GLACIER NATIONAL PARK
Bridge Preservation Project
Pre-Proposal Teleconference
GLACIER NATIONAL PARK
Bridge Preservation Project
Solicitation: 140P2021R0063
NPS PMIS #: GLAC 311336
THIS MEETING WILL BE RECORDED
MAY 6, 2021
E X P E R I E N C E Y O U R A M E R I C A
OPENING
INTRODUCTIONS
ATTENDEES - LIST WILL BE INCLUDED IN AN AMENDMENT
PURPOSE OF THE PRE-PROPOSAL CONFERENCE/VIRTUAL SITE VISIT
BRIEF OVERVIEW OF PROJECT
PROPOSAL REQUIREMENTS
SCOPE OF WORK FOR 13 BRIDGES
SCHEDULE
OPENING
This is a total small business set aside.
The self-performance requirement is a minimum of 15% labor.
The proposal due date will not be extended because of the tight construction window.
Brief Overview Scope of Services The work of this contract is for the rehabilitation and preservation of 13 existing bridges at Glacier National Park, Glacier and Flathead County, Montana.
Bridge Preservation Project overview – Category D & C Bridges Funded through FHWS (FLTP) and NPS IMR Regional Cyclic Funds General Scope of work includes:
In-water work: scour mitigation and erosion repair (gabion basket and riprap placement); Timber pile replacement and repair; Temporary stream diversion Out-of-water work: timber curb and sidewalk plank replacement; timber backwall repair; historic masonry work; approach repair; deck repair and sealing; expansion joint, bridge deck and pile cap cleaning; asphalt milling and replacement, steel rail painting; concrete repair
Flugstad, Heidi L (FHL) - Check the specs for this start date - it is the day after Labor Day 2022.
Baker, Jennifer K (BJK) - dates discussed in schedule slides and individual bridge slides
QUESTIONS AFTER PRE-PROPOSAL CONFERENCE
DIRECT ALL QUESTIONS TO: Victoria Nosal and Bruce Beck, BY E-MAIL: Victoria_nosal@nps.gov; bruce_beck@nps.gov.
ALL QUESTIONS AND ANSWERS WILL BE PROVIDED TO ALL PROSPECTIVE OFFERORS BY AMENDMENT TO THE SOLICITATION.
REQUEST FOR PROPOSAL (SOLICITATION DOCUMENT) SHALL ONLY BE CHANGED BY FORMAL AMENDMENT ISSUED BY THE CONTRACTING OFFICER AT THE WEBSITE beta.sam.gov.
Cut-off day for questions is May 14, 2021, 1200 MDT.
Site Visit is planned for May 11 – 12, 2021. Refer to slide at end of presentation for meeting times and locations.
TECHNICAL DOCUMENTS
CONSTRUCTION DRAWINGS
SPECIFICATIONS
GLAC Bridge Preservation HAZMAT Results (Amendment 1) USACE NWP permits (Amendment 1) MT DEQ 318 authorization (Amendment 1)
BASIS FOR AWARD
The Government will conduct a source selection using the Best Value Continuum Tradeoff Process defined at FAR Part 15.1. The Contracting Officer (CO) will obligate and award a contract to the offeror who submits a proposal the Source Selection Authority (SSA) determines conforms to solicitation requirements; is fair and reasonable; and provides the best value to the government considering all evaluation factors combined as detailed below.
The Government may accept other than the lowest priced proposal when the perceived benefits of a higher priced proposal merit the price differential.
Additionally, pursuant to FAR 52.215-1(f), Contract Award, contained herein:
The Government may reject any or all proposals if such action is in the Government’s interest.
The Government may waive informalities and minor irregularities in proposals received.
The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the CO later determines them to be necessary.
EVALUATION FACTORS
RELATIVE IMPORTANCE: FACTORS: Factors 1 & 2 are of equal importance and 3 -6 are listed in descending order of Importance.
Overall: All evaluation factors other than price (technical and past performance), when combined are approximately equal to price.
VOLUME I: TECHNICAL PROPOSAL – FORMAT, ORGANIZATION, CONTENTS
FORMAT: Submit one (1) electronic copy ORGANIZATION: Include a Table of Contents named as follows:
FACTOR 1 - TECHNICAL APPROACH
FACTOR 2 - SCHEDULE
FACTOR 3 - PROJECT EXPERIENCE
FACTOR 4 - KEY PERSONNEL EXPERIENCE
FACTOR 5 - SAFETY
FACTOR 6 - PAST PERFORMANCE
OTHER SUBMITTALS: PROPOSED EQUALS & HAZARDOUS MATERIALS.
Factor 1: TECHNICAL APPROACH Technical approach is your means and method to complete a technical aspect of required work in this solicitation. Submit a written narrative limited to 10 pages describing your technical approach to the specific aspects below. Additional pages will not be evaluated. Pictures can be included and will count towards the page limitation.
Approach to Critical Contract Requirements: Describe your approach to successfully accomplish work at multiple construction sites within proposed contract performance period and budget. Include approach to manage vehicle and pedestrian traffic while maintaining visitor safety and access. Describe approach to complete historic masonry work and lead abatement. Describe approach to manage work in a highly sensitive natural and cultural resource environment. Identify potential related risks or reasons for project time or cost impacts and your solutions to mitigate and resolve them.
Means & Methods: Provide a written description of approach to perform this construction project with demonstrates a clear understanding of the project and means and methods to accomplish work at multiple sites in each year of construction. Include narrative explaining means and methods to manage within the schedule, how the work will be accomplished including Quality Control and Assurance over multiple work sites with concurrent construction. Include critical issues, and strategies to manage project risks including two season construction and short construction window within the project schedule, environmental controls for resource protection, pollution and waste management, and potential weather impacts.
Roles & Responsibilities: Provide an organizational chart and narrative that demonstrates the roles and responsibilities of the proposed prime contractor key personnel and all key subcontractors. Note if the prime has worked with the key subcontractors before and length of past work relationship. Describe how the subcontractors will be managed and coordinated. Describe the approach to manage and maintain the contract’s schedule, cost, and scope. Describe how safety requirements will be incorporated into all activities. Describe how the quality control requirements will be performed to ensure the Government receives a quality project.
Technical approaches that comply with applicable contract requirements, are realistic, appropriate, and efficient, and demonstrate clear logic and scope understanding present lower levels of risk and will be more favorably rated. Approaches not demonstrating these attributes present higher levels of risk and will be less favorably rated.
Factor 2: SCHEDULE Submit your proposed construction schedule for the specific project showing completion within the required period of performance contained in this solicitation with accompanying schedule narrative. Submit your schedule in MS Project Gantt Chart format; for evaluation purposes only assume a Notice to Proceed date of August 1, 2021; and include specific activities required for this project and a clear critical path with major milestones and applicable predecessor activities. Include in schedule float dates, mobilization, close-out procedures and note long-lead items. In your accompanying narrative, explain schedule logic, critical path activities, and key considerations and constraints.
Factor 2: SCHEDULE Construction schedules and narrative descriptions documenting Clear and efficient critical path and logical sequencing;
Account for procurement lead-time, float, weather delays, close-out activities, subcontractor/trade coordination, on-site storage and staging, resource and time constraints;
Demonstrate risk mitigation and successful completion with the required period of performance present lower levels of risk and will be more favorably rated.
Schedules which do not demonstrate these attributes present higher levels of risk and will be less favorably rated.
Factor 3: PROJECT EXPERIENCE Submit the attached “Project Experience” form addressing specific experience aspects below for up to 5 relevant projects completed in the last 7 years. Submit separate forms for each project. Construction in congested areas of high public interest or public use that are similar in scope, magnitude, and complexity to this solicitation while maintaining safe public access; and minimizing visitor and public disruption.
Include narrative explaining experience with similar or specific examples for bridge rehabilitation, construction in sensitive environments and near water bodies (activities may include scour stabilization, drainage, historic masonry, concrete pavement, and asphalt pavement).
If applicable, project experience is subject to substitution requirements in Section H of this solicitation and resulting contract. Note: Submit the same projects for Key Personnel (Factor #4) as submitted under this factor.
Factor 3: PROJECT EXPERIENCE Project experience demonstrating (1) capability to successfully complete relevant projects of similar scope and magnitude to this solicitation; (2) strong technical knowledge and skill required for this solicitation; and (3) effective management, problem solving, communication, coordination, and organization present lower levels of risk and will be more favorably rated. Those not demonstrating these attributes present higher levels of risk and will be less favorably rated.
Project experience demonstrating (1) capability to successfully complete relevant projects of similar scope and magnitude to this solicitation; (2) strong technical knowledge and skill required for this solicitation; and (3) effective management, problem solving, communication, coordination, and organization present lower levels of risk and will be more favorably rated. Those not demonstrating these attributes present higher levels of risk and will be less favorably rated.
Factor 4: KEY PERSONNEL Submit resumes for key personnel as identified in Section H of this solicitation and listed below. Demonstrated capability with scheduling and quality management of multiple projects sites concurrently working under a compressed schedule. Those not demonstrating these attributes present higher levels of risk and will be less favorably rated.
| Project Manager(s) |
| Superintendent(s) |
| On-site Quality Control Specialist(s) |
| On-site Safety Specialist(s) |
Factor 4: KEY PERSONNEL, Section M Key Personnel experience demonstrating (1) capability in same or similar key personnel positions on successful relevant projects of similar scope and magnitude to this solicitation; (2) strong technical knowledge and skill required for this solicitation; and (3) effective problem solving, communication, coordination, and organization present lower levels of risk and will be more favorably rated. Those not demonstrating these attributes present higher levels of risk and will be less favorably rated.
Factor 5: SAFETY Submit an overview of your company’s Construction Safety Program including COVID and an assessment of the safety risks associated with this construction project. Discuss any changes to your company’s Construction Safety Program required to address your assessment of the project risk.
Include the names, resumes, and specific safety training completed (i.e., OSHA, etc.) for the proposed Project Site Safety Manager for this project. Additionally, submit a copy of OSHA 300A logs for the previous three calendar years along with a statement from your insurance company showing your company’s current Experience Modification Rate (EMR).
Factor 5: SAFETY Safety information (overview, risk assessment, and tailoring for this specific project) demonstrating a higher level of project understanding; risk mitigation; and qualifications and capabilities of proposed safety personnel will be more favorably rated. Fewer documented OSHA 300A incidents and lower EMR rates will be more favorably rated. Information not demonstrating these qualities and/or higher OHSA incidents and EMR rates will be less favorably rated.
Safety information (overview, risk assessment, and tailoring for this specific project) demonstrating a higher level of project understanding; risk mitigation; and qualifications and capabilities of proposed safety personnel will be more favorably rated. Fewer documented OSHA 300A incidents and lower EMR rates will be more favorably rated. Information not demonstrating these qualities and/or higher OHSA incidents and EMR rates will be less favorably rated.
Factor 6: PAST PERFORMANCE Submit Past Performance information for the same projects submitted under Project Experience (factor #3) using the attached Past Performance Questionnaire. Information may be regarding the offeror’s firm and/or its proposed subcontractors performing key trades and other construction activities. Subcontractor past performance will only be considered if it correlates to the work the subcontractor will be performing on this requirement. If available, offerors may submit a Past Performance Information Retrieval System (PPIRS) evaluation report in lieu of the Past Performance Questionnaire. Submittal process for the Past Performance Questionnaire is as follows:
Complete Sections I and II only of the attached Past Performance Questionnaire and forward to your client reference. The reference shall be some who was substantially involved with the project and can provide a complete, objective assessment of your performance. Direct them to complete and submit the survey to the address and point of contact in paragraph B above by the due date and time of proposal receipt.
Submit copies of the questionnaire that your forwarded to your references with their point of contact information in this proposal Volume I.
Submit a narrative disclosing any instances of past performance that may be considered less than full satisfactory. Describe pertinent facts, circumstances and any remedial action taken or to be taken to correct the deficiency. Failure to disclose such instances could result in an unfavorable assessment of the offeror’s past performance record.
Past performance demonstrating higher levels of success and quality on more relevant projects similar in scope and magnitude to this solicitation present lower levels of risk and will be more favorably rated. Projects that are more relevant to the requirements of this solicitation will be given more weight in the overall past performance rating. Project Experience ratings (Factor 3) will be considered in determining relevancy for projects submitted under this factor. If an offeror has no past performance on similar work relevant to this solicitation, they will be evaluated neither favorably nor unfavorably.
Past performance on contracts with the Federal Government, other public agencies, or private organizations will be considered. All submitted references may not be contacted. Sources other than submitted references may be contacted.
During proposal evaluations, exchanges between the Government and offerors may occur to clarify relevance of past performance information and/or address adverse past performance information which an offeror has not yet had an opportunity to respond to.
Evaluation of Options Except when it is determined not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of provision)
VOLUME II, BUSINESS AND PRICE PROPOSAL – Submittals in Vol II will not be rated Standard Form (SF)1442 will be reviewed for completeness Amendment Acknowledgement will be reviewed for timely and proper acknowledgement SECTION B PRICE SCHEDULE Proposed pricing will be evaluated for fair and reasonableness. Reasonableness will be determined considering comparisons to competitive pricing and to the independent cost estimate
SF 24 BID BOND
SECTION K REPRESENTATIONS AND CERTIFICATIONS
GENERAL REFERENCES
SUBCONTRACTING PERCENTAGE WORKSHEET
VOLUME II, BUSINESS AND PRICE PROPOSAL – Submittals in Vol II will not be rated Standard Form (SF)1442 will be reviewed for completeness
Amendment Acknowledgement will be reviewed for timely and proper acknowledgement
SECTION B PRICE SCHEDULE Proposed pricing will be evaluated for fair and reasonableness. Reasonableness will be determined considering comparisons to competitive pricing and to the independent Government Estimate (IGE). Proposed pricing that differs significantly from the competition or IGE will be reviewed to assess potential performance risk and the offeror’s understanding of contract requirements. If multiple contract line items are included in the price schedule, prices will be evaluated to determine whether any line items are unbalanced. Offerors are cautioned to distribute cost appropriately.
Contract Price Schedule
(CPS)
Amendment 3 will revise CPS to update construction years.
Bid Options on CPS differ from those on construction documents cover sheet – CPS shows the correct bid options
VOLUME II, BUSINESS AND PRICE PROPOSAL (continued) SF 24 BID BOND: The Standard Form 24, Bid Bond will be reviewed for completeness and acceptability.
SECTION K REPRESENTATIONS AND CERTIFICATIONS: Information will be reviewed for completeness and award eligibility.
GENERAL REFERENCES: Points of contact will be queried to determine Responsibility pursuant to FAR 9.103.
Subcontracting Percentage Worksheet will be reviewed for completeness and correlation to proposed pricing.
General Project Description Year of Construction:
Travel Distances/Time:
West Glacier to Kintla Creek Bridge 40 miles/1.5 hours St. Mary to Lee Creek Bridge 25 miles/35 minutes St. Mary to Appistoki Creek Bridge 33 miles/1 hour West Glacier to Appistoki Creek Bridge 66 miles/1.5 hours
General Project Description Project work is located at 3 separate locations within GLAC Work occurring on the western half of the North Fork Bridge is located on USFS land Rehabilitation and preservation of 13 existing bridges occurring in 2 phases. Each phase occurring in a separate construction seasons; 2021 and 2022 No construction will be permitted between December 1, 2021 and August 15, 2022 Refer to specs for exact permissible dates for construction as they vary for each of the 13 bridges Threatened and Endangered Species – Bull Trout (all 13 locations)
Flugstad, Heidi L (FHL) - Check these dates - they are different for each yer.
Baker, Jennifer K (BJK) - Yup - this is the window where construction will not be permitted per the specs General Project Description 2021 Construction: Appistoki Creek Bridge, Camas Creek Bridge, Lee Creek Bridge, and Quartz Creek Bridge with options to add Dutch Creek Bridge, Anaconda Creek Bridge, and Logging Creek Bridge shall be constructed and substantially completed during the authorized dates of 2021 2022 Construction: North Fork Bridge, Fish Creek Bridge, Akokala Creek Bridge, Bowman Creek Bridge, and Ford Creek Bridge with option to add Kintla Creek Bridge shall be constructed and substantially completed during the authorized dates of 2022
Project Considerations Remote nature of jobsite 3 different locations in Park Contractor to secure their own housing Little to no cellular service within the Park Satellite communication/radios should be utilized Schedule Constraints: NTPs and in-water work Weather Long Lead Items: Timber Piles, mix designs, concrete, etc.
Snow Plowing
Wildlife/Natural Resource Considerations Contractor shall comply with guidance in the park provided document “Bear, Wildlife, and Sanitation Requirements While Working in Glacier National Park A Handbook for Construction Personnel” Suspend construction activities and immediately notify the CO when a grizzly bear, Canada lynx, wolverine, or any other wildlife approaches, lingers near, or otherwise appears to be attracted to the project area that creates a potential animal/human conflict. Proceed with operations only after authorized by the CO.
Note – not all mitigations are listed in this PowerPoint presentation. Refer to contract documents and permits.
Natural and Cultural Resource Considerations If previously unknown cultural resources are discovered during the project, the park archaeologist or historic preservation personnel and CO shall be contacted immediately. Contract work in the vicinity of the discovery will be suspended until the site is cleared by the parks cultural resource specialists.
Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
Provide temporary barriers to protect existing trees and plants and root zones.
Natural and Cultural Resource Considerations Do not remove, injure, or destroy trees or other plants without prior approval. Consult with Park Natural Resource staff and Contracting Officer and remove agreed-upon roots and branches that interfere with construction.
Do not fasten ropes, cables, or guys to existing trees.
Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
If waterway becomes cloudy, off-color, or otherwise turbid during construction as determined by the CMR, work shall be stopped until water clears. Contractor shall correct any issues occurring as a result of water turbidity.
Environmental Considerations Contractor’s Environmental Manager: Designate an on-site party responsible for overseeing the Contractor’s conformance to environmental goals for the project and implementing procedures for environmental protection.
Contractor’s Environmental Training Program: Contractor shall provide environmental training for workers performing work on the project site. Training shall include:
Overview of environmental issues related to the Project Review of site-specific procedures and management plans (Construction Waste Management/Temporary SWPP) Pollution Prevention (P2) practices Compliance with environmental regulations
Permits Government Furnished:
United States Army Corps of Engineers (USACE) Section 404 Nationwide Permit 14.
MT DEQ 318 Authorization
Contractor Responsible to Provide Permits Encroachment Permit for work on west side of North Fork Bridge – Flathead County
Potential Permits (not inclusive):
Contractor trailer, Utilities hookup permit – Refer to specification for suggestion on private property MPDES Construction Dewatering General Permit (CDGP)
Structural Tests and Special Inspections Retaining Walls & Bridges for Seismic and Wind Requirements i.e. Periodic and continuous special inspections are required for the welding at the replacement pile splice locations, welding and anchorage at the connection of the replacement steel pile to existing concrete pile cap.
Refer to Specs for a comprehensive list of testing requirements
Stream Diversion and Dewatering Temporary Stream Diversion (TDS) Plan Submitted a minimum of 30 calendar days prior to work below the Ordinary High Water Line (OHWL).
Separate TSD plan shall be prepared and submitted for each temporary stream diversion that is required.
Stream Flow Blocking and Dewatering Provide the method(s), including locations and details (narrative and drawings), for blocking both the upstream and downstream ends of the diversion. Describe how minor leakage from upstream and downstream will be addressed Include provisions for scour protection Identify the means and methods for dewatering and disposal of the water Provide locations and frequency of water quality monitoring
Fish Removal The Contractor shall provide for and coordinate with an experienced, local fisheries Biologist for fish removal of the stream reach being isolated by the temporary stream bypass system. The fisheries Biologist in accordance with any permits shall perform the tasks as outlined in the specifications.
Flugstad, Heidi L (FHL) - Ask Jennifer about this.
Baker, Jennifer K (BJK) - Sent spec to Heidi Work Restrictions On-Site Work Hours: 7:00 am to 7:00 pm, Monday through Friday Weekend and Early Morning Hours are subject to Contracting Officer’s approval Night work shall not be permitted Existing Utilities: Notify Contracting Officer and utility companies of proposed work locations and times for excavation Contractor responsible for locating and preventing damage to known utilities Do no interrupt utilities serving facilities occupied by Government or others unless coordinated otherwise (RE: Project Specifications) Smoking permitted in designated areas as approved by the CO Not permitted while working or operating equipment Contractor shall provide wildlife proof disposal container for cigarette butts Not permitted when fire danger is high No fires shall be permitted within the Park
Stockpile/Staging Areas Stockpile and staging areas have been delineated for each of the 13 bridges in the construction documents; Contractor will be restricted to using these areas.
Materials may be stored in closed roadways within 500 ft of bridge as approved by CO
Appistoki Creek Bridge (2021) Single lane closure to vehicular traffic during construction In-Water Work: September 20, 2021 –November 30, 2021 Out-of-Water Work: September 20, 2021 – November 30, 2021 Special Considerations:
Archeological Protection for archeological resources contained in soil deposits for the Appistoki Bridge work and the roadway work of the Inside North Fork Road.
Historic Preservation Treatment Plan Stream Diversion and Fish Removal Photo-documentation Rockwork disassembly, cataloging, reassembly Lead time for concrete color match
Lee Creek Bridge (2021)
In-Water Work: N/A Out-of-Water Work: September 1, 2021 – November 30, 2021 Not before bats have fledged from under bridge as determined by GLAC personnel Pedestrian crossing for backcountry access provided during construction
Special Considerations:
Bats - Fledging
North Fork Bridge (2022)
In-Water Work: N/A Out-of-Water Work: September 1, 2022 – November 30, 2022 Not before bats have fledged from under bridge as determined by GLAC personnel
Special Considerations:
Bats - fledging
Typical Concrete Bridge Work
Akokala Creek Bridge (2022) Full closure to vehicular traffic during construction In-Water Work: September 6, 2022 –September 30, 2022 Out-of-Water Work: September 6, 2022 – November 30, 2022 Not before bats have fledged from under bridge as determined by GLAC personnel Special Considerations:
Stream Diversion Potential Fish Removal Bats - fledging
Anaconda Creek Bridge (2021) Inside North Fork Road is currently closed at this bridge and shall remained close for the duration of 2021 construction In-Water Work: August 1, 2021 –September 30, 2021 Out-of-Water Work: August 1, 2021 – November 30, 2021 Not before birds have fledged from nest under bridge as determined by GLAC personnel Special Considerations:
Stream Diversion
Birds - fledging
Bowman Creek Bridge (2022)
In-Water Work: September 6, 2022 –September 30, 2022 Out-of-Water Work: September 6, 2022 – November 30, 2022 Inside North Fork Road shall be closed south of Bowman Creek Bridge for the duration of Bowman Creek Bridge and Akokala Creek Bridge construction Coordinate with the Park and Residents to facilitate access for residents between Bowman Creek Bridge and Akokala Creek bridge during construction Special Considerations:
Stream Diversion
Camas Creek Bridge (2021)
In-Water Work: August 1, 2021 –September 30, 2021 Out-of-Water Work: August 1, 2021 – November 30, 2021 Addendum will correct construction window dates to those shown here Pedestrian crossing for backcountry access provided during construction Special Considerations:
Dutch Creek Bridge (2021) North Fork Road is currently closed at this bridge and shall remain closed for 2021 construction In-Water Work: August 1, 2021 –September 30, 2021 Out-of-Water Work: August 1, 2021 – November 30, 2021 Not before birds have fledged from nest under bridge as determined by GLAC personnel Special Considerations:
Stream Diversion
Birds - Fledging
Fish Creek Bridge (2022)
In-Water Work: September 6, 2022 –September 30, 2022 Out-of-Water Work: September 6, 2022 – November 30, 2022 Limited vehicular access shall be provided to GLAC personnel during construction Special Considerations:
Ford Creek Bridge (2022)
In-Water Work: August 15, 2022 –September 30, 2022 Out-of-Water Work: August 15, 2022 – November 30, 2022 Inside North Fork Road shall be closed south of Ford Creek Bridge for the duration of Kintla Creek Bridge and Ford Creek Bridge construction Special Considerations:
Kintla Creek Bridge (2022)
In-Water Work: August 15, 2022 –September 30, 2022 Out-of-Water Work: August 15, 2022 – November 30, 2022 Not before birds have fledged from nest under bridge as determined by GLAC personnel Inside North Fork Road shall be closed south of Ford Creek Bridge for the duration of Kintla Creek Bridge and Ford Creek Bridge construction Special Considerations:
Stream Diversion
Birds - Fledging
Logging Creek Bridge (2021)
In-Water Work: August 1, 2021 –September 30, 2021 Out-of-Water Work: August 1, 2021 – November 30, 2021 Not before birds have fledged from nest under bridge as determined by GLAC personnel Inside North Fork Road shall be closed north of Quartz Creek Bridge for the duration of Logging Creek Bridge and Quartz Creek Bridge construction Special Considerations:
Stream Diversion
Birds - fledging
Quartz Creek Bridge (2021)
In-Water Work: August 1, 2021 –September 30, 2021 Out-of-Water Work: August 1, 2021 – November 30, 2021 Inside North Fork Road shall be closed north of Quartz Creek Bridge for the duration of Logging Creek Bridge and Quartz Creek Bridge construction Special Considerations:
Typical Timber/Concrete Bridge Tasks
Bridge Videos Videos for the 13 bridges from a scoping trip have been uploaded here: GLAC Bridge Videos - YouTube
On Site Visit
Appistoki Creek Bridge Meeting Date and Time: May 11th at 11:00 am MST Meeting Location: Two Medicine Gate Approximately 4.1 miles down 2 Medicine Rd, East Glacier Park, MT, 59434 Contractors can drive unattended to the bridge after we are through the gate. They will have approximately 1 hour.
North Fork Bridges Meeting Date and Time: May 12 at 8:00 AM MST Meeting Location: Polebridge Ranger Station 714 Glacier Dr., Polebridge, MT 59928
POC: Jana Montiel, Project Manager Cell: 406-407-0581
On Site Visit (continued) Site Itinerary:
Leave Polebridge Ranger Station at 08:15 AM MT and travel as a caravan, stopping and continuing as a group. We will spend approximately 30 minutes at each bridge. Site visit will end after we go through the gate just past Camas Creek Bridge. The N. Fork, Fish Creek, and Lee Creek Bridges can be visited unattended.
Site Visit Sequence:
Bowman Akokala Ford Kintla Quartz Logging Anaconda Dutch Camas
Thank You For Your Interest in This Project E X P E R I E N C E Y O U R A M E R I C A
National Park Service U.S. Department of the Interior image3.jpeg image2.jpeg image4.emf image5.jpg image6.jpg image7.jpg image8.jpg image9.jpg image10.jpg image11.jpg image12.jpg image13.jpg image14.jpg image15.jpg image16.jpg image17.jpg image18.jpg image19.jpg image20.jpg image21.jpg image22.jpg image23.jpg image24.jpg image25.jpg image26.jpg image27.jpg image28.jpg image29.jpg image30.jpg image31.jpg image32.jpg image33.jpg image34.jpg image35.jpg image36.jpg image37.png image1.jpeg