A06_Spex_PaintedRocks_27Feb2024.pdf

PDF 1 MB Posted

Attached to
Campgrounds 2, 4 and 5 ADA/ABA-compliant Concrete Federal contract opportunity
Solicitation number
140L6424Q0018
Issued by
Department of the Interior Bureau of Land Management Arizona Region

About this file

This is a solicitation for a federal contract to construct ADA/ABA-compliant concrete pathways and parking pads at three campground sites within the Painted Rocks Campground located in Arizona. The solicitation requires furnishing all labor, materials, equipment and transportation to construct integrally-colored and welded wire reinforced concrete pathways and slabs. Key details include specifications for excavation, earthwork, concrete mix designs and placement, curing, and welded wire reinforcement. The solicitation also provides site conditions, environmental requirements, and a project timeline anticipating completion within 90 working days. The contracting agency is the Department of the Interior Bureau of Land Management Arizona Region.

View the file

Other files for this federal contract opportunity

Other files attached to Campgrounds 2, 4 and 5 ADA/ABA-compliant Concrete, newest first.
File Type Posted
Sol_140L6424Q0018_Amd_0002.pdf PDF
Sol_140L6424Q0018_Amd_0001.pdf PDF
B03_WD_AZ20230008.pdf PDF
Sol_140L6424Q0018.pdf PDF
CampingGuidelines-PaintedRocks_27Feb2024.pdf PDF
B08_BidSchedule-PaintedRocks_27Feb2024.pdf PDF
DWGS-C5-PaintedRocks_27Feb2024.pdf PDF
DWGS-C2-PaintedRocks_27Feb2024.pdf PDF
DWGS-C4-PaintedRocks_27Feb2024.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADA/ABA Improvements for C2, C4 & C5 at

Painted Rocks Campground

Table of Contents of

Written Specifications

Section 01100 – Summary of Work………………………………………………001

Section 01330 – Submittals……………………………………………………….010

Section 02300 – Earthwork, Excavation & Fill for Structures……………………013

Section 02339 – Watering…………………………………………………………018

Section 02776 – Concrete Pathways & Slabs……………………………………..019

Section 03320 – Welded Wire Reinforcement…………………………………….024

14 February 2024

Painted Rocks Campground

Summary 01100-1

SECTION 01100 – SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. Description of Work:

1. For C2, furnish labor, transportation, equipment, supplies and materials to construct an

ADA/ABA-compliant, integrally-colored, welded wire-reinforced concrete pathway and parking pad in accordance with the requirements of the specifications under this Contract to the satisfaction of the Contracting Officer’s Representative (COR) or Project Inspector (PI), namely, COR/PI who are delegated to oversee the Contract by the Contracting Officer (CO).

a. Include in your schedule any material lead times especially for joint filler mentioned in “C2 Work” for Expansion Joint Material, and in Section 02776, Part 2, “Expansion Joint Filler” that may very likely be a special-order item because it is thinner than the commonly-used thickness.

2. For C4, furnish labor, transportation, equipment, supplies and materials to construct an ADA/ABA-compliant, integrally-colored, welded wire-reinforced concrete pathway in accordance with the requirements of the specifications under this Contract to the satisfaction of the Contracting Officer’s Representative (COR) or Project Inspector (PI), namely, COR/PI who are delegated to oversee the Contract by the Contracting Officer

(CO).

a. Include in your schedule any material lead times especially for joint filler mentioned in “C4 Work” for Expansion Joint Material, and in Section 02776, Part 2, “Expansion Joint Filler” that may very likely be a special-order item because it is thinner than the commonly-used thickness.

3. For C5, furnish labor, transportation, equipment, supplies and materials to construct an ADA/ABA-compliant, integrally-colored, welded wire-reinforced concrete pathway in accordance with the requirements of the specifications under this Contract to the satisfaction of the Contracting Officer’s Representative (COR) or Project Inspector (PI), namely, COR/PI who are delegated to oversee the Contract by the Contracting Officer

(CO).

a. Include in your schedule any material lead times especially for joint filler mentioned in “C5 Work” for Expansion Joint Material, and in Section 02776, Part 2, “Expansion Joint Filler” that may very likely be a special-order item because it is thinner than the commonly-used thickness.

B. For “C2 Work” Outline:

1. Concrete Pathway (Type IA) – Construct an ADA/ABA-Accessible 6-foot-wide pathway of all of 3000 psi concrete for Parking Pad Path 1 (to Parking Pad 1).

a. For path, layout, and construct 6-foot-wide pathway from a carefully trenched graded surface within the defined area of work approximately as shown in the specifications to have a finished concrete surface flush with the lightly-graded ground surface, and compact surface. Use acceptable backfill material, and compact as required. Refer to Specifications Section 2300.

b. Not Used.

c. New construction in general shall match the existing elevation between new and old concrete finished surfaces and within tolerances. That is, the maximum

Painted Rocks Campground

Summary 01100-2

Vertical Change in Level for concrete surfaces is ¼-Inch (one-quarter inch) between existing “and/or” new construction. Furthermore, with approval of the COR/PI, the Contractor may also opt for a variation, namely, a combination of Vertical change in Level and a Beveled Change in Elevation which is described as an additional maximum ¼-inch (one-quarter inch) change in elevation but with bevel at 2 horizontal to 1 vertical.

d. As applicable, keep running slopes as constant as possible which shall not exceed the following:

1. 5 percent (1:20) for any distance.

2. 8.33 percent (1:12) for a maximum of 50 feet but requires prior field approval by COR/PI.

3. 10 percent (1:10) for a maximum of 30 feet but requires prior field approval by COR/.PI.

4. For stretches of pathways that exceed the aforementioned upper travel distance limits, square landings of at least 6 feet square are required of minimum cross-slope for drainage in order not to exceed those maximum travel distances.

e. The finished surface elevations adjoining new work with new work and existing work shall match.

f. Make the cross-slope constant at but not exceeding 2.08 percent (1:48). If a transition should become necessary as field approved by COR/PI, make a smooth cross-slope transition within 6 feet running distance.

g. Make all pathway surfaces have a skid-resistant broom finish. Refer to the Specifications 02776, Subsection 3.4 for more information.

h. Put control joints (cj) with a guideboard and groover to one-third depth of pathway perpendicular to the running direction in accordance with the Specifications, and construction joints shall be equidistant at 6-foot intervals.

Furthermore, the COR/PI will review for approval field proposals with respect to esthetics to resolve any “odd intervals” that can occur at the end of pathways and will accept changing some of the equidistant intervals or accepting the ending interval. Acceptable equidistant intervals range from 3 feet to 6 feet.

i. Put an expansion joint (ej) between new pathways and existing structures, between new pathways and new slabs and in cross direction of pathways every 18 running feet. That is, a full 18 running feet shall have 2 control joints between two expansion joints. The aforementioned “odd interval” applies.

2. Van/Automobile-Accessible Parking Pad 1 (Type II) – Construction of two vehicle parking pad at Parking Pad 1.

a. Construct a wire reinforced 3000 psi concrete parking pad of dimensions 30-feet wide by 21-feet long by 6-inches thick for the interior with thickened edges all around the new slab to the dimensions also shown in the specifications drawings that shall have a finished concrete surface flush with the lightly-graded ground surface.

b. In general, the new construction shall match the existing elevation between new and old concrete finished surfaces within tolerances. That is, the maximum Vertical Change in Level is ¼-Inch (0.25 inch) between existing and new construction. Furthermore, with approval of the COR/PI, the Contractor may also opt for Beveled Change in Elevation which is described as the maximum Vertical Change in Level of ¼-inch (one-quarter inch) plus on top a ¼-inch (one-quarter inch) change in elevation with bevel at 2 horizontal to 1 vertical.

c. Make the slab have a skid-resistant broom finish. Refer to Specifications 02776, Subsection 3.4 for more information.

Painted Rocks Campground

Summary 01100-3

d. Make all cross-slopes for drainage not more than 2.08 percent (1:48).

e. Put control joints with a guideboard and groover one-third depth such that they divide the slab into rectangles with ratio of length to width approaching 1; that is, both dimensions that form a rectangle are closest to a square.

f. Put an expansion joint in locations shown on the specifications drawings.

3. Control Joints (also known as either as Contraction Joints or as Dummy Joints) and Expansion Joints: Control joints (cj) and expansion joints (ej) generally stated here may be shown on the specifications drawings for emphasis, and other control and expansion joints not generally stated here shall also be installed. Especially note that all control joints shall be cleanly formed of a V-groove of 3/8-inch (three-eighth inch) width at top and ¼-inch (one-quarter inch) width at bottom to the required depth or shall be cleanly formed by other standard industry methods of 3/8-inch (three-eighth inch) width to the required depth as approved by the COR/PI.

4. Expansion Joint Material for 3/8-inch (three-eighth inch): Refer to 02776, Part 2.

C. For “C4 Work” Outline

1. Concrete Pathway (Type IB) – Construct an ADA/ABA-Accessible 6-foot-wide pathway of all of 3000 psi concrete for Rest Path 3.

a. For paths, layout, and construct 6-foot-wide pathway from a carefully trenched graded surface within the defined area of work approximately as shown in the specifications to have a finished concrete surface flush with the lightly-graded ground surface, and compact surface. Use acceptable backfill material, and compact as required. Refer to Specifications Section 2300.

b. Not Used.

c. New construction in general shall match the existing elevation between new and old concrete finished surfaces and within tolerances. That is, the maximum Vertical Change in Level for concrete surfaces is ¼-Inch (one-quarter inch) between existing “and/or” new construction. Furthermore, with approval of the COR/PI, the Contractor may also opt for a variation, namely, a combination of Vertical change in Level and a Beveled Change in Elevation which is described as an additional maximum ¼-inch (one-quarter inch) change in elevation but with bevel at 2 horizontal to 1 vertical.

d. applicable, keep running slopes as constant as possible which shall not exceed the following:

1. 5 percent (1:20) for any distance.

2. 8.33 percent (1:12) for a maximum of 50 feet but requires prior field approval by COR/PI.

3. 10 percent (1:10) for a maximum of 30 feet but requires prior field approval by COR/.PI.

4. For stretches of pathways that exceed the aforementioned upper travel distance limits, square landings of at least 6 feet square are required of minimum cross-slope for drainage in order not to exceed those maximum travel distances.

e. The finished surface elevations adjoining new work with new work and existing work shall match.

f. Make the cross-slope constant at but not exceeding 2.08 percent (1:48). If a transition should become necessary as field approved by COR/PI, make a smooth cross-slope transition within 6 feet running distance.

g. Make all pathway surfaces have a skid-resistant broom finish. Refer to the Specifications 02776, Subsection 3.4 for more information.

Painted Rocks Campground

Summary 01100-4

h. Put control joints (cj) with a guideboard and groover to one-third depth of pathway perpendicular to the running direction in accordance with the Specifications, and construction joints shall be equidistant at 6-foot intervals.

Furthermore, the COR/PI will review for approval field proposals with respect to esthetics to resolve any “odd intervals” that can occur at the end of pathways and will accept changing some of the equidistant intervals or accepting the ending interval. Acceptable equidistant intervals range from 3 feet to 6 feet.

i. Put an expansion joint (ej) between new pathways and existing structures, between new pathways and new slabs and in cross direction of pathways every 18 running feet. That is, a full 18 running feet shall have 2 control joints between two expansion joints. The aforementioned “odd interval” applies.

2. Not Used.

3. Control Joints (also known as either as Contraction Joints or as Dummy Joints) and

Expansion Joints: Control joints (cj) and expansion joints (ej) generally stated here may be shown on the specifications drawings for emphasis, and other control and expansion joints not generally stated here shall also be installed. Especially note that all control joints shall be cleanly formed of a V-groove of 3/8-inch (three-eighth inch) width at top and ¼-inch (one-quarter inch) width at bottom to the required depth or shall be cleanly formed by other standard industry methods of 3/8-inch (three-eighth inch) width to the required depth as approved by the COR/PI.

4. Expansion Joint Material for 3/8-inch (three-eighth inch): Refer to 02776, Part 2.

D. For “C5 Work” Outline:

1. Concrete Pathway (Type IA) – Construct an ADA/ABA-Accessible 6-foot-wide pathway of all of 3000 psi concrete for Rest Path 5.

a. For paths, layout, and construct 6-foot-wide pathway from a carefully trenched graded surface within the defined area of work approximately as shown in the specifications to have a finished concrete surface flush with the lightly-graded ground surface, and compact surface. Use acceptable backfill material, and compact as required. Refer to Specifications Section 2300.

b. Not Used.

c. New construction in general shall match the existing elevation between new and old concrete finished surfaces and within tolerances. That is, the maximum Vertical Change in Level for concrete surfaces is ¼-Inch (one-quarter inch) between existing “and/or” new construction. Furthermore, with approval of the COR/PI, the Contractor may also opt for a variation, namely, a combination of Vertical change in Level and a Beveled Change in Elevation which is described as an additional maximum ¼-inch (one-quarter inch) change in elevation but with bevel at 2 horizontal to 1 vertical.

d. As applicable, keep running slopes as constant as possible which shall not exceed the following:

1. 5 percent (1:20) for any distance.

2. 8.33 percent (1:12) for a maximum of 50 feet but requires prior field approval by COR/PI.

3. 10 percent (1:10) for a maximum of 30 feet but requires prior field approval by COR/.PI.

4. For stretches of pathways that exceed the aforementioned upper travel distance limits, square landings of at least 6 feet square are required of minimum cross-slope for drainage in order not to exceed those maximum travel distances.

e. The finished surface elevations adjoining new work with new work and

Painted Rocks Campground

Summary 01100-5 existing work shall match.

f. Make the cross-slope constant at but not exceeding 2.08 percent (1:48). If a transition should become necessary as field approved by COR/PI, make a smooth cross-slope transition within 6 feet running distance.

g. Make all pathway surfaces have a skid-resistant broom finish. Refer to the Specifications 02776, Subsection 3.4 for more information.

h. Put control joints (cj) with a guideboard and groover to one-third depth of pathway perpendicular to the running direction in accordance with the Specifications, and construction joints shall be equidistant at 6-foot intervals.

Furthermore, the COR/PI will review for approval field proposals with respect to esthetics to resolve any “odd intervals” that can occur at the end of pathways and will accept changing some of the equidistant intervals or accepting the ending interval. Acceptable equidistant intervals range from 3 feet to 6 feet.

i. Put an expansion joint (ej) between new pathways and existing structures, between new pathways and new slabs and in cross direction of pathways every 18 running feet. That is, a full 18 running feet shall have 2 control joints between two expansion joints. The aforementioned “odd interval” applies.

2. Not Used.

3. Control Joints (also known as either as Contraction Joints or as Dummy Joints) and

Expansion Joints: Control joints (cj) and expansion joints (ej) generally stated here may be shown on the specifications drawings for emphasis, and other control and expansion joints not generally stated here shall also be installed. Especially note that all control joints shall be cleanly formed of a V-groove of 3/8-inch (three-eighth inch) width at top and ¼-inch (one-quarter inch) width at bottom to the required depth or shall be cleanly formed by other standard industry methods of 3/8-inch (three-eighth inch) width to the required depth as approved by the COR/PI.

4. Expansion Joint Material for 3/8-inch (three-eighth inch): Refer to 02776, Part 2.

E. Earthwork for Foundations under the new concrete: Structure foundations involve excavation, backfill and compaction or just backfill, depending on the material chosen. Refer to Specification Section 02300, and the specifications drawings for more information.

F. Earthwork Around New Concrete Finished Surfaces: Finished concrete surfaces that result above original ground (O.G.) or ground shall have an embankment built around them of specific dimensions for a smooth transition to O.G. or ground. Refer to Specifications Section 02300 and the specifications drawings for more information.

G. Existing Structures, Pads and Slabs: They may be irregular; thus, the Contractor shall adapt and conform to existing conditions.

H. Specifications Drawings, Layout & Establishing Layout:

1. Specifications drawings have nominal dimensions. Thus, field verification of the general layout shall consist of field layout and approval of final locations of the concrete work that shall satisfy the specifications.

2. A control point (CP) is nearby, and the Contractor may use it but on an as-is basis;

nevertheless, the Contractor shall field locate the pathways and parking pad using the specifications drawings, but the COR/PI will approve the final locations, that is, a field fit.

3. The COR/PI will also need to approve the final layout during progress and before pouring concrete. The information that the specifications drawings convey shall be taken in their entirety.

Painted Rocks Campground

01100-6

I. If a conflict exists within the specifications, the more stringent shall govern.

J. Purpose of Work: The purpose of the work under this contract is to construct

ADA/ABA-compliant pathways.

K. Location: Painted Rocks Campground worksite is located at longitude N 33.022813 decimal degrees, latitude W 113.047347 decimal degrees referenced to North American Datum 1983 that is used throughout these specifications. The worksite by local roads is about 31 miles west of Gila Bend, Arizona. From Gila Bend, take Interstate 8 West and exit on Exit 102 “Painted Rock Road” for about 9 miles and continue straight onto Rock Point Road for about 0.5 miles arriving at the entrance to Painted Rocks Campground at N 33.024354 in decimal degrees, W 113.045356 in decimal degrees. Note that this road has inconsistent names that can be Painted Rock Dam Road and Citrus Valley Road. In the Public Land Survey System, it is Township 5S, Range 08W, Section 02. The worksite area can be described as generally flat with rock outcroppings with surrounding mountains and washes throughout in a desert climate.

L. Climate: Nearby Gila Bend, Arizona, gets 7 inches of rain, on average, per year. The US average is 38 inches of rain per year. Gila Bend averages 0 inches of snow per year. The US average is 28 inches of snow per year. On average, there are 296 sunny days per year in Gila Bend. The US average is 205 sunny days. Gila Bend gets precipitation, on average, 25 days per year.

Precipitation is rain, snow, sleet, or hail that falls to the ground. In order for precipitation to be counted, the location has to get at least 0.01 inches on the ground to measure. The annual BestPlaces Comfort Index for Gila Bend is 7.2 (10 = best), which means it is less comfortable than most places in Arizona. Monsoons happen during the summer, which the official dates are from 15 June to 30 September. Flash flooding can occur anytime during the year.

M. Camping on Site: Camping on BLM land is allowed in accordance with the work camp

Guidelines attached to this Contract. Nearby lodging is about 31 miles away in Gila Bend.

Final camp locations will be field approved by the COR/PI.

N. Water and Toilet Facilities: Water is unavailable on-site; thus, the Contractor shall provide potable water for drinking and handwashing activities. Even though vault toilet facilities are in the general area, the Contractor shall provide separate portable toilets for each gender with handwashing facilities for its personnel.

O. Electric power, Telephone and Fueling Stations: Electric power is unavailable on site, telephone service does not exist, mobile telephone service is questionable, and the nearest fueling stations are likely in Gila Bend, Arizona.

P. Staging and Stockpiling: If needed, adequate space exists for equipment staging and material stockpiling; final locations will be field approved by the COR/PI.

N Site Security: No security for equipment is provided. The worksite is within the campground and is generally quiet with regular visitors throughout the day, but the potential for theft or vandalism is always possible because of its remoteness but proximity to Interstate 8. Any equipment left after-hours should be guarded by the Contractor during this contract.

O. Natural Resource Protection:

1. Grounds and vegetation outside the work area shall be protected from damage.

Painted Rocks Campground

01100-7

2. Desert Tortoise: Collection, harassment, and disturbance of desert tortoises are all prohibited by Arizona State Law. Notify the CO and COR/PI immediately if a Desert Tortoise is encountered. Work in the immediate area of the animal shall stop until the tortoise can be relocated by the BLM authorized individual.

3. The Contractor shall allow access to the biologist for visual inspections of the project site during progress of the work.

P. Cultural Resource Protection:

1. If in connection with operations under this authorization, any archaeological or historical artifacts, human remains, funerary objects, sacred objects or objects of cultural patrimony as defined in the Native American Graves Protection and Repatriation Act (PL 101-601; Stat. 3048; 25 USC 3001) are discovered, the Contractor shall stop operations in the immediate area of the discovery, protect the remains and objects, and immediately notify the CO of the discovery. The Contractor shall continue to protect the immediate area of the discovery until notified in writing by the CO that operations may resume.

2. Stay within the work area because the campgrounds are or near natural and cultural resources. The specifications drawings show “No Access” and “No Mechanized Equipment” zones that shall be avoided. Seek the COR/PI for guidance.

Q. The Contractor shall allow access to the archeologist for visual inspections of the project site during progress of the work.

R. Environmental Considerations:

1. No fueling operations may be conducted on site. Fuel or oil spills occurring during the work of this project shall be excavated to a depth of 12 inches beyond contaminated material and removed from the work location in accordance with federal, state, and local regulations.

2. The Contractor shall operate vehicles and equipment within existing roadways and parking areas.

3. Litter and debris generated by the Contractor shall be collected, contained, hauled, and disposed of daily per local, state, and federal regulations regarding construction waste.

Burning is not permitted.

1.2 GEOTECHNICAL DATA

Geotechnical Report: No geotechnical data, reports, or design recommendations are provided by the Government or included as part of the contract requirements.

1.3 USE OF PREMISES

A. Schedule operations, so that work is conducted between 06:00 and 18:00, Monday through Friday, except Federal Holidays or as otherwise approved in writing by the CO. Note that campers may be present especially during the cooler months, so keep the noise to a minimum as possible.

B. Schedule and sequence operations necessary to complete the work, including coordination with other crafts relative to the Contractor's requirements. Schedule work in such manner as to avoid delays in overall construction and permit proper installation of work.

C. Use of Site: Limit use of premises to work in areas and areas within the contract limits. Do not

Painted Rocks Campground

01100-8 disturb portions of project site beyond areas in which the work is indicated.

D. Camps may not be set up for any longer than necessary, and must be removed after work is completed, unless specifically authorized otherwise. No year-round, permanent camps may be established on BLM lands or State Trust lands; only temporary facilities are permitted in connection with authorized work. Camps will be located to avoid conflict with public road and trail traffic, and stream, river, or lake access.

E. In addition, camps shall generally be at least 200 feet from any water source, and at least one-quarter mile from wildlife water developments.

F. Open campfires shall be built only in areas free of hazardous fuels with at least 10 feet radius, unless otherwise prohibited by order of the Bureau of Land Management. Fire rings or pits will be set on bare mineral soil. After use, fire rings or pits will be obliterated, and the site rehabilitated.

G. In addition, campfires shall be completely extinguished when left unattended. The Contractor is responsible for all fires started by owner or employees and may be held responsible for fire suppression costs resulting from wildfire caused by their contract operations. The tools to consider for fire control can be a fire extinguisher, shovel, and water that shall be available at the campfires.

H. Fire, Health & Safety Plan: Submit a Fire, Health and Safety Plan that shall have the location and telephone number of the nearest hospital.

I. Food, water, tools “and/or” equipment caches require advance authorization by the COR/PI.

When authorized, caches shall be neatly stored out of sight of roads and trails. Refer to “Site Security.”

J. Trash Disposal: All trash generated by the contractor shall be packed out of public land and disposed of at an approved land fill facility. No trash or litter shall be allowed to accumulate on the grounds. Trash shall not be buried on public land.

PART 2 - PRODUCTS

(There are no applicable requirements.)

PART 3 - EXECUTION

3.1 ANTICIPATED PERIOD OF PERFORMANCE

A. The Government anticipates that the Contractor should finish all work in 90 working days in accordance with the Government calendar, but the CO may assign a different period of performance.

3.2 PROJECT MEETINGS

A. Site Visit: Bidders are free to go to the site on their own since it is a public site.

However, upon requests from bidders, one site visit can be held if necessary.

Painted Rocks Campground

01100-9

Accordingly, the meeting date, time, and place will be announced.

B. Pre-Work Meeting: A meeting will be held prior to the start of the work unless otherwise stated by the CO. The Contractor will be notified in advance of the meeting time, date, and place; and shall attend. The purpose will be to review work, project Written and Drawing Specifications, payroll and payments, administrative provisions of the contract, and work schedules which include but are not limited to start and finish dates, submission dates of submittals, and critical inspection dates before the pouring of concrete. Refer to “Inspection before Concrete Pour” of this Section.

C. Progress Meetings: A meeting may be requested by either the CO, or the Contractor. The request shall state who shall attend and shall include an agenda.

D. Inspection before Concrete Pour: The COR/PI will inspect the work for correctness especially for location, slopes, and elevations before pouring concrete and shall be informed when the Work is ready for inspection no fewer than 5 working days before. The Contractor shall be prepared to adjust its work schedule in case the COR/PI finds any necessary corrections to bring work in compliance with the specifications at no extra cost to the Government. All such costs shall be included in the original bid.

E. Final Inspection: Notify the CO in writing at least five working days before the completion date, so that the Government can schedule final inspection. The meeting shall be held on-site.

The Contractor’s superintendent and other key personnel shall attend.

END OF SECTION 01100

14 February 2023

Painted Rocks Campground

Submittal Procedures 01330-1

SECTION 01330 – SUBMITTALS

PROCEDURES PART 1 - GENERAL

1.1 SUMMARY

A. Requirements for submittals involve but are not limited to work schedules, work areas, repair method, concrete, and earthwork. Any variation from the latest submittal requires an update.

Some submittals are anticipated by the Government, but the Government reserves the right to request submittals on any item in the specifications to verify adherence as the Government deems necessary. The costs of all anticipated and unanticipated submittals shall be accounted for in the original bid; nevertheless, getting the Work done correctly and efficiently is the goal of the Government. Submissions are typically to the Contracting Officer’s Representative (COR) and sometimes to the Contracting Officer (CO), depending on what the CO instructs the Contractor.

1.2 QUALITY ASSURANCE

A. Approval: Written approval of the submittals is an indication that the Contractor’s submittals have been reviewed and that there are no objections, except as noted. Installation of materials on the basis of written approval of the submittals shall not relieve the Contractor of the responsibility for incorporating materials which conforms to the requirements of the drawings and specifications. Written approval of the deviations shall apply only to those deviations or omissions from the requirements of the written and drawing specifications which shall be brought to the CO’s attention in writing.

B. Submittal Review Time:

1. Total review time is 10 calendar days, but submittals shall be submitted 20 calendar days before the work is scheduled to start. Receipt of a submittal is the date and time stamp from BLM’s mailroom, and End of Review is the postmark from the U.S. Post Office or other commercial service. Hand delivery is possible with written receipt.

2. The CO/COR reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

3. For physical deliveries, submittals shall be delivered to 1 N Central Ave, Suite 800, AZ9550, Phoenix, Arizona 85004-4427.

4. Internet mail submissions may be acceptable but only if delivery can be fully executed.

That is, the file-size limitation is about 25 Mb, and the addressee must have access to internet mail at any time of submission. Thus, written acknowledgement of receipt by the Government is through an internet mail response by the addressee which will determine the start of review time.

(There are no applicable requirements.)

PART 3 – EXECUTION

Painted Rocks Campground

01330-2

3.1 CONTRACTOR'S REVIEW

A. Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to COR or as instructed by CO.

B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, by a statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

C. General: The COR will not review submittals that do not bear Contractor's approval stamp and will return them without action.

D. Partial submittals are not acceptable, will be considered nonresponsive, and will be returned without review.

E. Submittals not required by the Contract Documents may not be reviewed and may be discarded.

F. Written approval of deviations shall apply only to those deviations or omissions from the requirements of Contract Documents brought to CO's attention in writing.

3.3 SUBSTITUTIONS

A. The Contractor shall present requests for substitution to the CO according to the following:

1. Deliver sufficient calculations and data to justify selection of the proposed item and permit comparison with the original item.

2. Show complete layout of system, except that which is identical to Contract documents, unless unchanged portion must be shown to indicate clearances.

3. Include drawings, same scale as Contract drawings, marked to show differences.

4. Submit complete technical data including test data, drawings, manufacturer’s literature, samples, and complete performance specifications.

5. The Contractor is responsible for the cost of redesign and modifications to this, or other parts of the project caused by the substitutions.

3.4 DEMOLITION, TRASH AND WASTE

A. If not covered either fully or partially in other Sections, demolition, trash and waste generated from the Contractor’s work shall be removed from BLM lands and shall be legally disposed.

Disposing of vegetation is covered under Section Clearing and Grubbing. Otherwise, the Contractor shall submit its plan for disposal of the aforementioned for review and approval of the type of material to be disposed and where to be disposed.

3.5 CERTIFICATES

A. Contractor shall submit to the Government all certifications to ensure quality in construction.

3.6 SUBMITTALS

Painted Rocks Campground

01330-3

A. Submittals and re-submittals shall be included in the original bid unless otherwise provided for in the specifications.

END OF SECTION 01330

Painted Rocks Campground

Earthwork, Excavation and Fill for Structures 02300-1

SECTION 02300 – EARTHWORK, EXCAVATION & FILL FOR STRUCTURES

PART 1 - GENERAL

1.1 SUMMARY

A. Description of Work: Excavation is primarily for placement of concrete forms “and/or” concrete placements, backfill of materials wherever necessary, and execution of other earthwork activities as necessary.

1.2 REFERENCE DRAWINGS

A. Refer to the attached Specifications Drawings.

1.3 DEFINITIONS & LIMITATIONS

A. ABC is an acronym for aggregate base course and is composed of natural or crushed, angular rock and some fines. It is of varying sizes that meet the gradation standards in this Section and is used as a base course in roadways, pathways, and concrete pads as well as for foundations in general. It is also used as a backfill material for general fill situations, underground pipelines, and other underground utilities.

B. Backfill is concrete, controlled low-strength concrete or aggregate base course (ABC).

Native material from excavation is generally considered an unclassified excavation that is subject to the COR/PI’s discretion for use. It furthermore must be free of loose materials like vegetation and deleterious materials. Refer to unclassified excavation.

C. Unclassified Excavation is earthwork on native material of unknown soil classification under a classification system that is recognized, say, in Geotechnical Engineering. The materials may include rock, soil materials, and obstructions.

D. Earthfill is earthwork on native or local soil without vegetation and other deleterious material resulting from excavation for concrete work or nearby on site. Otherwise, any earthfill source shall require the approval of the COR/PI before use.

E. Excavation is the removal of material encountered on surface and are:

1. To elevations regardless of the character of grade or subgrade conditions encountered.

2. To the extent necessary to complete the Work in accordance with the specifications.

F. Unauthorized Excavation is also known as over excavation, is excavation below surface or beyond lines and dimensions contrary to the specifications and, as well as remedial work, shall be borne by the Contractor.

G. Over Excavation is earthwork that is, in the opinion of the COR/PI, excavation beyond the depth necessary for pathways, parking pads and slabs in general or outside the pathways, parking pads and slabs in general. Furthermore, over excavation inadvertently from removal

Painted Rocks Campground

02300-2 of, say, cobbles (generally from 75 mm to 300 mm) “and/or” boulders (generally from 300 mm and up) leaving large holes requires an approved backfill material defined above if structural concrete is not used.

H. Fill is earthwork and a general term for soil to fill places where earth is required.

I. Grading is earthwork to bring ground to another grade. Refer to grade.

J. Grade (Gradient) is any slope of ground that can be original, constructed or excavated whether in progress or final.

K. Subgrade refers to grade below concrete work and is defined as a finished surfaced of native soil free of loose materials like vegetation and deleterious materials.

L. Base refers to grade below concrete work and is defined as a finished surfaced of native soil free of loose materials without vegetation and deleterious materials.

M. Structures are slabs, walls, fences, or other man-made stationary features constructed above or below the grade.

N. Utilities are on-site underground pipes, conduits, ducts, and cables, as well as underground services within structures whether known or unknown to exist.

O. Original Ground (O.G.) is the ground surface as encountered, and the acronym is “O.G.” used throughout the specifications.

1.4 PROJECT CONDITIONS

A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during earth moving operations.

1. Do not close or obstruct roads, walks, or other adjacent occupied or used facilities without permission from owner and authorities having jurisdiction.

2. Provide alternate routes around closed or obstructed traffic ways if required by landowner or authorities having jurisdiction.

B. Utility Locator Service: Notify a local utility locator service or an entity having jurisdiction for area where any work whether on BLM land or adjoining land is performed for the purpose of this work before beginning any earth moving operations.

1.5 SUBMITTALS

A. If used, gradation on the ABC is under Specification Section 02776.

B. Compaction results.

C. Mix design for low-strength concrete. Refer to Part 2 for low-strength concrete requirements.

Painted Rocks Campground

02300-3

2.1 SOIL MATERIALS

A. Low-Strength Concrete as Backfill for Unauthorized Excavation:

1. Controlled low-strength concrete as backfill, requiring approval. It shall be self-compacting, “flowable” concrete material produced from the following:

a. Portland Cement: ASTM C 150, Type I, or other as applicable.

b. Fly Ash: ASTM C 618, Class C or F.

c. Normal-Weight Aggregate: ASTM C 33, 3/8-inch (10-mm).

d. Potable Water: ASTM C 94/C 94M.

e. Non-Potable Water: ASTM C 1602/C 1602M-04 and ASTM C 1603/C 1603M-

04.

f. Air-Entraining Admixture: ASTM C 260.

g. Produce conventional-weight, controlled low-strength concrete material with 80-psi (550-kPa) compressive strength when tested according to ASTM C 495.

B. ABC (Aggregate Base Course) – Alternative Backfill to Concrete or Low-Strength Concrete Material for Unauthorized Excavation under New Concrete Work: The Contractor may elect to place backfill in lifts of 6 inches and meet compaction to 95 percent of Modified Proctor utilizing the following:

a. ABC shall be sand and gravel, crushed rock “and/or” decomposed granite with a minimum of thirty percent (30%) crushed faces and with some fines, a binder material, so that it can be tightly compacted and shall have a Plasticity Index not to exceed six

(6) and shall conform to ABC Gradation.

b. ABC Gradation:

Sieve Size Percent Passing 1½ inch 100 ¾ inch 65-90 No. 4 Sieve 30-90 No. 40 Sieve 12-30 No. 200 Sieve 03-12

C. Earthfill, if approve by COR/PI, must meet the same compaction standard as ABC above to be useable, and shall be from site excavation or local source.

PART 3 - EXECUTION

3.1 PREPARATION

A. Within the concrete work, excavation shall be to the lines and limits in accordance with the specification. For unauthorized excavations, the correct backfill shall be used as defined in these specifications.

B. Protect structures, utilities, pathways, pavements, and other facilities from damage caused by work.

C. Protect and maintain erosion and sedimentation controls during work.

D. Protect subgrades and foundation from weather.

Painted Rocks Campground

02300-4

3.2 WORK

A. With field approval of the COR/PI, grade the existing surface where the structures will be placed and the area on each side in accordance with the specifications drawings but grade only enough as necessary to clear loose soil and variations in surface elevations. Refer to Grading in Part 3.

B. Excavate shallow trenches for concrete work to sufficient depth and dimensions in order to have a finish concrete surface at graded ground level for pathways, parking pads or slabs in general. Note that unauthorized excavations require specific remedies, depending on where occurring.

C. Clear loose soil and rock to make a firm surface (base) for the placement of concrete to industry standards to the satisfaction of the COR/PI in the field. The COR/PI, furthermore, will especially judge whether the base needs more preparation such as compaction.

D. After placing forms to slopes and dimensions and welded reinforcing wire, all in accordance with the specifications and standard industry practices, obtain approval from COR/PI before proceeding with further work especially concrete work.

3.3 CONCRETE FINISH SURFACE HIGHER THAN GROUND

A. Wherever any finish concrete surface is inadvertently above ground level, place and compact backfill material in accordance with one of the remedies under Specifications Section 02300, Subsection 2.1

1. If ABC is approved, place and compact the ABC with enough water using at least a manual soil compactor of sufficient energy to construct a stable embankment to compaction standard and to the satisfaction of the COR/PI.

2. Use the aforementioned ABC material in this section, but the COR/PI may require a thin layer of native soil to cover the ABC material for aesthetic purposes.

3. If earthfill is approved, compaction of earthfill outside concrete work shall be achieved via sufficient water and at least via a manual soil compactor of sufficient energy applied to earthfill to the satisfaction of the COR/PI.

4. As a transition around all new concrete work from the new concrete surface outward at 6 to 1 slope for up to 3 feet in such a manner to daylight and, if necessary, up to another 3 feet for a field-determined slope in such a manner to daylight with ground or O.G. in order to provide drainage away.

5. If the Contractor encounters any daylighting problems with O.G. or ground, the COR/PI will resolve the problem in the field. Furthermore, cuts at 6:1 slope for 3 feet or up to daylight or an obstruction is required as applicable. The aforementioned instructions supplement the specifications drawings.

3.4 GRADING

A. Uniformly grade areas to a smooth surface, free of irregular surface changes.

1. Provide a smooth transition between adjacent existing grades and new grades.

2. Grade in order that final concrete surface is just at the lightly-graded surface.

3.5 FIELD QUALITY CONTROL

Painted Rocks Campground

02300-5

A. COR/PI will visually inspect all bases for competency in order to be acceptable for the concrete pours.

3.6 PROTECTION

A. Protecting Graded Areas: Protect newly graded areas from traffic, erosion, and freezing.

Keep free of trash and debris. Where completed or partially completed surfaces become eroded, rutted, or settled, remove loose material in subgrade to competency and backfill with material in accordance with the specifications.

3.7 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. If not covered either fully or partially in other Sections, transport off BLM land any vegetation, contaminated soil, trash, waste concrete, oil, and other undesirable materials, and legally dispose of them.

END OF SECTION 02300

SECTION 02339 – WATERING

A. Description of Work: Distributing and applying water required typically for excavation and compaction of soil, and dust control.

1.2 PROJECT AND SITE CONDITIONS

A. Water Source: Contractor shall furnish all water for work under these Specifications.

2.1 MATERIALS

A. Water Quality: Water shall be clean and free from harmful amounts of oil, acids, alkalis, salts, organic materials, or any other substance that the government deems deleterious to the work, plants, or anything else on site. Potable water is acceptable.

B. Refer to Specifications Section 02776 (Concrete Pathways and Slabs) regarding water for the manufacture of integrally-colored concrete.

2.2 EQUIPMENT

A. Requirements: As necessary, provide pumping equipment, piping, tanks, water trucks and measuring devices required in the supply of water. Use of measuring devices shall require the approval of the CO.

3.1 APPLICATION

A. Compaction: Water may be applied by sprinkling only enough water to facilitate compaction to industry standards which shall require the approval of the COR/PI.

B. The amount of water required may be varied at the discretion of the CO in order to meet conditions brought about by storms, droughts, or other causes.

END OF SECTION 02339

ADA/ABA Improvements for C2, C4 & C5 Watering Painted Rocks Campground 02339-1

Painted Rocks Campground

Concrete Pathways & Slabs 02776-1

SECTION 02776 – CONCRETE PATHWAYS & SLABS

A. Description of Work: Construction of integrally-colored, air-entrained, polypropylene synthetic fiber reinforced concrete pathways “and/or” slabs in accordance with the Specifications. In order to keep the selected integrally-colored concrete consistent, do not add water after the batch plant has produced the mix.

1.2 SUBMITTALS

A. General: Submittal shall be accordance with Section 01330, Submittal Procedures.

B. In compliance with ASTM C 94, furnish statement of composition of concrete mix or mixes and evidence that the mix or mixes meet specified qualities in these Specifications and especially ambient conditions such as hot weather concreting.

C. Submit documentation from Synthetic Micro-Fiber Reinforcement from manufacturer that at least meets the specifications. Refer to Part 2, “Products.”

D. Submit color chips as representative samples of integrally-colored concrete as described in

Quality Assurance below for selection by the Government.

E. Other submittals listed below.

1. Curing products.

2. Proprietary cleaning agents.

3. Fibre Expansion Joint material, which may require lead time for special orders like

3/8-inch (three-eighth inch) as required to meet ADA/ABA Standards.

4. Other products for approval.

F. In compliance with ASTM C 94, submit to COR for each batch of concrete batch ticket information.

G. Low-strength concrete is under Specifications Section 02300 (Earthwork, Excavation

& Fill for Structures).

1.3 QUALITY ASSURANCE

A. In accordance with ASTM C 138, density (unit weight) testing shall be the responsibility of the

Contractor at no additional expense to the Government and submit.

1. Perform one test where COR/PI chooses anywhere on the pathway.

2. Perform one test anywhere COR/PI chooses on the slab.

B. Integrally Colored Concrete:

Painted Rocks Campground

02776-2

1. Provide submittal of color chips of the accuracy to ones prepared in a laboratory that represent the final colors of the following:

a. Yosemite Brown Davis Colors 641 or equivalent in application and color.

b. Outback Davis Colors 677 or equivalent in application and color.

c. Mesquite Davis Colors 677 or equivalent in application and color.

d. Omaha Tan Davis Colors 5084 or equivalent in application and color.

e. Western Gold Davis Colors 5844 or equivalent in application and color.

f. Cliffside Brown Davis Colors 6804 or equivalent in application and color.

2. As an alternative to the color chips, the Contractor can provide full-scale mock-ups to industry standards of the aforementioned colors.

a. Construct at least one month before start of other concrete work to allow concrete to cure before observation.

b. At location acceptable to the COR/PI, demonstrate methods used for construction, including forming and finishing conditions required for Project using materials, workmanship, joint treatments, and curing methods to be used throughout Project.

c. Accepted mock-up provides visual standard for Work.

d. Remove mock-ups when no longer required for comparison with finished work unless the mock-up conforms for quality, finish and color consistent with the Work.

1.4 PRODUCT CONDITIONS

A. Place concrete only when temperatures are above 35 degrees Fahrenheit unless the concrete is protected from freezing in accordance with industry standards.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Color Additive: Deliver, store, and handle in accordance with manufacturer’s instructions.

B. Concrete: Schedule delivery to provide consistent mix times from time color additive is placed in mixture until placement of integrally colored concrete.

2.1 CONCRETE

A. Materials: Materials, including cements, aggregates, water, and admixtures shall meet the requirements of ASTM C 94.

1. Cement: ASTM C 150, portland cement, Type II.

2. Coarse Aggregates: Maximum size, 1 inch for hand methods, and 0.75 inch for slip-form construction. For machine placed concrete, the Contractor may, with Contracting Officer's approval, modify the aggregate grading specified in ASTM C 94 to meet the recommendations of the manufacturer of the machine.

3. Refer to Fiber Reinforcement in this section.

B. Quality: Furnish concrete under Option A under Ordering Information in ASTM C 94.

C. Air Content: 4.5 percent.

D. Slump for Concrete Walks: Maximum 4 inches. Note that, if the Contractor requires more

Painted Rocks Campground

02776-3 slump, use water-reducing or super-plasticizing admixture, but do not add water.

E. Water: Clean and potable.

F. Color Additives and Mixes

1. If greater slump is required, use water-reducing or super-plasticizing admixture; do not add water.

2. Color Additives: Mix in accordance with manufacturer’s instructions. Mix until color additives are uniformly dispersed throughout mixture and disintegrating bags, if used, have disintegrated.

3. Neither retemper mix, nor add water in field.

G. Concrete Strength: 3000 psi at 28 days.

H. Manufacture and Delivery:

1. Measurement of materials, batching, mixing, transporting and delivery shall be as specified in ASTM C 94.

2. Discharge of concrete into forms within 1-1/2 hours after introduction of water to cement is a general rule; nevertheless, show by approved submittal in Specifications Section 02776, Part 1.2.B, that successful production, delivery, and finishing can be done in the stated time in the submittal.

3. Ambient conditions shall be observed, and adjustments shall be made.

I. Air Entraining Admixture: ASTM C 260, and no chlorides shall be permitted.

J. Other admixtures complying with ASTM C 494 or ASTM C 618 may be used with approval of Contracting Officer. No chlorides shall be permitted.

2.2 SYNTHETIC MICRO-FIBER REINFORCEMENT

A. 100 percent virgin multifilament…