A04_Airstrip_Mesquite_Thin_SOW.doc
DOC document 18 MB Posted
- Solicitation number
- 140L6425Q0038
About this file
This document is a Statement of Work (SOW) for a Bureau of Land Management (BLM) grassland restoration project involving mechanical mesquite reduction in the Las Cienegas National Conservation Area (LCNCA). The project requires a contractor to mechanically grub and remove regrowth mesquite trees across 719 acres in the Airstrip treatment unit, leaving small clusters of trees 12 feet or taller. Contractors must use four-wheel drive equipment with a minimum of 96 hp, a 12" bucket, and specific digging force capabilities to remove mesquite trees and root balls, with work to be completed between October 1 and June 30th annually.
Proposal submissions will be evaluated based on three previously completed similar contracts, equipment specifications, technical approach, quality control plan, and cost per acre. The solicitation is a Total Small Business set-aside restricted to qualified small business entities, with proposals due by September 18, 2025. The project falls under NAICS code 115310 (Support Activities for Forestry) and PSC category F014 (Natural Resources/Conservation - Tree Thinning), and is located in Pima County, Arizona. Contractors must adhere to safety guidelines, particularly given the project's proximity to the international border, and will be responsible for providing all necessary equipment, labor, and materials.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L6425Q0038_Amd_0001.pdf | ||
| LCNCA_FY25_Mechanical_Aerial_0001.zip | ZIP file | |
| C_P_Under_SAT-.docx | DOCX document | |
| B08__Value_Bid_Schedule.docx | DOCX document | |
| WD_Pima.txt | TXT text file | |
| B04_Instructions_to_Offerors.docx | DOCX document | |
| Sol_140L6425Q0038.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Las Cienegas National Conservation Area
Grassland Restoration Project Mechanical Mesquite Reduction Airstrip Treatment Unit Statement of Work
Background and General Scope A. General Scope The Bureau of Land Management (BLM) is seeking to perform a mechanical mesquite reduction treatment on approximately 719 acres in the Airstrip treatment unit, within the Las Cienegas National Conservation Area (LCNCA). The retreatment unit is on lands under the jurisdiction of the BLM and is generally located in T19S R17E S3,4,8,9,10,17 (see Appendix B). This treatment will be implemented using a service contract.
B. Background
The BLM is implementing a grassland restoration project on the LCNCA, one aspect of the restoration project is mesquite reduction. The current method of mesquite reduction is mechanically grubbing the mesquite out of the ground with equipment. This includes removal of the root ball from the ground and ensuring that all roots are broken or severed from the root ball. The Airstrip treatment unit was initially mechanically thinned in 2011. The retreatment will target the new growth mesquite within the unit while leaving the older growth mesquite.
Work to be Performed The contractor may utilize rubber-tired or tracked equipment to grub and remove all visible regrowth mesquite trees and stumps found within the treatment unit. The contractor will windrow grubbed mesquite across the treatment unit.
A. Grubbing
· Rubber-tired or tracked equipment will be utilized to grub all visible mesquite trees found within the treatment unit, leaving small clusters of 12 foot or taller mesquite trees (4-5 per acre).
· Remove root ball from the ground ensuring that all roots are broken or severed from the root ball.
· Back fill any holes generated from the grubbing process to ensure that no holes are deeper than 6 inches.
· Loosely place slash in a windrow.
· The unit is a total of 719 acres with an estimated tree density break out of:
· 719 acres: 100-200 trees per acre, generally 6 ft tall and under.
Equipment Requirements The BLM requires the following equipment specifications as a minimum standard for equipment capabilities, these requirements will allow for sufficient equipment capabilities to handle size class of trees:
· Four wheel drive.
· Enclosed cab.
· 96 hp.
· Digging force-bucket 14,800 lbs.
· Digging force-crowd 8700 lbs.
· 12” bucket or narrowest bucket available for equipment.
· Toothed, heavy duty bucket Site Visit
This area is accessible to the public and it is highly encouraged that you visit the area in order to adequately develop your proposals.
Safety Concerns
The contractor will be responsible for completing the contract in a safe and effective manner that is consistent with any applicable safety regulations, polices, or guidelines. The project area falls within the international border watchout zone see appendix C. for border watch out guidelines.
Cultural Concerns
If any cultural artifacts are uncovered during the grubbing process the contractor will immediately stop digging and contact the BLM Contracting Officer’s Representative (COR). The COR will coordinate with the BLM archaeologist if artifacts are uncovered.
Any known areas of cultural concern will be identified (flagged or marked) prior to the start of the contract. These areas will be excluded from any ground disturbance. A georeferenced map will be provided by the BLM upon award.
Deliveries and Performance
The Contractor shall perform in accordance with the specifications of this contract.
Schedule and Calendar
Work can be completed between Oct 1 and June 30th every year.
In the event the timeline may not be met due to adverse weather conditions, and/or circumstances outside of the control of the Contractor, extra time may be added to portions of the field work phase (grubbing). The Contractor will be required to inform the COR of any circumstances that may require an extended amount of time. All extensions will be granted on a case-by-case basis at the CO’s discretion, after coordination between the CO and the Contractor.
Deliverables
Evaluation Criteria
The contractor shall deliver the following as a part of their quote for grubbing mesquite and windrowing slash on unit.
· Example of three previously completed contracts of a similar magnitude and nature.
· Example of the type and number of equipment to be used for grubbing of mesquite (description of equipment make, model, and capabilities).
· Provide a brief description of the technical approach to mechanically thinning the unit and a description of the Quality Control Plan to be used.
· Cost per acre to grub and windrow all the visible mesquite from the treatment unit. Cost proposal should include total cost and cost per acre along with a lined item cost breakdown.
Implementation
The Contractor shall deliver the following during implementation of the contract:
· Grubbing of 100% of visible mesquite trees, leaving small clusters of 12 foot or taller mesquite trees (4-5 per acre).
Government Furnished Property The contractor is responsible for supplying all equipment, labor, supplies, materials, etc needed to complete the contract. The BLM will not furnish any equipment, supplies, materials, or labor. The BLM will provide georeferenced maps of the treatment units.
Coordination
The Contractor shall coordinate closely with the assigned BLM Contracting Officer’s Representative (COR) and assigned Project Inspectors (PI) throughout the duration of the project, per the developed timeline and schedule. A pre-work conference will be required at the prior to contract implementation.
The contractor will coordinate with the BLM COR/PI daily or an as needed basis. Progress will be tracked using GPS units to count the number of acres completed. The contractor and the BLM COR/PI will establish a schedule of progress tracking during the pre-work conference. A completed acre is defined as an acre where all regrowth mesquite has been grubbed and windrowed according to contract specifications.
COR/PI Contact info Daniel Quintana
COR
928 651 4470 cell dquintan@blm.gov Michael Gustafson
COR/PI
520 909 4664 cell mgustafson@blm.gov
Appendix A. Photos of mesquite in treatment unit.
Photo 1. Example of mesquite density and size 100+ stems/ac.
Photo 2. Example of mesquit density and size 100+ stems/ac.
Photo 3. Example of mesquite density and size 100+ stems/ac.
Photo 4. Example of mesquite density and size 100+ stems/ac.
Appendix B. Project Maps
Map 1. Airstrip Treatment Unit Land Status Map 2. Airstrip treatment unit
Map 3. Airstrip treatment unit vicinity
Appendix C.
BORDER WATCHOUTS
1.
Be aware of your surroundings at all times.
2.
Expect other drivers to be distracted. Reckless and unsafe driving is common by those engaged in illegal activity.
3.
Radio and cell phone dead areas increase risks. Radio frequency interference from Mexico is likely. Cell phone connections to Mexico are likely. When in Watchout Areas, check out and use the satellite cell phones
4.
Language and cultural barriers increase risk in encounters.
5.
Threats to employees are present all day, every day, everywhere in Watchout
Areas.
6.
You are not clearly identified as a BLM employee. While this is intentional for safety purposes, you need to keep that in mind when encountering visitors.
7.
Every visitor/individual you contact has potential risk.
8.
There may be a higher occurrence of unexpected visitor/individual encounters.
9.
Traditional responses may not be appropriate; go with your gut feelings.
10.
Use caution if responding to situations inconsistent with assigned authority and training.
11.
Unattended vehicles are subject to being damaged or stolen – lock up every time. Travel with your doors locked.
12.
Illegal uses in the Watchout area are likely.
13.
There is a heightened risk of biological contamination associated with improper waste disposal.
14.
Always know your location and be able to describe it.
15.
Let others know your expected route and destination(s) (check-in and check-out).
16.
Expect to encounter Interagency Law Enforcement and interdiction actions and activity.
17. Expect high speed driving and law enforcement pursuits.
18. All aircraft operations have increased collision risk.
19. Threats to employees are present at all times.
20.
Night operations require special considerations.
Remember … Your Safety is Your Responsibility. Take Charge of It!