MicroC

Inline Mixer

Delete valves

Delete filters