A04_-_140LL027Q0024_-_SOW.pdf
PDF 47 KB Posted
- Attached to
- 2027 RFO COMANCHE OXBOW TRAIL MATERIAL
- Solicitation number
- 140LL027Q0024
- Issued by
- Not on record
About this file
This is a Statement of Work for the Bureau of Land Management (BLM) Roswell Field Office for porous grid trail paver rock materials. The BLM requires 2,000 linear feet of grid trail paver material, equivalent to 6,673 square feet based on manufacturer roll dimensions, to be delivered to 2909 W. 2nd Street, Roswell, NM 88201. The contractor is responsible for unloading materials at the mapped location. Materials must be delivered within 60 days from the date of award. The grid paver materials shall be as good as or better than "Gravelpave2" manufactured by Invisible Structures Inc., supplied in rolls that are easily transportable and assembled with ordinary hand tools.
The required grid paver material must be made from 100% recycled HDPE plastic with a minimum compressive strength of 15,940 psi and a minimum 15-year warranty covering materials, design, and workmanship. Roll specifications include a width of 3.3 feet and lengths of 32.8 or 65.6 feet, with UV-weather resistance and compatibility with 3/16"–3/8" gravel fill. The material must include fasteners and installation instructions. Qualified suppliers must have been in business designing and fabricating grid trail materials for a minimum of five years and must provide references for five successful projects in service for at least three years. The contractor shall supply color options from the manufacturer's standard palette and provide recommended installation procedures including substrate preparation and anchoring. Payment will be made per linear foot of furnished usable material, with pallets or containers not exceeding 2,000 pounds each. Delivered materials will be inspected for specification compliance, with non-conforming materials rejected at no cost to the Government.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A06_-_140LL027Q0024_-_Delivery_Map.pdf | ||
| Sol_140LL027Q0024.pdf | ||
| B08_Price_Schedule.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
Statement of Work Comanche Trail Materials
1.0 Overview
BUREAU OF LAND MANAGEMENT
http://www.blm.gov
A. The Bureau of Land Management (BLM), Roswell Field Office has the requirement for porous grid trail paver rock materials to be installed by the government. Unloading the materials at the mapped location will be the responsibility of the contractor.
B. The total required quantity is 2,000 linear feet of grid trail paver material, equal to 6,673 square feet, based on manufacturer roll dimensions.
C. A complete design/specification sheet for the offered product (brand-name or equal) shall be included with the vendor’s offer.
2.0 General
A. These Guide Specifications apply to grid trail materials intended to carry primarily bicycles, pedestrians, and maintenance foot traffic.
B. It is intended to be a year-round pedestrian and bicycle trail.
C. These specifications are for grid paver rock rolls of material as good as or better than “Gravelpave2” manufactured by Invisible Structures Inc. The manufacturer shall provide the grid in rolls that is easily transportable and easily assembled with ordinary hand tools.
D. Qualified Suppliers: The grid trail material manufacturer shall have been in the business of design and fabrication of grid trail material for a minimum of five years and provide a list of five successful projects of similar type, each of which has been in service for at least three years. List the location, size, owner and contact reference for each project.
2.0 Design Requirements
A. Structural Design Requirements as good as or better than “Gravelpave2”
B. High Compressive Strength (15,940 psi/2,295,000 psf)
C. Easy, Quick Installation
D. All Weather
E. Toxin filtration
F. Unlimited Traffic for Low Speed Areas
G. Low Maintenance/Long Lifespan (60+ years)
H. Made From 100% Recycled HDPE Plastic
I. Available in Custom Colors
J. Salient Characteristics (Brand Name or Equal): Minimum compressive strength 15,940 psi; Roll width 3.3 ft; Roll lengths 32.8 ft or 65.6 ft; UV-weather resistant; Includes installation instructions; Warranty minimum 15 years; Material 100% recycled HDPE;
Compatible with 3/16"–3/8" gravel fill; Includes fasteners.
2.1 Pedestrian Live Load Main Members
A. Materials shall be designed for a pedestrian live load and additionally:
• Fire Lanes, Utility and Emergency Access Roads
• Parking Lots
• Driveways
• Outdoor Event Spaces
• Paths and Walkways (ADA Compliant)
• Ramps, Docks and Loading Areas
• Airplane Taxiing Areas
5.0 Materials
A. Made From 100% Recycled HDPE Plastic
B. Materials must be supplied in rolls that allow for measurement of usable linear feet.
Contractor shall provide roll dimensions in the offer.
C. Materials must include fasteners required for installation.
6.1 Assembly: Provide instructions to assemble.
A. Grid Trail Materials color shall be from manufacturer’s standard colors. Supply a color list for BLM to choose.
B. Contractor shall provide recommended installation procedures, including substrate preparation and anchoring.
7.0 Delivery
A. Material shall be delivered within 60 days from the date of the award
B. Materials and other accessories may come separately as long as they are packaged for outdoor storage and movable with a forklift.
C. Coordinate with BLM for delivery.
D. Delivery Address: 2909 W. 2nd Street Roswell NM 88201
E. Contact Russell Fox (575)420-3649 to schedule delivery.
F. Pallets or containers of parts shall not weigh more than 2,000 lbs.
G. Measurement and Payment: Payment will be made per linear foot of furnished usable material. Roll dimensions must be stated for accurate comparison.
H. Inspection & Acceptance: Delivered materials will be inspected for compliance with specification sheets. Materials not meeting specifications will be rejected at no cost to the Government.
8.0 Warranty
A. The manufacturer shall warrant all materials, design, and workmanship for 15 years.
B. Warranty documentation must be provided, including claim procedures.
END OF SECTION
File details come from the government source that posted it. Updated .