This document contains an amendment to a solicitation for a federal contract opportunity to provide native container plants, installation, and maintenance services to facilitate restoration of native vegetation along the Badlands Loop Road in Badlands National Park. The solicitation is seeking proposals to address approximately four acres of roadside disturbance from repair and construction activities occurring from 2020 to 2021, through seeding and container plantings. Key details include a revised deadline for proposals of March 12, 2021, clarification that maintenance is required for four acres of weed control but only two acres of container plant watering, confirmation of acreages to be planted at three specific sites, and responses to questions relating to installation timing and requirements, traffic control, site preparation, and watering logistics.

View the file

Other files for this federal contract opportunity

Other files attached to BADL 225939/227427 - Provide native container plan, newest first.
File Type Posted
Sol_140P2021Q0005_Amd_0001.pdf PDF
B08_Attachment 1 WD 2015-5367 12212020.pdf PDF
Sol_140P2021Q0005.pdf PDF
B08_Solit_CombinedSynopsisSolicitation_140P2021Q0005.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2021Q0005 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

DSC

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy DOI, NPS, DSC Contracting Services

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

03/10/20210002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/26/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide additional Questions and Answers.

Legacy Doc #: NPS

Period of Performance: 03/26/2021 to 03/25/2026

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Todd Stackhouse

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Response to BADL Plant Propagation Solicitation

Q: I am interested in bidding on the Badlands revegetation project. Is there flexibility with install? We have a pretty full slate this fall but have availability early spring. A: We do have flexibility on install. Fall is preferred as we have found less watering is needed, but spring is not out of the question.

Q: Also do prevailing wages apply to this project and if so can you send me those? A: Todd can you answer?

Q: On Page 7 of the RFQ, Task 5. Option: 2021/2022 Container Plant Maintenance, it states that: "the total treatment area is anticipated to be four acres." I believe this should be two acres, reduced from the original scope as the planting area was reduced. Or was the maintenance area intended to stay the same as the original scope? A: The total maintenance area for weed control is still 4 acres, while the container plant watering has shrunk to 2 acres.

The specified planting area (for Task 3) has been reduced to (2) acres, however the total treatment area for invasive plant maintenance (Task 5) is still listed as (4) acres.

a. Please confirm the treatment area for invasive plant maintenance. 4 acres for weed control and 2 acres for watering container plants.

b. In the description of Task 5 provided on page 7 of the solicitation, it states that “Maintenance shall involve….removing non-native invasive plants from the planting site (i.e. entire area in-between individual plants and clusters and a 10-foot butter around the outside perimeter of clusters).” If the total treatment area for invasive plant maintenance is (4) acres, what is the standard/expectation for treatment in non-planted areas? The expectation for the non-planted 2 acres is that they will be weeded in entirety with a 10 foot buffer around the disturbed areas.

c. If maintenance of non-planted areas is required, are any of those sites flat enough to enable boom spraying using a UTV? While the areas are along the roadside they have also been seeded so a boom sprayer is probably not feasible without a lot of overspray.

Q: Please provide new acreage estimates for each planting site (Bigfoot Pass, Dillon Pass, and Fossil Trailhead). A: 2 acres Bigfoot Pass, 1 acre Dillon Pass, and 1 acre Fossil Trailhead

Q: What are typical install windows in that landscape? i.e how early in the spring and how late in the fall can plants usually be installed? A: From SOW: April and late October-early November, depending on snowfall.

Q: Is signage and cones acceptable traffic control and will a flagger absolutely be required to comply with this item? A: A flagger will be required while vehicles are occupying a traffic lane (not in parking areas). This will most likely be required at Bigfoot and Dillon.

Q: At the fossil trailhead is the recommend sequence to remove blanket, seed, replace blanket and then cut in plants or do you envision something else here? A: Yes, that is the expectation. However, we are open to switching some of these around if it makes sense in the field.

Q: How do you envision the watering going prior to planting and then during the watering in phase of planting? For the site with steep slopes can we assume that hoses will need to be dragged up the slope and water pumped to reach plants at the top? A: All slopes are downhill of the roadway. There will be no need for pumps. Hoses will be needed to reach the plants at all sites. It should be assumed a water tank or water truck will be needed to fill the planting holes both prior to planting and afterwards.

Q: Will weed control be required even if the maintenance option is not bid? In other words will weed removal or treatment be required just prior to planting? A: If the maintenance option is not bid it will not be required under the installation task to treat invasives. However, if NPS is not able to award a maintenance contract the installation contractor may be asked to help with weed control prior to install, but only with an agreed upon modification to the contract.

Q: Would you consider moving the deadline for proposals to Fri. March 12? A: Deadline is now March 12.