Sol_140P2019R0051_Amd_0002.pdf

PDF 286 KB Posted

Attached to
Nationwide A-E IDIQ Federal contract opportunity
Solicitation number
140P2019R0051
Issued by
Department of the Interior National Park Service National Office

About this file

This document is an amendment to a solicitation for a nationwide architecture and engineering indefinite delivery/indefinite quantity (IDIQ) multiple award contract. The National Park Service seeks general engineering services including environmental, structural, mechanical and civil engineering. The period of performance is five years. Offerors must acknowledge receipt of the amendment by November 21, 2019. The subcontracting goal is 43% of total contract value to small businesses, including 5% each to small disadvantaged, women-owned, and service-disabled veteran-owned small businesses. Incumbent IDIQ holders include HDR, VHB, CH2M Hill, and Louis Berger. Key details include response requirements, evaluation criteria, and clarification of licensing and past performance information in proposals.

View the file

Other files for this federal contract opportunity

Other files attached to Nationwide A-E IDIQ, newest first.
File Type Posted
Sol_140P2019R0051_Amd_0004.pdf PDF
Sol_140P2019R0051_Amd_0003.pdf PDF
NW A-W IDIQ Q-A's-Amd 1_0001.pdf PDF
Sol_140P2019R0051_Amd_0001.pdf PDF
Sol_140P2019R0051.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2019R0051 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

DSC

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy DOI, NPS, DSC Contracting Services

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

11/14/20190002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

10/24/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Nationwide IDIQ General Engineering Services - Amendment 2

Legacy Doc #: NPS

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Todd Stackhouse

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

(x)

140P2019R0051 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

DSC

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy DOI, NPS, DSC Contracting Services

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

11/14/20190002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

10/24/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Nationwide IDIQ General Engineering Services - Amendment 2

Legacy Doc #: NPS

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Todd Stackhouse

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Question and Answer

Spreadsheet 140P2019R0051

Nationwide Architect and Engineering IDIQ

14-Nov-19

Question No. Sheet or Reference Question

Response Amendment Answered

Will the NPS consider adjusting the Questions deadline to be earlier than November 21, 2019? The current questions deadline leaves little time for offerors to adjust their response, given the turnaround time from Q&A to the proposal due date.

The date will remain unchanged. 1

Will 10 pt font for graphics and tables be acceptable?

12 point font shall be used for all graphics and tables.

Does the font on SF-330 Part II forms need to be 12 pt? These forms are typically updated on an annual basis, using the default font setting embedded within the Part II form.

The default font found within the form shall be utilized. As these are fillable forms, the font utilized as part of the form fill in can be utilized.

Do SF-330 Part II forms need to comply with the 1-inch margins? These forms are typically updated on an annual basis, using the default margin setting embedded within the Part II form.

The default margins and fonts shall be utilized as they are fillable forms.

Can the NPS confirm that a small business subcontracting plan is not required in our response?

All large businesses are required to submit their subcontracting plan.

Can NPS clarify the 43% small business subcontracting goal? This is approximately three times larger than the 15% requirement in the last contract. With the addition of the separate IDIQ - Small Business Pool solicitation, we want to confirm that this percentage is accurate.

The overall subcontracting goal is 43%. This aligns with the agency's goals of 43% which is set by the Department of Interior. Of this 43%, the following percentages must also be adhered to:

a. 5% shall be placed with small disadvantaged businesses,

b. 5% shall be placed with somen-owned businesses,

c. 3% shall be placed with service-disabled veteran-owned small businesses,

d. 3% shall b eplaced with HUBZone certified firms,

e. The remaining 27% shall be placed with any small business regardless of socio-economic status.

Can the NPS confirm if the prime must subcontract 43% to subcontractors (small or large), or must prime firms subcontract 43% specifically to small businesses.

43% must be specifically to small businesses. 1

The solicitation states: "All submissions must be clearly marked with the following caption

"RELEASEABLE TO GOVERNMENT AGENCIES

FOR EVALUATION PURPOSES ONLY".

However, it is unclear if this requirement pertains to the SF-330 response, or the Forward Pricing Rate Agreement proposal.

Can the NPS confirm?

The SF-330's are considered an attachment to your proposal; therefore, this is implied that it is "Releaseable to Government Agencies for Evaluation Purposes" and need not be printed on every page of your submission. As long as the cover letter and package indicates this information on the ocver it is acceptable. The FPRA is not being requested at this time. The FPRA submission is only provided if you ar enotified of being selected as one of the most highly qualifed firms. This information was provided for informational purposes only.

Similar to the 2014 proposal process, please confirm it is acceptable to include IDIQ contracts showcasing multiple task orders as project examples in Section F.

This is acceptable; however, the page and font size limitations still apply.

The response to Frequently Asked Question #8 states: "The firm must have an experienced expert in dam design engineering, failure modes, risk analysis, emergency action planning for dams, levees and canals." The use of "must have" indicates it would be a required discipline, but if dam design engineering is not included in the list of required disciplines. Can the NPS confirm if dam design engineering is a required discipline?

It is not a required discipline; however, some projects may require the expertise and knowledge of these disciplines to complete certain aspects of the work.

The solicitation requires firms to have a person licensed in each state, its territories and possessions for each major engineering discipline, and requires firms to show proof of licensing within 30 days of being notified of most high qualified status. This requirement was included in the 2014 Nationwide Engineering IDIQ solicitation, but the NPS ultimately relaxed this requirement in the second Q&A document to the following: "In order to be considered for award of this IDIQ contract, firm(s) must indiciate their ability to obtain all professional qualifications, including individual professional licenses, certifications, etc., throughout the United States, its territories and possessions at time of the SF- 330 submissions. In order to be awarded a task order under the ensuing contract, firms will be required to demonstrate and have necessary professional licensing, certifications, etc." Our question: Adhering to the current requirement would mean submitting approximately 440 licenses. Will the NPS consider amending this requirement to reflect the 2014 response, which is to state our ability to obtain professional licenses in our proposed response, and limit the proof of licensure to th t k d l l?

The solicitation has been amended to make revisions to this requirement. The actual license and/or certification information for each individual team member can be provided on the SF-330, Box 17. The proof of licensing shall be provided within 30 days of being notified of the most highly qualified status during the Task Order ordering process. The NPS is not requiring submission of actual licenses and certifications as part of this process.

The Capacity evaluation criteria states that the evaluation will be based on "the quantity of existing work under contract.." and "…the schedules for completing the existing work". If we include all existing work under contract within our company, our response could be very lengthy and not entirely applicable to our proposed team or scope for this contract. Is it acceptable to include a condensed list of existing NPS or other similar contract work and their schedules?

The NPS does not want the actual schedules for each contract that you may or will be performing;

however, a listing of contracts (including their durations) and for whom these contracts are with is required.

The Past Performance evaluation criteria states: "prime contractor and/or team members shall provide information to demonstrate how well the firm has performed on recent, relevant projects", and that the evaluation will be based on "the past performance data from the projects presented in Section F of the SF-330 (provide references and current phone numbers)." Can the NPS confirm what specifically is required to be included in proposals, beyond reference contact information?

The SF-330 Section F provides space for firms to provide the POC, Contract Number, Contact Number and a project description relative to the past projects performed including size, magnitude and scope. It is up to the Offeror to determine which projects they wish to include in this section that demonstrates their past performance relative to projects that are similar/relevant to this requirement.

Are firms able to apply for specific regions.

No 1

We saw the Solicitation for the NPS on FBO and the status is noted as "Presolicitation". Is what is posted on FBO the RFP we will be responding to that is due on December 9, 2019 or will another version be coming out?

Please advise.

This is the only information that will be posted, except for Amendments which will address the Q&A's.

Is this opportunity proposed response to be led/primed by an Engineering firm?

The determination of the makeup of the team is the Offeror's responsibility.

Since the submittal package is made up of the SF-330, I assume the one inch margin requirement pertains to the SF-3330 response package? If correct, the SF-330 form does not appear to meet one inch margin requirements in its current downloadable form. Are we to modify the SF-330 form to meet this requirement? If not can you offer further clarification related to this requirement?

Please refer to Amendment 1 Q&A's 3 and 4. All other materials provided as part of your submission package must meet the margin and font size requirements.

Is it acceptable to use our SF-330 Part 1 forms template (created in a publishing software) that meets all the SF330 part I form requirements and visual structure of the downloaded SF-330 Part 1 forms? This will allow flexibility to add tables, images, and othe rgraphics to respond to the Solicitation.

Please refer to Amendment 1 Q&A's 3 and 4. If an Offeror chooses to utilize a software program to develop the SF-330, the page size, font and margin limitations must not exceed the fillable SF- 330 page size, font and margin limitations.

If permitted to use our SF-330 Part 1 templage, would the use of the default font (Arial 10 pt) and the default margins in the downloadable GSA Sf-330 forms still apply?

Yes, please see Q18 above can the NPS confirm that the subcontracting plan is not required in our response?

The subcontracting plan is not required as part of this submission; however, contract award is contingent upon negotiation of an accceptable subcontracting plan. 2

Can the NPS clarify if the 43% small business requirement is 43% of the total contract value or 43% of the total subcontracted amount?

43% of the total contract value 2

Our understanding is that in addition to a cover letter, the remainder of our response would be the SF-330 Part I forms (Sections A- D, Section E Resumes, Section F Projects, Section G Matrix and Section H-I forms. Can the NPS clarify this portion of the Q&A response: "The SF-330's are considered an attachment to your proposal?"

The cover letter including all of the sections of the SF-330 plus any additional pages included comprise the whole of your proposal package. 2

Can the NPS confirm if there are page limits to any other SF-330 Part I sections (Sections A-D, Section E Resumes, Section F Projects and Section G Matrix?

Section H is limited to 20 pages and Section F is limited to 10 project descriptions. 2

If we include all existing work under contract within our company, our response could be very lengthy and not entirely applicable to our proposed team or scope for this contract. As a result, we are assuming it is acceptable to include a condensed list of existing NPS or other similar contract work. Please confirm this assumption is correct.

The list of existing work should demonstrate the team's workload capacity and should be inclusive of work not only for the NPS but other governmental agencies and public and private entities. 2

Given that the inclusion of even a condensed list of existing work would be very lengthy, can NPS confirm that the list of existing work under contract is only required of the prime firm and would not be required from subconsultants? Please see response to Q24 2

Previously we have used SF330 forms that are in word, to make it easier to format. Is that still acceptable? A few of the answers lists a fillable form that should be utilized? Is this a new requirement moving forward that we will need to use the fillable pdf forms or is it still acceptable if we use the word version of the forms?

Please see responses to Amendment 1, Questions 3 and 4 and Amendment 2 Questions 17, 18 and

19. Word is also acceptable as long as the page limits, font limits and margin limits are adhered

to. 2

For the Nationwide General Engineering Services for National Park Service Intermountain Region will the scope of work include surveillance physical security?

This announcement is a nationwide announcement and not specific to the Intermountain Region and the Scope of Work is provided for in the announcement. 2

We are seeking clarification for the format requirements of the SF 330. In the Q&A responses, two questions #3 and 4 were asked about the SF 330 Part II 1 - inch margin and font size requirements. The government responded since these are fillable forms, the responders should use the default font and margins (referring to the Part IIs). Does this response apply to the entire SF330 Parts A-H since they are also fillable forms. To change these forms to one inch margins on all four sides is problematic and greatly distorts the forms. The 12 point font is doable.

Yes 2

Some of the answers to the Frequently Asked Questions appear to conflict with what is stated within the Solicitation. For example, in the Submission requirements section of the solicitation, it states that "Section H of the SF- 330 should not exceed 20 pages"; however, A12 of the Frequently Asked Questions states, "the additional supporting material shall include Section H pages and is limited to 20 double sided pages in total." Is Section H limited to 20 pages or 40 pages of content?

20 Double sided pages. 2

In the Professional Qualifications section of the solicitation, key personnel are referred to.

Does the NPS define "key personnel" broader than the proposed staff associated with "required disciplines" defined in the solicitation? If so, please provide the definitition of key personnel as it pertains to this solicitation. No, they are synonous with the "required disciplines". 2

Can the NPS elaborate on what type of environmental engineer is required? Does this role relate more to industrial hygiene/asbestos/hasmat or water/stormwater?

The role of the environmental engineer covers a lot of categories. It includes both industrial hygiene/asbestos/hazmat, water/stormwater and wastewater as well as site remediation, pollution prevention, and in some cases ecological restoration. 2

Can you please share what the contract numbers are for the previsouly-awarded firms?

HDR - P15PC00008

VHB - P15PC00012

CH2M Hill - P15PC00018 Louis Berger - P15PC00019 2

NW A-W IDIQ Q-A's-Amd 2.pdf
Sheet1

File details come from the government source that posted it. Updated .