Questions_Addressed_0002.docx
DOCX document 17 KB Posted
- Attached to
- NML PARKING LOT DRAINAGE
- Solicitation number
- 140L6221R0009
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L6221R0009_Amd_0003.pdf | ||
| Sol_140L6221R0009_Amd_0002.pdf | ||
| Sol_140L6221R0009_Amd_0001.pdf | ||
| Sol_140L6221R0009.pdf | ||
| NML_PARKING_LOT_SPECIFICATIONS.pdf | ||
| Bid_Schedule_NML_Parking_Lot_Drainage.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140L6221R0009
AMD 002
Questions Addressed Solicitation: 140L6221R0009 NML Parking Lot
1. Are all tests to be performed by the Contractor?
a. Yes
2. Spec Section 02202 calls for Cold Milling of Asphalt Paving. Does that apply to this project?
a. If contractor wants to mill the existing asphalt, they are welcome to do so instead of pulling it out in chunks. The asphalt needs to be demoed.
3. Spec Section 02223 calls for a traffic control plan and also references the milling of existing pavement. Is this necessary?
a. A traffic control plan will be needed due to we have traffic and employees at the NML and around the existing city streets. Again, the asphalt needs to be removed from site.
4. Spec Section 02533 calls for final elevations and the plans have no details as to the elevations of the existing parking lot, new elevations of the new parking lot, lid elevations of the manholes or inlet elevation of these manholes. Where are these manholes to be located?
a. The final elevations will need to be provided after the parking lot is rebuilt. What ever existing elevations are currently will change once the parking lot has been redone. The manholes are shown on the drawings. Drawing sheet C-1 shows location. They can move in order for the parking lot to drain correctly and into the sand and grease trap.
5. Spec Section 02630 calls for Cast-In-Place Catch Basins. Please provide details and/or information necessary for them.
a. The catch basin (sand and grease trap) is in the detail sheet C003.
6. Spec Section 0722 says that there is 1770 SY of crushed base. This is not consistent with the Bid Schedule. Which is accurate?
a. The bid schedule calls for 1,770 SY of reconstruct and stabilize parking lot. This is what the section 0722 summary is stating.
7. Spec Section 02820 calls for chain link fencing work. Can you provide additional information?
a. There will be an existing chain link fence and gate around the parking lot. This is for any movement or replacement of the existing chain link fence.