This is a Statement of Work (SOW) for gate repair and installation services at Whittaker Creek Recreation Site near Walton, Oregon, issued by the Bureau of Land Management (BLM) Northwest Oregon District Siuslaw Office in Springfield, Oregon.

The contractor shall repair one upper loop campground gate by reinstalling a fallen post and securing it with concrete, plumbing the opposite post to allow gates to swing together, and welding brackets onto posts to make the gate operational. The contractor shall also install a new gate (already in BLM inventory) at the lower road to low-water bridge location by installing two posts on either side of the access road and ensuring the gate operates and can be locked. Both gates will serve as visual and vehicle deterrents for trespass, vandalism, theft, and unauthorized access. The contractor must supply all labor, materials, and transportation to complete the project. The period of performance is two months from the date of award. The contractor shall communicate with BLM weekly and respond to inquiries within two business days. The only deliverable is a detailed invoice of all work completed. The contractor may re-use and utilize existing hardware, posts, and other mounts as reasonable to repair the gates. No security requirements or attachments are specified.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Whittaker Creek Recreation Site Gate Repair Statement of Work (SOW)

1. GENERAL

Purpose/Objective Whittaker Creek Recreation Site needs one gate repaired and one gate replaced that will serve as a visual and vehicle deterrent for trespass, vandalism, theft, and other unauthorized access to the recreation site.

The Contractor shall provide all personnel, materials, services, transportation, and equipment necessary for repairing:

Upper loop campground gate: reinstall fallen post and secure with concrete;

plumb the opposite post to allow gates to swing together; weld brackets back onto posts to make gate operational.

Lower road to low-water bridge: install new gate (already in BLM inventory) to block access to low water bridge. Install at location indicated by BLM staff.

Requires installing two posts on either side of access road and ensuring gate operates and can be locked.

1.1. Background

The Bureau of Land Management Northwest Oregon District Siuslaw Office in Springfield, Oregon is interested in acquiring repair to two gates at Whittaker Creek Recreation Site.

1.2. Location This site is Whittaker Creek Recreation Site near Walton, Oregon.

1.3. Period of Performance

The period of performance of this contract is two months from the date of award.

DESCRIPTION OF SERVICES/TASKS

The contractor will repair one gate and install new gate at Whittaker Creek Recreation Site that will allow BLM to block vehicle access to two locations within the Recreation

Statement of Work 2 site. This may include the components below, but BLM will consider recommendations of the awarded contractor:

Re-install existing post at upper gate loop.

Plumb existing post at upper gate loop.

Weld brackets onto damaged gate panels to allow gates to be attached to posts.

Ensure gates swing shut and can be secured together to block vehicle access to upper loop.

Install two posts of new gate to block vehicle access to low-water bridge.

Ensure new gate functions and can be locked.

2. CONTRACTOR FURNISHED PROPERTY AND OTHER REQUIREMENTS

Contractor will supply all labor, materials listed, and transportation to Whittaker Creek Recreation Site to complete project.

3. COMMUNICATIONS

Contractor will communicate with BLM weekly and respond to inquiries within 2 business days.

4. GOVERNMENT-FURNISHED ITEMS

Contractor may re-use and utilize existing hardware, posts, and other mounts as reasonable to repair gates.

5. DELIVERABLES

5.1. The contractor will supply detailed invoice of all work completed to BLM.

6. SECURITY

None