This is a Request for Quotation (RFQ) for a firm fixed-price commercial service contract issued by the Bureau of Land Management (BLM) Burns District in Oregon for blackwater cleanup and restoration services. The solicitation number is 140LL027Q0029, with an offer due date of November 27, 2026 at 1400 PS (Pacific Standard Time). The contract is set aside for Women-Owned Small Businesses (WOSB) at 100 percent, and quotations must be submitted electronically to Christy.webster@ios.doi.gov and PAM-All_BLM_OR_WA_Solicitations@ios.doi.gov. Questions regarding the solicitation must be submitted in writing two days before the closing date.

The scope of work encompasses comprehensive cleanup and restoration of the BLM's Wild Horse Adoption Office (approximately 500 square feet) and an adjacent storage shed in Hines, Oregon (28910 HWY 20 West) following multiple blackwater backups from septic system failures. The contractor must perform site assessment and hazard controls, blackwater removal and extraction, removal of damaged materials (estimated at 600 sq feet of drywall, 180 linear feet of baseboards, and 100 sq feet of vinyl flooring), cleaning and disinfection of all surfaces, dry-out operations to meet industry standards (IICRC S500/S520), complete restoration including painting and fixture reinstallation, rodent and reptile sealing of the shed, and final inspection with clearance testing for sewage pathogens and mold. The contract period of performance is 90 days from the Notice to Proceed (NTP), with a delivery date of March 5, 2027. Work hours are limited to one-half hour before sunrise to one-half hour after sunset, excluding Saturdays, Sundays, and federal holidays unless authorized. All work must comply with OSHA, EPA, Oregon DEQ, and applicable fire season requirements. Evaluation factors include technical approach and schedule/resource management, relevant experience with at least three similar projects completed within five years, and pricing. The contracting officer is Christy Webster, and the Service Contract Act wage determination applies with a Maintenance Mechanic GS-10 rate of $49.07 plus benefits. Invoices must be submitted through the Invoice Processing Platform (IPP) at https://www.ipp.gov, and contractor performance will be evaluated using the Contractor Performance Assessment Reporting System (CPARS).

View the file

Other files

File Type Posted
B03_Wage_Determination_SAM_gov.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3.AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE

. YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4.

FAR 52.212-3 AND 52.212-5 ARE ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

DATED.

OFFER

ADDENDA

ADDENDA

140LL027Q0029

See Schedule See Schedule

BLM Oregon/Washington State Office 1220 SW 3rd Avenue, 12th Floor

PORTLAND OR 97204

11/27/2026 1400 PS

0044061041

Christy Webster 5038086074

LOW 100.00

LOW

Christy Webster

561790

$9

11/16/2026

0011276559

ADMINISTERED BY:

BLM Oregon/Washington State Office

1220 SW 3rd Avenue, 12th Floor

PORTLAND OR 97204 USA

DELIVER TO:

BLM-OR BURNS DISTRICT OFFICE*

Continued...

STOCK RECORD (S/R)

STANDARD FORM 1449 (REV. 11/2021) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

ACCEPTED,

28910 HWY 20 WEST

HINES OR 97738 US

Blackwater cleanup and restoration.

Delivery: 03/05/2027

Period of Performance: 12/05/2026 to

03/05/2027

00010 Blackwater cleanup and restoration

Product/Service Code: F108

Product/Service Description: ENVIRONMENTAL

SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATION

Blackwater Cleanup and Restoration, Burns, Oregon SOLICITATION NO. 140LL027Q0029 BLM Burns District

SECTION B – SERVICES AND PRICES

This requirement is for one (1) Firm Fixed Price Commercial Service Contract for Blackwater cleanup and Restoration in Burns, Oregon.

Item no. Item Description Quantity Unit of Measure

Unit Price Total

0010 Site cleanup of Adoption Office

1 EA $ $

0020 Site cleanup of She 1 EA $ $ 0030 Office Restoration – Adoption

Office

1 EA $ $

0040 Bathroom Restoration – Adoption Office

1 EA $ $

0050 Storage Closet Restoration – Adoption Office

1 EA $ $

0060 Storage of Cleaned Items on Site – Adoption Office and Shed

1 EA $ $

0070 Rodent and Reptile Sealing of Shed

1 EA $ $

GRAND TOTAL

(End of Section B)

SECTION C – STATEMENT OF WORK

1. Purpose

This Statement of Work defines the requirements for a qualified contractor to clean, sanitize, and restore two bathrooms, one utility closet, and one office impacted by black-water overflow originating from three floor drains. Work must meet all applicable Federal and State of Oregon health, safety, environmental, and workplace standards.

The cause of the backwater overflow has been repaired. The contractor will be required to clean up and repair blackwater damage to the building. Additionally, there is a small exterior shed that has evidence of rodent access into the building. The BLM would require the contractor to clean and seal this building during this contract as well.

2. Building Information and Background

The building is BLM’s Wild Horse Adoption Office and is a 24-foot, 4-inch x 20 foot, 4-inch building (~500 square feet). The building was built in the early to mid-90’s. Additionally, there was a previous contract for blackwater cleanup issued in 2025 and all required testing for lead-based paints and asbestos should have been completed at that time.

The building has three floor drains located, one in each bathroom and one in the utility closet in the office. The septic line had settled where the line entered the septic tank and caused several backups. A backup occurred in February of 2025, and BLM completed restoration work on the building in August of 2025. An additional backup occurred in July of 2026, then again in September of 2026. The septic line has been repaired.

Additionally, there is a small storage shed located in close proximity of the adoption office that is approximately 12-foot x 20-foot x 8-foot. This building has evidence of rodent intrusion and feces. It is not hooked to the sewer system and has not been impacted by the blackwater issue. However, the building is not sealed and does show signs of rodents accessing the building. The building has a roll-up door access on one side, is made out of metal with a wood floor, is uninsulated, and unfinished on the interior.

3. Scope of Work

The contractor shall furnish all labor, materials, equipment, supervision, and incidentals necessary to perform the cleanup and restoration. Work includes, but is not limited to:

Task 1 – Site Assessment and Hazard Controls

• Conduct an initial assessment to determine contamination spread and affected materials, for both the adoption office and the storage shed.

• Establish containment zones using barriers, signage, and negative air if appropriate.

• Implement OSHA-required hazard controls for exposure to sewage, biological contaminants, and mold.

• Protect unaffected areas and ensure safe worker access.

• Remove, clean, and sanitize all salvageable furniture and office equipment from the buildings.

• Dispose of any porous furniture that encountered black water or any items that cannot be cleaned to pre-contaminated conditions in accordance with all health and safety standards. A list of all nonbuilding construction material items (e.g., desks, chair, shelving units, or materials not used in the original construction of the building walls, ceiling, and floors) that need to be disposed of shall be made and approval given by BLM representative prior to final disposal of anything in the office. All disposal fees will be the responsibility of the contractor.

• Store all items removed from the office and shed onsite in a secure dry storage container once it has been cleaned.

Task 2 – Blackwater Removal and Extraction

• Remove any remaining standing water from all affected rooms, ensuring full extraction from flooring, underlayment, and adjacent surfaces.

• Remove solids and bio-contaminants following EPA and Oregon DEQ guidance for wastewater cleanup.

• Transport and dispose of contaminated materials in compliance with OAR, EPA, and local sanitation regulations.

Task 3 – Removal of Damaged Materials

• Remove porous materials that cannot be sanitized (e.g., carpets, baseboards, affected drywall).

o Estimated at:

Approximately 600 sq feet of sheet rock (based on 4 feet high along each wall surface).

Approximately 80 linear feet of 3-inch vinal baseboards

Approximately 100 linear feet of wood base boards

Approximately 100 sq feet of vinal flooring

• Document all removed materials for government records that are not integral parts of the buildings walls, ceiling, or floor.

Task 4 – Cleaning, Sanitizing, and Disinfection

• For all surfaces including interior wall materials (e.g., studs and bottom plate).

o Clean all affected surfaces using detergents approved for wastewater contamination.

o Disinfect using EPA-registered disinfectants effective against viruses, bacteria, and sewage-related pathogens.

o Treat any discovered mold per OSHA, EPA, and State of Oregon guidelines.

o Replace any materials not able to be fully disinfected and cleaned.

• Room floor surfaces include approximately 740 sq feet.

o Women’s Restroom – Approximately 45.5 sq feet o Men’s Restroom – Approximately 45.5 sq feet o Storage closet – Approximately 34.0 sq feet o Adoption office – Approximately 375 sq feet o Shed – approximately 240 sq feet

Task 5 – Dry-Out and Environmental Stabilization

• Install industrial air movers, dehumidifiers, and monitoring equipment.

• Maintain dry-out operations until moisture content meets industry standards (IICRC S500 and S520 or equivalent).

• Conduct daily documentation of humidity, moisture levels, and progress.

Task 6 – Restoration and Repairs

• Replace removed materials such as drywall, flooring, base trim, cabinet components, and other finishes.

• Restore bathrooms and office to pre-incident condition or better.

• Seal all access points in the shed for rodents or reptiles.

• Ensure all plumbing fixtures are inspected and functioning.

• Repaint all wall and ceiling surfaces within the adoption office with approved color.

o Apply at least one coat of primer on all wall surfaces.

o Apply at least two coats of approved color to all walls and ceiling surfaces, allowing time for the previous coat to dry according to manufactures’ recommendations.

• Install trim within the adoption office to match existing trim assuring joints are tight.

o Color match paint to existing paint color of trim.

o Apply 3-inch vinal baseboard to all walls in the women’s and men’s restrooms.

o Reinstall door casements.

• If toilets or other fixtures were removed to facilitate repairs, reinstall fixtures according to local plumbing code.

o Use new wax seal prior to reinstalment of toilets.

o Tighten all fixture bolts or hardware appropriately to ensure a secure hold but not overly tighten to cause a crack or breakage of the fixture.

o Reinstall water connections to fixtures and ensure no water leaks are detected.

• Return all office items and furniture to the cleaned area. Place as directed by BLM personnel.

• Discovery of additional damage will need to be addressed prior to completion of any planned work. Photographs and written statements of required work shall be forwarded to the contracting officer for approval.

Task 7 – Final Inspection and Clearance

• Conduct a final walkthrough with the contracting officer or representative.

• Contractor shall provide the Contracting Officer written documentation of clearance testing prior to reoccupation of the building. Clearance testing should consist of industry standard air and surface-type testing for sewage pathogens and mold.

• Submit full documentation of cleanup steps, waste disposal records, and restoration photos.

3. Performance Requirements

• Work must comply with:

o OSHA sewage and biological hazard standards o EPA wastewater and decontamination protocols o Oregon DEQ sanitation and waste requirements o IICRC S500/S520 restoration industry standards

• All contractor personnel must use appropriate PPE, including respirators if required.

• Work must minimize interruption to government operations and ensure safe access once cleared.

4. Contractor Responsibilities

• Provide trained and certified technicians for hazardous cleanup and wastewater restoration.

• Maintain a safe worksite and comply with all BLM facility safety requirements.

• Coordinate daily with government representatives for access and progress updates.

• Protect government property and repair any accidental damage caused during the project.

5. Government Furnished Resources

• Government will provide site access and identify impacted areas.

• Any additional government-provided materials or utilities will be communicated prior to project start.

6. Period of Performance

• Contractor shall begin work upon receipt of the Notice to Proceed (NTP).

7. Deliverables

• Daily progress and moisture-content logs

• Waste transport and disposal documentation

• Final restoration certification

• Photographic before/after documentation

• Final report detailing all actions taken

(End of Section C)

SECTION F – DELIVERIES OR PERFORMANCE

F.1.0 PERIOD OF PERFORMANCE

The contract shall commence from date of award for a period up to 90 days.

F.2.0 PROGRESS PLAN

At the prework conference, the Contractor shall provide to the COR a written "work progress plan" that details its proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.

F.3.0 STOP WORK ORDER

The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage.

Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either-

(1) Cancel the stop-work order; or

(2) Terminate the work covered by the order as provided in contract clause 52.212-4.

If a stop-work order is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work.

The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if-

(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and

(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.

If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.

If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.

(End of Section F)

SECTION G – CONTRACT ADMINISTRATION DATA

The following local clauses are provided in full text:

CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (JULY 2010)

(a) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR42.15.

(b) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available for Government use in evaluating past performance as part of a source selection action.

(c) We request that you furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.

When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/. The CPARS User Manual, registration for Online Training for Contractor Representatives, and a practice application may be found at this site.

(e) Within 60 days after the end of a performance period, the Contracting Officer will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/. Contractor Representatives may then provide comments in response to the evaluation or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official's narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives, blocks 1 - 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating ''No comment" in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment." Your response is due within 30 calendar days after receipt of the CPAR.

(f) The following guidelines apply concerning your use of the past performance evaluation:

(1) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the Contracting Officer for instructions.

(2) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

https://www.cpars.gov/ https://www.cpars.gov/ https://www.cpars.gov/ https://www.cpars.gov/

(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.

(g) I f you wish to discuss a past performance evaluation, you should request a meeting in writing to the Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30- day review period.

(h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

(End of clause)

ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP)

(FEB 2021)

Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice Processing Platform System (IPP).

“Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Products or Commercial Services included in commercial products or commercial services contracts.

The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice

1. Invoice billed according to contract line items and rates.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contract (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 – 5 business days of the contract award date.

Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

(End of Section G) https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1.0 ACCESS

In the event of a site/facility closure, the Contractor shall not perform or make deliveries to the site/facility until it is reopened by the Government, unless otherwise instructed by the Contracting Officer or their designated representative.

H.2.0 WORK HOURS

Unless otherwise specified in Section C, Specifications, work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. No work will be done on Saturday, Sunday, or Federal holidays unless authorized by the COR.

H.3.0 ENVIRONMENTAL INTERRUPTION OF WORK

H.3.1 Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions, fire danger, or because it is impracticable to work during the winter season. The Contractor will be given a resume work order which will document the date the work suspension ends. An allowance has been included in the contract time for all environmental delays. The count of contract time will therefore continue during all periods of suspension due to normal weather conditions, including fire danger. The Contractor will not be entitled to additional contract time for any suspensions except to the extent that they are due to unusually severe weather conditions. The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration.

H.3.2 Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species, identified under BLM Manual 6840, are discovered to be present in or adjacent to the project area.

H.4.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA

H.4.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.

H.4.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the Contracting Officer immediately in writing giving the location and nature of the findings.

H.4.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract Clauses Section of this contract.

H.4.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.

H.5.0 ENVIRONMENTAL IMPACT

All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13

October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);

the Endangered Species Act, as amended (16 U.S.C. Sec 1531, ET SEQ); the Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ); and the Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ). Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.

H.6.0 HAZARDOUS MATERIALS

Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating.

Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR

1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.

H.7.0 GREEN PROCUREMENT REQUIREMENTS

In the performance of this service or construction contract, the Contractor shall make maximum use of products identified on the mandatory environmental purchasing list at the following links, if applicable:

• U.S. EPA Comprehensive Procurement Guidelines published at www.epa.gov/cpg/products.htm.

• USDA Biobased product listings published at www.biopreferred.gov.

• Energy Star® product listings published at www.energystar.gov/products.

• FEMP Low Standby Power product listings published at http://energy.gov/eere/femp/covered-product-categories

Contractor shall comply with all reporting requirements stated in the applicable clause(s):

• 52.223-1 Biobased Product Certification

• 52.223-2 Reporting of Biobased Products under Service and Construction Contracts

• 52.223-4 Recovered Material Certification

• 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items

H.8.0 RESTORATION OF RESOURCES

H.8.1 Cleanup - The Contractor is responsible for cleaning up all camp and worksites before leaving the area.

Final payment or other alternative deemed feasible may be withheld until the Contractor has complied with this requirement.

http://www.epa.gov/cpg/products.htm http://www.bioprefferd.gov/ http://www.energystar.gov/products http://energy.gov/eere/femp/covered-product-categories http://energy.gov/eere/femp/covered-product-categories

H.8.2 Site and Access Roads – Site and public or private access roads negligently damaged by the Contractor shall be restored to the same condition they were in at the commencement of work, at the expense of the Contractor.

H.9.0 UNAUTHORIZED PERSONNEL

The contractor shall inform all personnel working under his jurisdiction (including subcontractor and visiting supplier personnel) that access to restricted areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.

H.10.0 OREGON FARM/FOREST LABOR CONTRACTOR'S LICENSE

If the State of Oregon requires an Oregon Farm/Forest Labor Contractor's License, then the contractor awarded this contract and all first-tier subcontractors shall be required to obtain and maintain, during the term of this contract, such a license. Contractors not having a current license will be required to furnish evidence of having obtained such license within ten (10) days after receipt of written notification of contract award. Failure to obtain, keep and maintain a current license during the term of this contract or the extension thereof shall be a basis for termination for default.

Information on obtaining this license may be obtained from:

Bureau of Labor and Industries Contact: Licensing Unit Wage and Hour Division Telephone: (503) 373-1463 3865 Wolverine St. NE; E-1 Fax: (503) 373-7636 Salem, OR 97305-1268

H.12.0 FIRE DANGER SEASON

If the COR allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR and outlined in the attachment at the end of this section.

FIRE REQUIREMENTS PROCEDURES OUTLINE

This outline covers the fire protection requirements of a contractor or private party who performs service or construction contracts on BLM land. In western Oregon, the BLM allows Oregon Forest Law (ORS) and Oregon Administrative Rules (OAR) to apply to these operations on BLM lands rather than develop similar rules applicable only to BLM lands.

1. CLOSED FIRE SEASON

The closed fire season means that fire season has been declared. ORS 477.505 gives the State Forester the authority to establish the fire season. The authority has been delegated to the District Foresters around the state who issue public notices through the newspapers and radio when fire season will be closed for their individual districts.

Closed fire season depends upon the drying of forest fuels, rainfall, and time of year. During the closed fire season, the following requirements must be met:

• Fire tools must be on site;

• Fire extinguisher must be in all vehicles;

• Chainsaws must have a .023-inch mesh screen installed in the exhaust;

• Only unmodified saws are to be used in the forest;

• Approved spark arresters must be on all internal combustion engines;

• Watchman service must be provided for 3 hrs after shutdown of power equipment for the day;

• No smoking is permitted while working or traveling through any operations area in the forest;

• No use of explosives is permitted unless approved by the State Forester's representative;

• Permits to burn are required unless waived by a representative of the State Forester.

• Permits to operate power-driven machinery shall be obtained by the Contractor prior to commencing operations unless waived by a representative of the State Forester (ORS 47.625).

Changes or modifications to the above requirements are possible depending upon changes in State of Oregon law and requirements of the State Districts and Protective Associations.

2. FIRE PRECAUTION LEVELS

There are 4 fire precaution levels that begin with level 1 at the start of the closed fire season and can go through level 4 if conditions warrant. The fire precaution levels restrict certain forest operations as the fire danger increases.

It is the responsibility of the individual operating on forest land to know the precaution level for the day and take the correct fire precautions. There are no precaution levels prior to the closed fire season. Each fire precaution level requires adherence to the restrictions applicable to all lower levels in addition to the limits placed by that level.

Level 1 is the lowest level of fire danger usually occurring early in the season and perhaps again after significant rainfall during the season. All requirements listed above apply. Waivers may be issued by the State Districts or Protective Associations and these MUST be approved by the BLM. Waivers will only be considered if the conditions on the work site are not as severe as predicted. The requirements for fire tools on site, screens installed in saws, and fire extinguishers with saws will not be waived.

Level 2 is the partial hootowl where saws can operate from first light in the morning until 1:00 p.m. in the afternoon.

From 1:00 p.m. until the end of the day saws are to be shut down. Waivers for operating beyond the 1:00 p.m.

shutdown will be evaluated on a site-by-site basis.

Level 3 is the partial shutdown of all forest industrial operations and shuts down contractor operations with few exceptions. Waivers may be issued on a site-by-site basis.

Level 4 is the general shutdown of all contractor operations. Waivers will not be issued. Landowners are permitted entry into their lands.

ORS. 477.066 requires that an operator on forest land take immediate action to control and extinguish a fire on forest land. The contractor shall take this action and notify the BLM and the nearest State of Oregon District office immediately.

OAR. 629-43-030 requires watchmen to be:

• Physically capable and experienced in operating any firefighting equipment on site.

• On duty for 3 hours after the shutdown of the last power-driven equipment for the day.

• Furnished adequate facilities for transportation and communications in order to summon assistance if needed.

• Patrolling and visually inspecting all sites where work was done during the day.

3. FIRE TOOLS REQUIRED DURING CLOSED FIRE SEASON

The operator/contractor shall furnish fire tools to all personnel on site using the following combinations.

NUMBER OF PERSONNEL_______________________________

1- 4 5 6 7 8 9 10 11 12 13 14

KIND OF TOOLS NUMBER OF TOOLS REQUIRED_________________________

Pulaskis 1 1 1 1 1 1 2 2 2 2 2

Shovels 2 2 2 3 3 3 3 4 4 5 5

Hazel hoes 1 2 3 3 4 5 5 5 6 6 6

In addition to the above handtools, the operator/contractor must provide a backpack pump can filled with water located with the tool box in a readily available area.

All shovels are to be size 0 or larger, long handled. All tools shall be sharp and ready for service. Fire extinguishers as follows:

For chainsaws - 8 oz. capacity by weight.

For vehicles - UL rating of at least 4 BC.

4. ADDITIONAL WATER SUPPLY

Contractor shall comply with ORS 477.615 during fire season when inside or within one-eighth of one mile of a state forest protection district and furnish additional water supply and equipment for use in fire suppression in conformity with the rules promulgated by the Oregon State Forester, when directed by the Oregon State Forester in writing. When required, all water supply and equipment components shall be maintained and ready for immediate use.

During fire season when operating a stationary internal combustion engine inside or within one eighth of one mile of a state forest protection district, Contractor shall comply with ORS 477.650 and provide a water supply, with equipment for its use in fire suppression for each engine, in conformity with the rules promulgated by the Oregon State Forester. All water supply and equipment components shall be maintained and ready for immediate use.

(End of Special Contract Requirements)

SECTION I – CONTRACT CLAUSES

The following clauses are incorporated by reference:

Number Date Title 52.212-4 Mar-26 Terms and Conditions—Commercial Products and Commercial Services

52.203-17 Nov-23 Contractor Employee Whistleblower Rights 52.203-19 Jan-17 Prohibition on Requiring Certain Internal Confidentiality Agreements or

Statements 52.204-13 Mar-26 System for Award Management—Maintenance 52.209-6 Jan-25 Protecting the Government’s Interest When Subcontracting with Contractors

Debarred, Suspended, or Proposed for Debarment

52.209-10 Nov-15 Prohibition on Contracting with Inverted Domestic Corporations 52.219-6 Jan-26 Notice of Total Small Business Set-Aside 52.222-3 Jul-03 Convict Labor

52.222-19 Mar-26 Child Labor—Cooperation with Authorities and Remedies 52.222-36 Jun-20 Equal Opportunity for Workers with Disabilities

52.222-42 May-14 Statement of Equivalent Rates for Federal Hires 52.222-50 Oct-25 Combating Trafficking in Persons 52.222-90 Apr-26 Addressing DEI Discrimination by Federal Contractors.

52.226-8 May-24 Encouraging Contractor Policies to Ban Text Messaging While Driving 52.232-33 Oct-18 Payment by Electronic Funds Transfer—System for Award Management 52.232-40 Mar-23 Providing Accelerated Payments to Small Business Subcontractors 52.232-9X May-06 Fast Payment Procedure 52.233-3 Aug-96 Protest After Award 52.233-4 Oct-04 Applicable Law for Breach of Contract Claim 52.240-91 Mar-26 Security Prohibitions and Exclusions 52.244-6 Apr-26 Subcontracts for Commercial Products and Commercial Services

The following clauses are provided in full text:

52.222-42 – STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)

In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.

This Statement is for Information Only:

It is not a Wage Determination

Employee Class Monetary Wage -- Fringe Benefits Maintenance Mechanic GS 10 $49.07 + Benefits

(End of Clause)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://acquisition.gov/

(End of Clause)

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.

(b) The use in this solicitation or contract of any Department of the Interior Acquisition Regulation (48 CFR Chapter

14) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.

(End of Clause)

1452.201-70 AUTHORITIES AND DELEGATIONS (SEP 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

(End of clause)

1452.203-70 RESTRICTIONS ON ENDORSEMENTS—DEPARTMENT OF THE INTERIOR (JUL 1996)

The Contractor shall not refer to contracts awarded by the Department of the Interior in commercial advertising, as defined in FAR 31.205-1, in a manner which states or implies that the product or service provided is approved or endorsed by the Government, or is considered by the Government to be superior to other products or services. This restriction is intended to avoid the appearance of preference by the Government toward any product or service. The Contractor may request the Contracting Officer to make a determination as to the propriety of promotional material.

(End of clause)

(End of Section I)

SECTION J – LIST OF ATTACHMENTS

Attachment No. Title Pages

1 Service Contract Act Wage Determination 10 The latest wage determination shall be incorporated at the time of award.

(End of Section J)

SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

K.1.0 SIGNATURE EXTENSION

If the Offeror is a partnership or a joint venture, all partners or joint venture representatives are required to sign as contractors. Signatures shall be provided below:

Name:_________________________ Name:________________________

Title:__________________________ Title:_________________________

The following provisions are incorporated by reference:

52.203-18 Jan-27 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality

Agreements or Statements-Representation

52.225-20 Aug-09 Prohibition on Conducting Restricted Business Operations in Sudan-Certification 52.225-25 Jun-20 Prohibition on Contracting with Entities Engaging in Certain Activities or

Transactions Relating to Iran-Representation and Certifications

52.240-90 Mar-26 Security Prohibitions and Exclusions Representations and Certifications

(End of Section K)

SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS OR RESPONDENTS

L.1.0 GENERAL. This is a Request For Quotation (RFQ).

L.1.1 Electronic Response. The quotation shall be electronically submitted via email to

Christy.webster@ios.doi.gov and PAM-All_BLM_OR_WA_Solicitations@ios.doi.gov

L.1.2 Requests for Information. Questions regarding this solicitation must be submitted in writing to via e-mail to Christy.webster@ios.doi.gov and PAM-All_BLM_OR_WA_Solicitations@ios.doi.gov two days before solicitation close.

L.1.3 Quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

L.2.0 QUOTATION INSTRUCTIONS. The quotation shall be submitted in two parts consisting of a (1) non-price and (2) price section.

L.2.1 FORMAT AND CONTENT OF NON-PRICE SECTION. The non-price section shall be organized by evaluation factor and sequenced in the below order. The respondent shall address the following factors in sufficient narrative and qualitative detail to be evaluated.

Evaluation Factors:

Evaluation factor 1, Technical Approach

(a) Technical Approach. Respondent shall describe a realistic plan, to include the means (labor, equipment, and materials) and methods (plan of work), and logical sequencing of activities (including interdependencies of activities) necessary to successfully complete the work within the required performance period. The plan shall list the specific equipment availability, crew(s) (size and composition) proposed to work concurrently, any other available resources, and daily production rate required.

(b) Schedule and Resource Management. Respondent shall submit a schedule identifying the milestones and critical path to successfully completing this work in addition to a list of available equipment and crew(s) (to include the size and composition of the crew) that will be used to perform this work. Respondent shall also address how it intends to meet the contract completion date if there are project delays.

(c) Quality and Safety Management. Respondent shall provide a narrative on the methods it intends for providing the contractor quality control and safety management required on this contract. The narrative shall include how the Respondent will manage decision making on quality issues when there are schedule and/or cost impacts to those decisions, manage subcontractor quality control (if subcontracting is contemplated), identify safety goals, identify any potential high risks on this project and how you intend to mitigate the potential risks, and proposed staffing for quality control personnel and safety manager.

Evaluation factor 2, Relevant Experience.

(a) Respondent shall demonstrate their specialized experience by furnishing at least three (3) projects of similar scope and magnitude to this requirement that were completed as a Prime Contractor within five (5) years of the solicitation closing date. Experience information shall include:

• Customer/contracting agency

• Contract number mailto:PAM-All_BLM_OR_WA_Solicitations@ios.doi.gov

• Contract title with location

• Identify whether experience was as a Prime or Subcontractor

• Award date

• Initial award amount

• Award amount at contract completion

• Contract completion date

• Actual completion date

• Description of project

• Describe relevant experience and any unique conditions and/or challenges

(b) Local Market Knowledge. Respondent shall demonstrate their specialized experience with similar work in project location or locations that have similar conditions to those found in the local area. The local area is defined as Harney County Oregon. The Respondent, through these projects, must demonstrate knowledge of local weather, transportation complexities, subcontracts and local market conditions.

L.2.2 FORMAT AND CONTENT OF PRICE SECTION

L.2.2.1 Evaluation Factor 3, Price. The Offeror shall remit a completed price schedule (Section B). The

Respondent shall enter unit price…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .