140L6221Q0007 AMD 0001 QUESTIONS AND ANSWERS_0001.pdf
PDF 133 KB Posted
- Attached to
- OUTLAW TRAILS PALEONTOLOGICAL INVENTORY
- Solicitation number
- 140L6221Q0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Outlaw_Trails_150ft_Centerline for Paleo Survey_0001.pdf | ||
| Sol_140L6221Q0007_Amd_0001.pdf | ||
| Cody_BLM_to_Outlaw_Trailhead.JPG | JPG image | |
| Outlaw Trails Paleontology Survey SOW 4 02 21.docx | DOCX document | |
| Sol_140L6221Q0007.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140L6221Q0007
AMENDMENT: 0001
QUESTIONS AND ANSWERS
1. Would the BLM be able to provide a project map of the area requiring survey?
A map has provided showing all the trails that need to be surveyed in the area.
This map shows the location of the trails including a 150-foot area from centerline of each trail. Thus, a 300-foot-wide strip needs to be surveyed alongside each trail as shown on the map, totaling 750 acres. Please see the map attached.
2. Is it possible to conduct an in-person file search at the local Field Office considering restrictions in place due to the COVID-19 pandemic?
Upon request, the BLM Cody Field Office Geologist will provide information on all known paleontological localities within and adjacent to the survey area, as well as PFYC and significance information, to the Contractor once awarded. Therefore, a Field Office visit will not be necessary.
3. Are Past Performance Questionnaires required for all of the client references (up to 5) listed under Part I Past Performance?
Past performance questionnaires are not needed if a list of clients is submitted for past and present similar projects covering the past three years where the point of contact and contact information (i.e. phone number and email) are submitted along with the list of clients. It is preferred that the past performance questionnaire be completed.
4. Is the BLM requiring offerors to list a summary of all previous experience in the past three years from issue date of the RFQ as stated under Past Performance on Page 14?
As stated on page 14 of Solicitation 140L6221Q0007, “list all contracts performed in the past three years from issue dated of this RFQ that are of the same magnitude and complexity of this project”.
5. Can we be provided with the mileage of the trails instead of the acreage, including the total length of the trails and the survey buffer?
The total mileage of the trails is 23.74, the survey buffer is 300 ft, 150 ft on each side of the centerline.
6. What is the actual due date?
The Response Due date is April 22, 2021, 2:00 P.M. Mountain Time