B08_-_Attachment_2_-_PWS_-_Kanab.docx
DOCX document 63 KB Posted
- Attached to
- BLM Utah - Paria River District HQ Janitorial
- Solicitation number
- 140LL027Q0009
About this file
This is a Performance Work Statement (PWS) for janitorial services at the Bureau of Land Management Paria River District Headquarters building in Kanab, Utah. The contract covers approximately 13,000 square feet of cleanable space across multiple areas including public restrooms, conference rooms, staff offices, breakrooms, a warehouse facility, and outdoor pavilion areas. The scope encompasses routine cleaning services performed three times weekly (Monday, Wednesday, Friday) across designated public access and staff areas, plus semi-annual and annual deep cleaning tasks including carpet extraction/shampooing, interior and exterior glass cleaning, floor conditioning on polished concrete surfaces, grout line cleaning, and wall and ceiling cleaning.
The base contract period runs January 1, 2027 through December 31, 2027, with four optional one-year renewal periods extending through December 31, 2031. The contractor must perform work between 6 a.m. and 10 p.m., with operations coordinated around standard business hours of 8 a.m. to 4:30 p.m. All contractor personnel require federal security background clearance and DOI-issued personal identification cards, with the government covering initial credentialing costs for up to five employees; subsequent personnel credentialing costs are contractor-responsible. The contractor shall provide all cleaning supplies, equipment, and materials meeting "green" purchasing standards for non-hazardous, environmentally friendly products, with specific requirements for disinfectants, paper products with recycled content, and proper chemical storage. The government furnishes storage facilities, recycling bags, Safety Data Sheet binders, and utilities including electricity, water, and dumpster services. Performance quality is evaluated against detailed standards in Section E covering floor conditions, restroom cleanliness, fixture maintenance, waste disposal, and horizontal/vertical surface cleaning, with monthly invoicing submitted electronically through the Treasury Department's Invoice Processing Platform System.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_-_Attachment_5_-_PRS__2026.xlsx | XLSX spreadsheet | |
| B08_-_Attachment_3_-_QASP_-_PRD_Janitorial.docx | DOCX document | |
| B08_-_Attachment_1_-_Bid_Schedule.xlsx | XLSX spreadsheet | |
| B08_-_Attachment_4_-_Cleaning_Schedule.xlsx | XLSX spreadsheet | |
| B08_-_Attachment_7_-_Photos.pdf | ||
| B08_-_Attachment_6_-_Inspection_Sheet_2026.xlsx | XLSX spreadsheet | |
| Sol_140LL027Q0009.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUREAU OF LAND MANAGEMENT - UTAH
Paria River District Headquarters Building
JANITORAL SERVICES
PERFORMANCE WORK STATEMENT
SECTION A – GENERAL REQUIREMENTS
A.1. GENERAL. This is a non-personal services contract to provide janitorial services to support the Bureau of Land Management (BLM) Paria River District Headquarters building in Kanab, Utah. The District building provides visitation from the public and workspaces for staff from the District Office, Grand Staircase Escalante National Monument and the Kanab Field Office. Janitorial service applies to all designated spaces indicated in the Performance Work Statement (PWS) but not limited to restrooms, offices, conference rooms, halls, work areas, kitchenettes, breakroom, entrance ways, lobbies, and storage areas, as detailed in the Location and Scope of Work. The cleanable space, excluding the pavilion and grounds, is estimated to be approximately 13,000 square feet of space, consisting of various types of flooring.
A.2. DESCRIPTION OF SERVICES. The Contractor shall provide all personnel, supplies, supervision, tools, materials, equipment transportation and other items and non-personnel service necessary to provide janitorial services in accordance with this Performance Work Statement (PWS) except those items specified as government furnished property and services. The Contractor shall perform to standards in the contract as well as all local, state, and federal regulations.
A.3. PERIOD OF PERFORMANCE. The period of performance shall be for one (1) base year of twelve (12) months and four (4) twelve-month option periods. The Period of Performance reads as follows:
| Base year | 01/01/2027 – 12/31/2027 |
| Option Year I | 01/01/2028 – 12/31/2028 |
| Option Year 2 | 01/01/2029 – 12/31/2029 |
| Option Year 3 | 01/01/2030 – 12/31/2030 |
| Option Year 4 | 01/01/2031 – 12/31/2031 |
A.4. PLACE OF PERFORMANCE. The work to be performed under this contract is located at the Paria River District Headquarters building at 669 S Highway 89A Kanab, Utah 84741 in Kane County.
A.5. HOURS OF OPERATION. The contractor is responsible for conducting business between the hours of 6 a.m. to 10 p.m. during the week, except indicated Federal Holidays or other building closures indicated in A.5.3. The various phases of cleaning and janitorial work shall, at a minimum, be carried out to meet the standards set forth in Section E. The Paria River District Headquarters is available to the public during the business hours of 8 a.m. to 4:30 p.m., normally Monday through Friday, except on Federal Holiday and building closures. BLM staff and/or Law Enforcement Officers may work from the building during closed days.
A.5.1. FREQUENCY OF CLEANING.
Task Schedule:
a. Public Access Area: PRD HQ Conference Rooms/Lobby Monday, Wednesday, Friday
b. Public Access Area: Public Restroom Monday, Wednesday, Friday
c. West Staff Areas: Staff Offices, Conference room, Hallways and Conference Rooms– Monday Wednesday Friday
d. Staff Area: Breakroom– Monday, Wednesday, Friday
e. Staff Area: Janitorial Storage/Closet Monday Wednesday Friday
f. Staff Areas: East Staff Offices/Cubicles Monday Wednesday Friday
g. Staff Areas: East Staff Restrooms Monday Wednesday Friday
h. Breezeway/Pavilion Monday Wednesday Friday
i. Warehouse: Hallway, Shower Area, Restrooms Monday Wednesday Friday
Once the Contractor staff has cleared the BLM security background check, they shall schedule all cleaning operations to be completed between 6 a.m. and 10 p.m., during non-business hours. Contractor staff that have not completed a background check will need to schedule work with the COR during business hours. Contractor staff that cannot clear a BLM security background check will not be allowed on the premises. The Contractor may be working around staff and visitors. Changes to the work schedule shall be submitted for the Contracting Officer’s Representative’s approval at least three (3) days in advance when possible.
A.5.2. CHANGES OF BUSINESS HOURS. The BLM may change the normal work week, to accommodate overall mission needs, the business hours and days of operations for specified areas. The BLM will give at least a 30-day notice to the Contractor to adjust scheduling needs.
A.5.3. BUILDING CLOSURES.
A.5.3.1. FEDERAL HOLIDAYS. The Contractor is not expected to work on federal holidays. Refer to Attachment 4 - Work Schedule Calendars to verify which scheduled cleanings has been adjusted to the following or preceding day of a holiday or has been omitted as a need for the federal government.
Observed Federal Holidays:
New Year’s Day Martin Luther King Jr. Day Presidents’ Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day
A.5.3.2. OTHER. The facility may be closed due to local or national emergencies, federal shutdown, administrative closings, or similar government directed facility closings. The Government will provide immediate notification, when known, of facility closures to the Contractor. The contractor shall not charge the government for services not performed due to closures.
A.6. PERSONNEL. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. The Contractor shall notify the Contractor Liaison of changes of staffing personnel, and process background clearances promptly. Employees of the Contractor assigned for performance of this contract shall be capable employees with sufficient experience and training to assure compliance with the contract requirements. A fully qualified workforce shall be on board no later than the second week of the contract.
A.6.1. CONTRACTOR LIAISON. The Contractor or its designated representative shall contact the Contracting Officer’s Representative (COR) at least once a month to discuss work performance, alleviate any minor misunderstandings, and be available to take immediate action to have deficiencies corrected if required.
A.6.2. SUPERVISION. The Contractor is required to have a Project Supervisor or Manager who is responsible for the work performed under this contract. The Contractor shall give the COR the name and telephone number of the Project Supervisor or Manager who is responsible for the work under this contract at the onset of this contract and as changes are made.
A.7. CONDUCT OF PERSONNEL. The Contracting Officer may require the Contractor to remove from the job site any employee working under this contract for reasons of misconduct, security, or found to be or suspected to be under the influence of alcohol, drugs, or other incapacitating agent. Contract employee shall be subject to dismissal from the premises upon determination by the Contracting Officer that such action is in the best interests of the Government. Such removal from the job site or dismissal from the premises shall not relieve the Contractor of the requirement to provide sufficient personnel to perform the services as required by this PWS.
A.8. CONTRACTOR PERSONNEL SECURITY AND SUITABILITY REQUIREMENTS. Performance of this contract requires Contractor personnel to have a Federal Government-issued personal identification card before being allowed unsupervised access to a DOI facility. The BLM will be responsible for the costs incurred to acquire the initial 5 personnel security clearances. In the event the Contractor will require new or additional personnel, all costs incurred will be the responsibility of the Contractor. The Contracting Officer’s Representative (COR) will be the sponsoring official and will make the arrangements for personal identity verification and card issuance.
The Contractor, Contractor’s employees, and subcontractors, if any, must have security clearance forms completed and approved before the start of the of the contract. The following forms, or their equivalent, will be used to initiate the credentialing process:
· Standard Form 85 or 85P
· Optional Form 306
· Release to Obtain Credit Information
· PIV card application (web-based)
Contractor’s employees are required to give, and to authorize others to give, full, frank, and truthful answers to relevant and material questions needed to reach a suitability determination. Refusal or failure to furnish or authorize provision of information may constitute grounds for denial or revocation of credentials. Government personnel may contact the Contractor personnel being screened or investigated in person, by telephone or in writing, and the Contractor agrees to make them available for such contact.
Alternatively, if an individual has already been credentialed by another agency through Office of Personnel Management, and that credential has not yet expired, further investigation may not be necessary. Provide the COR with documentation that supports the individual’s status.
During performance of the contract, the Contractor will keep the COR apprised of changes in personnel to ensure that performance is not delayed by compliance with credentialing processes. Cards that have been lost, damaged, or stolen must be reported to the COR and Issuing Office within 24 hours. Replacement will be at the Contractor’s expense. If reissuance of expired credentials is needed, it will be coordinated through the COR.
At the end of contract performance, or when a Contractor employee is no longer working under this contract, the Contractor will ensure that all identification cards are returned to the COR. DOI Access cards are the property of the Federal Government. At the end of the contract performance, or when a Contractor employee is no longer working under this contract, the Contractor will ensure that all identification cards are returned to the COR. A DI 105 property form will be issued to each employee for each card and each set of keys.
Before starting work under this contract, a National Agency Check (NAC) will be conducted to verify the identity of the individual applying for clearance. Upon successful completion of the NAC process, an identification card will be issued, and access granted.
Simultaneously, a NAC with Inquiries (NACI) will be initiated to determine the individual’s suitability for the position. If the NACI adjudication is favorable, nothing more needs to be done. If the adjudication is unfavorable, the credentials will be revoked. In the event of a disagreement between the Contractor and the Government concerning the suitability of an individual to perform work under this contract, DOI shall have the right of final determination.
This requirement must be incorporated into any subcontracts that require sub-contractor personnel to have regular and routine unsupervised access to a Federally controlled facility for more than 180 calendar days or any unsupervised access to a Federally controlled Level 3 or 4 information systems.
A.9. ORGANIZATIONAL CONFLICT OF INTEREST. The Contractor shall not employ any employee of the Unites States Government or the Department of Interior if such employment may create a current or subsequent Organizational Conflict of Interest (OCI) as defined in Federal Acquisition Regulation Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event that the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary.
A.10. KEY/PIV CARD CONTROL. If the Contractor is provided with keys and/or PIV card to allow access to buildings and rooms requiring cleaning, they shall ensure the keys and/or PIV card are not lost or misplaced and are not used by unauthorized personnel. The Contractor shall not remove keys from the premises nor are these keys to be duplicated. All keys and/or PIV cards that are provided to the Contractor will be logged and signed for upon receipt. Keys and PIV cards shall be retained in possession of the Contractor until returned upon expiration of the contract. All keys and PIV cards lost by the Contractor’s personnel shall be reported to the COR immediately and shall be replaced at the Contractor’s expense.
A.11. SECURITY OF BUILDINGS. The Contractor shall be responsible for checking and securing buildings after performing services. Responsibility includes checking and locking exterior doors and turning off designated lights. Contractor may leave lights on in limited areas where Government employees are working after regular work hours.
A.12. SAFETY/KNOWLEDGE. The Contractor shall institute all necessary precautions for the control and safety of the Contractor personnel physically working on this contract.
A.12.1. FIRE PROTECTION AND PREVENTION. Prior to commencing work, the Contractor shall be acquainted with the location of the fire protection equipment, to assure that such equipment is available.
A.12.2. PERSONAL SAFETY. The Contractor shall be physically able to stand, move, bend, stretch, and knell during scheduled work in outside temperatures that get below freezing and above 100 degrees Fahrenheit.
A.12.3. KNOWLEDGE/SKILLS. The Contractor shall be proficient and knowledgeable in properly using and tracking various cleaning supplies, tools, material, and equipment. The Contractor is responsible for basic use/handling training of equipment to ensure industry life-span standards and protection against misuse.
A.13. INTERFERENCE WITH GOVERNMENT BUSINESS. The Contractor shall schedule and arrange work so as to cause the least interference with the normal occurrence of Government business and a mission. In those cases where some interference may be essentially unavoidable, the Contractor shall be responsible for making every effort to minimize the impact of the interference, inconvenience, and customer discomfort.
The Contractor shall prohibit their employees from disturbing papers on desks, opening desk drawers or cabinets or using telephone, computers or office equipment provided for official Government use.
A.14. PROTECTION OF GOVERNMENT PROPERTY. During the execution of work, the Contractor shall take special care to protect Government property including furniture, walls, baseboards, and other surfaces from materials not included. Accidental splashes shall be removed immediately. Workout equipment usage is off limits to the Contractor.
The Contractor shall report areas damaged to the COR immediately.
A.15. REPORTING.
A.15.1. BUILDING/MISCELLANEOUS REPORTING. The Contractor shall be aware of their working areas. Items in need of repair related to fixtures, faucets, leaks, toilet seats, doors, lighting, electrical, plumbing, government supplied items, etc. shall be reported immediately to onsite staff or the Contracting Officer or Representative for repair or correction.
A.15.2. EMERGENCY REPORTING. The Contractor shall require each employee to IMMEDIATELY report fires by calling 911 and the COR. Onsite emergencies, such as a broken pipe, burned out lighting, clogged toilet, should be reported to the COR immediately. Any incidents where the Contractor is harmed during work performance, should notify the COR within 24 hours of the incident. Names and phone numbers of the COR, or designee, shall be given to the Contractor.
A.15.3. LOST AND FOUND. The Contractor shall give or notify all articles found to the COR.
A.16. UTILITY CONSERVATION. The Contractor shall ensure that water, lights, and other electrical consumption preclude the waste of those utilities. Lights shall be on only in areas where and when work is being performed and water faucets or valves shall be turned off after the required usage has been accomplished.
SECTION B - DEFINITIONS
As used throughout this contract, the following terms shall have the meaning set forth below.
B.1. CLEAN. Clean, cleaning, or cleanup, as used in this contract, is the removal of any foreign material or matter, including but not limited to, candy and gum spots; dirt, mud or dust, scuff marks; oil or grease spots; and pencil, pen, or crayon marks in order to leave the surface free from dirt or impurities, unsoiled and unstained.
B.2. CONTRACTING OFFICER (CO). The Contracting Officer is a person with the authority to enter, administer, modify and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
B.3. CONTRACTING OFFICER’S REPRESENTATIVE (COR). The Government employee designated by the Contracting Officer to be responsible for monitoring the Contractors performance.
B.4. CONTRACTOR. The term Contractor refers to both the prime Contractor and any sub-contractors. The prime Contractor shall ensure that his/her sub-contractors comply with the provisions of this contract.
B.5. DISINFECT. Cleaning to destroy any harmful micro-organisms by application of an approved chemical agent.
B.6. POLICING. The preservation of acceptable conditions as described in Section E. It involves a conscientious visual inspection followed by subsequent cleaning or servicing as needed. For instance, if upon assessment, the restroom wall is free of dust, cobwebs, spots, stains, and encrustations as specified in Section E, no further action is needed. If that is not the case, some level of cleaning will need to be performed.
B.7. QUALITY ASSURANCE. A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
B.8. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document used for quality assurance surveillance. The document contains specific methods to perform surveillance of the Contractor for each task to be performed.
B.9. QUALITY CONTROL. A method used by the Contractor to contract the quality of goods and services received.
B.10. SPACE. An area to receive janitorial services, which may or may not be considered to be a room by common definition.
SECTION C - GOVERNMENT FURNISHED PROPERTY
In accordance with FAR 52.245-1 Government Property, the Government will provide the Contractor the following for use only in connection with this contract. The use of Government-furnished property for other purposes is prohibited.
C.1. GOVERNMENT-FURNISHED FACILITIES. The Government will furnish or make available to the Contractor one utility/storage area that will be used for storing needed equipment, material, and supplies. The Contractor shall be responsible and accountable for such facilities accepted for use and shall take adequate precautions to prevent floods or fire hazards, odors, and vermin. The Contractor shall not store equipment, material, or non-government supplies that are not in working condition. Any such modifications or alterations approved by the Government will be made at the expense of the Contractor. At the completion of the contract, all facilities shall be returned to the Government in the same condition as received, except for reasonable wear and tear. The Contractor shall be held responsible for the cost of any repairs caused by negligence or abuse on his/her part, or on the part of his/her employees.
C.2. GOVERNMENT FURNISHED EQUIPMENT & SUPPLIES. The Government will furnish the following equipment and supplies for use in those facilities provided by the Government and as may be required for the work to be performed under the contract: Recycling bags and Safety Data Sheet (SDS) binder. Equipment and supplies, when not in use, shall be stored in the provided storage area. Equipment and Supplies specified above will be furnished at no cost to the Contractor unless the Contractor is determined to be at fault of damaging or misusing equipment and supplies.
C.3. AVAILABILITY OF UTILITIES. The Government will furnish the following utility services at existing outlets, for use in those facilities provided by the Government and as may be required for the work to be performed under the contract: electricity, fresh water, dumpster. Information concerning the location of existing outlets may be obtained from the Contracting Officer’s Representative. Utilities specified above will be furnished at no cost to the Contractor.
SECTION D - CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES
The Contractor shall provide all equipment, materials, supplies, and services to perform the requirements that are not listed under Section C of this PWS. Materials, equipment, and supplies provided by the Contractor shall meet the requirements below. “Green” cleaning/disinfectant liquids, hand soap, toilet tissue, paper towels, trash/waste receptacle liners, feminine hygiene receptacle liners, disposable toilet seat covers, stainless steel cleaner, and Items not listed shall be of acceptable commercial grade and quality. The Contractor must label their own equipment and supplies to differentiate from Government furnished items. Cleaning chemicals that are not certified “green” and/or not contained within the Safety Data Sheets may not be stored on site.
D.1. MATERIAL/SUPPLY REQUIREMENTS. Janitorial supplies, materials and equipment shall meet all “green” purchasing requirements to include non-hazardous cleaners and disinfectants, and recycled content in all paper products as well as meet the requirements specified herein. All cleaning containers shall be labeled with its contents and the Contractor shall not use a labeled container for storing contents which the container is not labeled for. The Contractor shall keep track of needed supplies to eliminate performance disruptions.
D.2. RESTROOM SUPPLIES. No chemicals, materials, or combination of chemicals or materials shall be used that will damage walls, floors, or fixtures in the process of cleaning. Cloth or any other linen material or paper towels used for cleaning purposes shall not be disposed of by flushing down the toilet.
D.3. WASTE DISPOSAL. The facility has a dumpster onsite for waste/trash removal, collected by the Contractor while onsite. The facility also has recycling bins to deposit appropriately bagged recycling material into. The Contractor is responsible for removing waste/trash and recycling from the site and dispose of it at an appropriate receptacle.
SECTION E – LOCATION & SCOPE OF WORK
The Contractor shall provide the janitorial services in the following locations as described herein. Areas within E.1.1. and E.1.2., will be considered Visitor Service Areas. Areas within E.1.3. E.1.4, E.1.5., E.1.6., E.1.7., and E.1.8 will be considered Staff Areas.
E.1. STRUCTURES
E.1.1. Public Access Area: Conference Rooms and Lobby. The Lobby is comprised of approximately 850 square feet of concrete flooring in the rotunda for guest services, and approximately 1100 square feet of carpeted space for the conference rooms. Additionally, there is an inside double floating stainless steel drinking fountain located near the North entry/exit of the building.
E.1.2. Public Access Area: Public Restrooms. The Public Restrooms consists of a men’s and a women’s restroom, totaling approximately 400 square feet of tile floor and wall space.
E.1.2.1 Men’s Restroom: 2 flush toilet, 2 flush urinal, 2 sinks, 1 mirror, 2 liquid soap dispensers, 1paper-towel dispenser and waste/trash receptacle, and 1 baby changing station.
E.1.2.2 Women’s Restroom: 3 flush toilet, 3 feminine hygiene receptacles, 2 sinks, 1 mirrors, 2 liquid soap dispensers, 1 paper-towel dispenser and waste/trash receptacle, and 1 baby changing station.
Staff Areas:
E.1.3. West Staff Offices and Hallways. Includes three private offices, three cubicle spaces, an open office space, two conference rooms and hallways. These spaces are used by staff to conduct daily business practices. Cleanable area is approximately 2100 square feet, 1400 square feet of carpet, 700 square feet of stained concrete. Each office and conference room contains waste receptacles.
E.1.4. Breakroom and outdoor sitting area. Cleanable area is approximately 290 square feet and excludes the outdoor sitting area. 3 fridges, 1 double sink, counters, cabinetry, indoor and outdoor tables, inside and outside waste/trash receptacles and recycling bins.
E.1.5 Janitorial Storage/Closets: 1 janitorial sink, and 100 square feet.
E.1.6 East Staff Offices and Common Areas. Includes five private offices, cubicle spaces, an open office space, and hallways. These spaces are used by staff to conduct daily business practices. Cleanable area is approximately 7400 square feet, 620 square feet of carpet, 6800 square feet of stained concrete. Each office, cubicle and common areas contain waste receptacles.
E.1.7 East Staff Restrooms: Located in the hallway nearest to the east exit to the breezeway. Cleanable area is approximately 84 square feet with tile flooring.
E.1.7.1 Men’s Restroom: 1 flush toilet, 1 sink, 1 mirror, 1 liquid soap dispenser, 1 stainless-steel paper-towel dispenser, and a standalone waste basket.
E.1.7.2 Women’s Restroom: 1 flush toilet, 1 sink, 1 mirror, 1 liquid soap dispenser, 1 stainless-steel paper-towel dispenser, 1 feminine hygiene receptacle, a standalone waste basket and a storage cabinet.
E.1.8 Breezeway/Pavilion Area: The Breeze Way connecting the East Staff Offices and the Warehouse. There are picnic tables and an outside waste receptacle.
Warehouse
E.1.9. Warehouse. Within the warehouse are two restrooms, shower/locker room, hallway and a stainless-steel water fountain. Cleanable area is approximately 170 square feet of tile and approximately 220 square feet of stained concrete.
E.1.9.1 Hallway: 1 drinking fountain with bottle filler and one refrigerator
E.1.9.2 Men’s Restroom: 1 flush toilet, 1 sink, 1 mirror, 1 liquid soap dispenser, 1 stainless-steel paper-towel dispenser, and a standalone waste basket.
E.1.9.3 Women’s Restroom: 1 flush toilet, 1 sink, 1 mirror, 1 liquid soap dispenser, 1 stainless-steel paper-towel dispenser, 1 feminine hygiene receptacle and a standalone waste basket.
E.1.9.4 Shower/Locker Room: 1 shower, bench, and lockers.
E.2. SERVICE REQUIREMENTS & STANDARDS.
The Contractor shall provide the janitorial services described herein. Basic services shall be performed at the locations and frequencies are shown in each Quality Assurance Surveillance Plan for each individual building and shall consist of the services listed for the specified building. No chemical or cleaning compound shall be used that will damage the item being cleaned or surrounding items. The Contractor shall ensure all equipment and supplies are returned to their original position and location after cleaning. Performance requirements for these services include the following:
PUBLIC ACCESS AREAS:
E.2.1. PRD HQ Conference Rooms (Ponderosa, Cottonwood)/Lobby.
E.2.1.1. ENTRY/EXIT/OFFICE DOORS, HANDLES/KNOBS/CRASH-BAR, DOOR AND DOOR-WAY WINDOW/GLASS. The Contractor shall clean/disinfect all surfaces, and all surfaces shall be free of watermarks, scuffs, residue, and any other foreign material. Glass shall be cleaned and free of marks, smudges, fogginess, and streaks.
E.2.1.2. DRINKING FOUNTAINS. The Contractor shall clean/disinfect and keep fountains free from watermarks, residue, stains, streaks, scale, debris, and all other removable materials.
E.2.1.3. CONCRETE FLOORS. The Contractor shall clean the surface of concrete, floor mats/rugs, and under mats/rugs, are to be visually clean and free of odor, soil, mud, dust, dirt, debris, residue, gum, tar, standing liquids, mop marks, water stains, and foreign matter, etc. The Contractor shall remove smudge marks, or spots, etc. without causing discoloration. The Contractor shall not leave dust, residue, streaks, spots, smudges, etc. in corners, crevices, or on the molding/baseboards. Conditioner shall be applied bi-weekly.
E.2.1.4. CARPET FLOORS. The Contractor shall clean the surface of carpet, rugs, and office mats, and under rugs and mats, to be visually clean and free of odor, soil, mud, dust, dirt, debris, residue, gum, tar, and foreign matter, etc. The Contractor shall remove smudge marks, or spots, etc. without causing discoloration. The Contractor shall not leave dust, streaks, oils, spots, smudges, etc. in corners, crevices, or on the molding/baseboards.
E.2.1.5. WASTE FIXTURES. The Contractor shall empty all waste containers, replace plastic liners, and clean waste fixtures. Any plastic liner with food waste or that is soiled, or leaking shall be replaced with a new plastic liner. Waste that falls on the floor and outside grounds during the waste removal shall be picked up and disposed of by the Contractor.
E.2.1.6. HORIZONTAL & VERTICAL SURFACES. The Contractor shall clean/dust all horizontal and vertical surfaces of furniture (e.g. chairs, partitions, etc.) windowsills, shelves, bookcases, cabinetry, counter tops, tabletops, glass tops, fire extinguisher, pictures, molding/baseboards, etc. The Contractor shall not leave streaks, oils, spots, smudges, etc. on the surfaces after cleaning.
E.2.2. PUBLIC RESTROOMS
E.2.2.1. ENTRY/EXIT DOORS, STALL PARTIONS AND HANDLES. All surfaces shall be dusted, clean/disinfected and free of watermarks, scum, mold, residue, and any other foreign material.
E.2.2.2. TILE FLOORS. The Contractor shall sweep/wet mop floors to clean/disinfect surfaces from spills, trash, and foreign matter, dirt, stains, spots, residue, debris, water puddles and streaks, mop marks, string gum, grease, tar, etc. The Contractor shall clean to prevent and maintain textured tile surfaces from collecting dirt, grime, etc. in the ridges.
E.2.2.3. TOILET AREA. The Contractor shall clean/disinfect surfaces, inside/outside of toilet bowls, seat cover(s), and flushing handles. Toilet bowl should be free of scale, scum, mineral deposits, stains, streaks, and all foreign matter.
E.2.2.4. SINK AREA. The Contractor shall clean/disinfect surfaces, metallic fixtures, wash basins, backsplashes, electric dryer, exposed pipes, mirrors and shall be free from dust, cobwebs, spots, stains, mold, encrustations, or excess moisture.
E.2.2.5. SERVICING/DISPENSERS. The Contractor shall service each dispenser for toilet paper, paper towels and hand soap, ensuring it is filled with supplies sufficient to last through to the next cleaning.
E.2.2.6. WASTE FIXTURES/RECEPTACLES. The Contractor shall empty waste containers, feminine hygiene receptacles, replace liners, and clean fixtures/receptacles. Any plastic liner with food waste or that is soiled, or leaking shall be replaced with a new plastic liner. Waste that falls on the floor and outside grounds during the waste removal shall be picked up and disposed of by the Contractor.
E.2.2.7. BABY CHANGING STATIONS. The Contractor shall clean/disinfect surfaces, inside/outside of changing station, and shall be free of dust, cobwebs, spots, stains, and encrustations.
STAFF AREAS:
E.2.3. West Staff Offices and Hallways
E.2.3.1. ENTRY/EXIT/OFFICE DOORS, HANDLES/KNOBS/CRASH-BAR, DOOR AND DOOR-WAY WINDOW/GLASS. The Contractor shall clean/disinfect all surfaces, and all surfaces shall be free of watermarks, scuffs, residue, and any other foreign material. Glass shall be cleaned and free of marks, smudges, fogginess, and streaks.
E.2.3.2. CARPET FLOORS. The Contractor shall clean the surface of carpet, rugs, and office mats, and under rugs and mats, to be visually clean and free of odor, soil, mud, dust, dirt, debris, residue, gum, tar, and foreign matter, etc. The Contractor shall remove smudge marks, or spots, etc. without causing discoloration. The Contractor shall not leave dust, streaks, oils, spots, smudges, etc. in corners, crevices, or on the molding/baseboards.
E.2.3.3. CONCRETE FLOORS. The Contractor shall clean the surface of concrete, floor mats/rugs, and under mats/rugs, are to be visually clean and free of odor, soil, mud, dust, dirt, debris, residue, gum, tar, standing liquids, mop marks, water stains, and foreign matter, etc. The Contractor shall remove smudge marks, or spots, etc. without causing discoloration. The Contractor shall not leave dust, residue, streaks, spots, smudges, etc. in corners, crevices, or on the molding/baseboards. Conditioner shall be applied bi-weekly.
E.2.3.4. WASTE RECEPTACLES. The Contractor shall empty waste containers, replace plastic liners, and clean receptacles that are inside/outside the Breakroom. Any plastic liner with food waste or that is soiled, or leaking shall be replaced with a new plastic liner. Waste that falls on the floor and outside grounds during the waste removal shall be picked up and disposed of by the Contractor.
E.2.3.5. HORIZONTAL & VERTICAL SURFACES. The Contractor shall clean/dust all horizontal and vertical surfaces of furniture (e.g. chairs, partitions, etc.) windowsills, shelves, bookcases, cabinetry, counter tops, tabletops, glass tops, fire extinguisher, pictures, molding/baseboards, etc. The Contractor shall not leave streaks, oils, spots, smudges, etc. on the surfaces after cleaning.
E.2.4. BREAKROOM AND OUTDOOR SEATING
E.2.4.1. ENTRY/EXIT/DOORS, HANDLES/KNOBS/CRASH-BAR, DOOR AND DOOR-WAY WINDOW/GLASS. The Contractor shall clean/disinfect all surfaces, and all surfaces shall be free of watermarks, scuffs, residue, and any other foreign material. Glass shall be cleaned and free of marks, smudges, fogginess, and streaks.
E.2.4.2. CONCRETE FLOORS. The Contractor shall clean the surface of concrete, floor mats/rugs, and under mats/rugs, are to be visually clean and free of odor, soil, mud, dust, dirt, debris, residue, gum, tar, standing liquids, mop marks, water stains, and foreign matter, etc. The Contractor shall remove smudge marks, or spots, etc. without causing discoloration. The Contractor shall not leave dust, residue, streaks, spots, smudges, etc. in corners, crevices, or on the molding/baseboards. Conditioner shall be applied bi-weekly.
E.2.4.3. HORIZONTAL & VERTICAL SURFACES. The Contractor shall clean/dust all horizontal and vertical surfaces of furniture (e.g. chairs, partitions, etc.), appliances, windowsills, cabinetry, counter tops, tabletops, glass tops, fire extinguisher, pictures, molding/baseboards, etc. The Contractor shall not leave streaks, oils, spots, smudges, etc. on the surfaces after cleaning.
E.2.4.4. INDOOR/OUTDOOR WASTE RECEPTACLES AND RECYCLING BINS. The Contractor shall empty waste and recycling containers, replace plastic liners, and clean receptacles that are inside/outside the Breakroom. Any plastic liner with food waste or that is soiled, or leaking shall be replaced with a new plastic liner. Waste that falls on the floor and outside grounds during the waste removal shall be picked up and disposed of by the Contractor.
E.2.4.5. PICNIC TABLES. The Contractor shall clean surfaces, removing trash, spills, residue, and other foreign matter from the outside breakroom picnic tables.
E.2.5. JANITORIAL STORAGE/CLOSETS.
E.2.5.1. FLOORS, WALLS, AND CEILINGS. The Contractor shall ensure the floors, walls and ceilings are free of trash, spills, standing liquids, dust, cobwebs, and foreign matter.
E.2.5.2. ORGANIZED. The Contractor shall keep equipment, material, binder, and supplies in clean working condition and store them in an organized manner.
E.2.6. EAST STAFF OFFICES AND COMMON AREA
E.2.6.1. ENTRY/EXIT/OFFICE DOORS, HANDLES/KNOBS/CRASH-BAR, DOOR AND DOOR-WAY WINDOW/GLASS. The Contractor shall clean/disinfect all surfaces, and all surfaces shall be free of watermarks, scuffs, residue, and any other foreign material. Glass shall be cleaned and free of marks, smudges, fogginess, and streaks.
E.2.6.2. CARPET FLOORS. The Contractor shall clean the surface of carpet, rugs, and office mats, and under rugs and mats, to be visually clean and free of odor, soil, mud, dust, dirt, debris, residue, gum, tar, and foreign matter, etc. The Contractor shall remove smudge marks, or spots, etc. without causing discoloration. The Contractor shall not leave dust, streaks, oils, spots, smudges, etc. in corners, crevices, or on the molding/baseboards.
E.2.6.3. CONCRETE FLOORS. The Contractor shall clean the surface of concrete, floor mats/rugs, and under mats/rugs, are to be visually clean and free of odor, soil, mud, dust, dirt, debris, residue, gum, tar, standing liquids, mop marks, water stains, and foreign matter, etc. The Contractor shall remove smudge marks, or spots, etc. without causing discoloration. The Contractor shall not leave dust, residue, streaks, spots, smudges, etc. in corners, crevices, or on the molding/baseboards. Conditioner shall be applied bi-weekly.
E.2.6.4. WASTE RECEPTACLES. The Contractor shall empty waste containers, replace plastic liners, and clean receptacles. Any plastic liner with food waste or that is soiled, or leaking shall be replaced with a new plastic liner. Waste that falls on the floor and outside grounds during the waste removal shall be picked up and disposed of by the Contractor.
E.2.6.5. HORIZONTAL & VERTICAL SURFACES. The Contractor shall clean/dust all horizontal and vertical surfaces of furniture (e.g. chairs, partitions, etc.) windowsills, shelves, bookcases, cabinetry, counter tops, tabletops, glass tops, fire extinguisher, pictures, molding/baseboards, etc. The Contractor shall not leave streaks, oils, spots, smudges, etc. on the surfaces after cleaning.
E.2.7. East Staff Restrooms
E.2.7.1. ENTRY/EXIT DOORS, AND HANDLES. All surfaces shall be clean/disinfected and free of watermarks, scum, mold, and any other foreign material.
E.2.7.2. TILE FLOORS. The Contractor shall sweep/wet mop floors to clean/disinfect surfaces from spills, trash, and foreign matter, dirt, stains, spots, residue, debris, water puddles and streaks, mop marks, string gum, grease, tar, etc. The Contractor shall clean to prevent and maintain textured tile surfaces from collecting dirt, grime, etc. in the ridges.
E.2.7.3. TOILET AREA. The Contractor shall clean/disinfect surfaces, inside/outside of toilet bowls, seat cover(s), and flushing handles. Toilet bowl should be free of scale, scum, mineral deposits, stains, streaks, and all foreign matter.
E.2.7.4. SINK AREA. The Contractor shall clean/disinfect surfaces, metallic fixtures, wash basins, backsplashes, electric dryer, exposed pipes, mirrors and shall be free from dust, cobwebs, spots, stains, mold, encrustations, or excess moisture.
E.2.7.5. SERVICING/DISPENSERS. The Contractor shall service each dispenser for toilet paper, paper towel and hand soap, ensuring it is filled with supplies sufficient to last through to the next cleaning.
E.2.7.6. WASTE FIXTURES. The Contractor shall empty all waste containers, replace plastic liners, and clean waste fixtures. Any plastic liner with food waste or that is soiled, or leaking shall be replaced with a new plastic liner. Waste that falls on the floor and outside grounds during the waste removal shall be picked up and disposed of by the Contractor.
E.2.8. BREEZE-WAY/PAVILLION AREA
E.2.8.1. ENTRY/EXIT/DOORS, HANDLES/KNOBS/CRASH-BAR, DOOR AND DOOR-WAY WINDOW/GLASS. The Contractor shall clean/disinfect all surfaces, and all surfaces shall be free of watermarks, scuffs, residue, and any other foreign material. Glass shall be cleaned and free of marks, smudges, fogginess, and streaks.
E.2.8.2 PICNIC TABLES. The Contractor shall clean surfaces, removing trash, spills, residue, and other foreign matter from the outside breakroom picnic tables.
E.2.8.3. WASTE RECEPTACLES. The Contractor shall empty waste containers, replace plastic liners, and clean receptacles that are inside/outside the Breakroom. Any plastic liner with food waste or that is soiled, or leaking shall be replaced with a new plastic liner. Waste that falls on the floor and outside grounds during the waste removal shall be picked up and disposed of by the Contractor.
Warehouse
E.2.9. Hallway, Shower Area, Restrooms
E.2.9.1. ENTRY/EXIT/OFFICE DOORS, HANDLES/KNOBS/CRASH-BAR, DOOR AND DOOR-WAY WINDOW/GLASS. The Contractor shall clean/disinfect all surfaces, and all surfaces shall be free of watermarks, scuffs, residue, and any other foreign material. Glass shall be cleaned and free of marks, smudges, fogginess, and streaks.
E.2.9.2. CONCRETE FLOORS. The Contractor shall clean the surface of concrete, floor mats/rugs, and under mats/rugs, are to be visually clean and free of odor, soil, mud, dust, dirt, debris, residue, gum, tar, standing liquids, mop marks, water stains, and foreign matter, etc. The Contractor shall remove smudge marks, or spots, etc. without causing discoloration. The Contractor shall not leave dust, residue, streaks, spots, smudges, etc. in corners, crevices, or on the molding/baseboards. Concrete Conditioner shall be applied bi-weekly.
E.2.9.3. DRINKING FOUNTAINS. The Contractor shall clean/disinfect and keep fountains free from watermarks, residue, stains, streaks, scale, debris, and all other removable materials.
E.2.9.4. TILE FLOORS. The Contractor shall sweep/wet mop floors to clean/disinfect surfaces from spills, trash, and foreign matter, dirt, stains, spots, residue, debris, water puddles and streaks, mop marks, string gum, grease, tar, etc. The Contractor shall clean to prevent and maintain textured tile surfaces from collecting dirt, grime, etc. in the ridges.
E.2.9.5. TOILET AREA. The Contractor shall clean/disinfect surfaces, inside/outside of toilet bowls, seat cover(s), and flushing handles. Toilet bowl should be free of scale, scum, mineral deposits, stains, streaks, and all foreign matter.
E.2.9.6. SINK AREA. The Contractor shall clean/disinfect surfaces, metallic fixtures, wash basins, backsplashes, electric dryer, exposed pipes, mirrors and shall be free from dust, cobwebs, spots, stains, mold, encrustations, or excess moisture.
E.2.9.7. SERVICING/DISPENSERS. The Contractor shall service each dispenser for toilet paper, paper towel and hand soap, ensuring it is filled with supplies sufficient to last through to the next cleaning.
E.2.9.8. WASTE RECEPTACLES. The Contractor shall empty waste containers, replace plastic liners, and clean receptacles. Any plastic liner with food waste or that is soiled, or leaking shall be replaced with a new plastic liner. Waste that falls on the floor and outside grounds during the waste removal shall be picked up and disposed of by the Contractor.
E.2.9.9. SHOWER AREA. The Contractor shall clean/disinfect surfaces, inside/outside of shower entrance, the floor, walls, niche, ledges, and handles/knobs. The shower tile, plastic, glass should be free of scale, scum, mineral deposits, stains, streaks, and all foreign matter. The floor drain shall be free from dirt, rust, and encrustations.
E.2.9.10. HORIZONTAL & VERTICAL SURFACES. The Contractor shall clean/dust all horizontal and vertical surfaces of furniture (e.g. chairs, partitions, etc.) windowsills, shelves, bookcases, cabinetry, counter tops, tabletops, glass tops, fire extinguisher, pictures, molding/baseboards, etc. The Contractor shall not leave streaks, oils, spots, smudges, etc. on the surfaces after cleaning.
E.2.10. SEMI-ANNUAL TASK SERVICES. Cleaning services are performed twice during the contract base year and each option year. The Contractor shall schedule and perform services between January/February and July/August of each year and then inform the COR after completion for inspection.
E.2.10.1. INTERIOR GLASS CLEANING: The Contractor shall clean glass to be visibly free of dirt, smudges, streaks, watermarks, spots, residue, and shall not be cloudy. Windowsills, woodwork, window frames, sashes, and any other surroundings of the interior glass shall be wiped free of water drippings, watermarks, dirt, insects, spots, and foreign matter. Interior glass cleaning shall be done at the same time as the exterior glass cleaning is performed.
E.2.10.2. Floor Conditioning (Polished Concrete Floors).
Floors shall be thoroughly cleaned using L&M Construction Chemicals Inc, FGS Concrete Conditioner. Concrete Conditioner shall be applied bi-weekly by use of wet mop or brush and semi-annually by use of mechanical walk-behind scrubber with soft scrubbing pads.
E.2.10.3. EXTERIOR GLASS CLEANING: The Contractor shall clean glass to be visibly free of dirt, smudges, streaks, watermarks, spots, residue, and shall not be cloudy.
E.2.10.4. PUBLIC ACCESS AREA CARPET EXTRACTION/SHAMPOO CLEANING: The Contractor shall extract/shampoo clean carpets, lobby mats and rugs to remove embedded dirt, soil, grime, etc. within the material fibers. Carpet area must be cleaned under floor mats and rugs as well. This work shall be performed in the cottonwood and Ponderosa conference rooms. Cleaning chemicals should leave carpets with a neutral odor. The Contractor shall move and return furniture to their original location. Systems furniture, desks, partitions, or modular furniture will remain in place.
E.2.10.5. WALLS AND CEILINGS. The Contractor shall clean walls, ledges, and ceilings free of dust, cobwebs, spots, stains, and encrustations.
E.2.11. ANNUAL TASK SERVICES. Cleaning services are performed once during the contract base year and each option year. The Contractor shall schedule and perform services between July/August of each year and then inform the COR after completion for inspection.
E.2.11.1. STAFF AREA CARPET SHAMPOO / WET EXTRACTION CLEANING: The Contractor shall shampoo / wet extraction clean carpets, lobby mats and rugs to remove embedded dirt, soil, grime, etc. within the material fibers within all carpeted areas not covered under 2.10.4. Carpet area must be cleaned under floor mats and rugs as well. Cleaning chemicals should leave carpets with a neutral odor. The Contractor shall move and return furniture to their original location. Systems furniture, desks, partitions, or modular furniture will remain in place.
E.2.11.2. DETAIL GROUT CLEANING: The Contractor shall ensure all floor and floor-base grout lines in buildings, and restrooms are cleaned/scrubbed to return original color, removing buildup of dirt, grime, stains, etc.
E.3. OPTIONAL – INITIAL TILE & GROUT CLEANING. The COR may contact the Contractor for additional services to regularly scheduled services or outside of reasonable, normal requirements. Timeframe/response will be set by the COR. The Contractor shall perform services according to E.2.11.3. Service Requirements & Standards. Optional Initial Tile & Grout Cleaning services are not to be completed during normally scheduled work. Optional Initial Tile & Grout Cleaning are not a guarantee of work from the Government.
E.4. OPTIONAL TASK SERVICES. The COR may contact the Contractor for emergency service and/or additional services to regularly scheduled services or outside of reasonable, normal requirements. Optional Task Service are not for use for performance challenges and/or inadequate performance by the Contractor. Timeframe/response will be set by the COR. The Contractor shall perform services according to E.2. Service Requirements & Standards. Optional Task Services are not a guarantee of work from the Government.
SECTION F – CONTRACTOR QUALITY CONTROL
F.1. QUALITY CONTROL. The Contractor shall maintain effective quality control to ensure services are performed in accordance with this PWS. The Contractor’s quality control is a mean by which he/she assures themselves that their work complies with the requirement of the contract.
SECTION G – GOVERNMENT QUALITY ASSURANCE AND INSPECTION
G.1. QUALITY ASSURANCE PLAN. The government will utilize the Quality Assurance Surveillance Plan for Glendale Contact Station Janitorial found in ATTACHMENT 3 to establish procedures and guidelines in ensuring the required performance standards or services levels are achieved by the contractor.
G.2. PERFORMANCE REQUIREMENTS SUMMARY. ATTACHMENT 5 Performance Requirements Summary lists performance objectives, standards set forth in Section E, Acceptable Quality Level to include frequency of service, error tolerance, and method and frequency of inspections, and remediation. The Contractor is to meet or exceed the standards set forth in Section E and in the Performance Requirements Summary. Conduct of work shall indicate deliberate effort to produce first-quality results. Hasty or careless work is not acceptable. If service performance is unsatisfactory or not completed per the QASP, then a percentage of the monthly payment will be withheld based on the remediation %, at a minimum of 1%.
G.3. QUALITY ASSURANCE SURVIELLENCE MONITORING FORM / INSPECTION SHEET. The Government shall evaluate the Contractor’s performance under this contract in accordance with the QASP. The Government will utilize the janitorial inspection sheet found in ATTACHMENT 6 to document quality of services provided.
SECTION H – INVOICING
H.1. Payment requests can be submitted monthly and must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP). "Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice and avoid invoice rejection, the payment request must comply with the requirements below. The IPP website address is: https://www.ipp.gov.
The following information is required to be included on the commercial invoice attached to the IPP invoice:
(1) Invoice Number, Invoice Date and Government Contract Number
(2) Billing period is specified with beginning and ending dates. The beginning date must not be later than the completion date or within any previous billing dates.
(3) Accounting must follow the approved schedule of values as described in the specification attachment.
(4) Total amount due for the billing period
SECTION I – ATTACHMENTS.
| ATTACHMENT 1 |
| - |
| Bid Schedule |
| ATTACHMENT 2 |
| - |
| PWS |
| ATTACHMENT 3 |
| - |
| QASP |
| ATTACHMENT 4 |
| - |
| Cleaning Schedule |
| ATTACHMENT 5 |
| - |
| PRS |
| ATTACHMENT 6 |
| - |
| Inspection Sheet |
| ATTACHMENT 7 |
| - |
| Photos |
Page 1 | 1
File details come from the government source that posted it. Updated .