140L5724Q0038_-_Attachment_001_-_CCFO_CattleGuard-Specifications-_SOW.pdf
PDF 147 KB Posted
- Attached to
- CCFO Cattle Guards & SLFO Cattle Guards Federal contract opportunity
- Solicitation number
- 140L5724Q0038
About this file
This document appears to be a specification for cattle guard grids to be procured through a federal contract opportunity. The key details are:
The solicitation, numbered 140L5724Q0038, is for the procurement of 14-foot cattle guard grids for the Cedar City Field Office and 8-foot cattle guard grids for the Salt Lake Field Office. The grids must meet AASHTO HS-20 and HL-93 load ratings and be constructed of steel per the detailed specifications provided. The grids and associated components such as wings must be painted Federal Safety Yellow. Delivery of the products is required by August 1, 2024 to the specified locations. The procurement is set aside for small businesses under NAICS code 332312, and vendors must be registered in the System for Award Management (SAM). Quotations are due by July 9, 2024 via email to the Contract Specialist.
View the file
Other files for this federal contract opportunity
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CATTLE GUARDS SPECIFICATIONS - Cedar City Field Office
PART 1: GENERAL
14’ Cattle Guard HL-93 (Heavy Duty Grid)
a. All Steel Cattle Guard – No Cleanout
b. 14’ X 8’ X 8”
c. Painted Yellow
14’ Cattle Guard HS-20 (BLM Grid)
a. All Steel Cattle Guard – No Cleanout
b. 14’ X 8’ X 8”
c. Painted Yellow
Cattle Guard Wings
a. Include hex bolts and nuts (to attach to cattle guards)
b. Painted Yellow
See the specification drawings for: HL-9/U-80/11inch Tall Grid, Standard Cattle Guard HS-20, Cattle Guard Wings, Standard Precast Sill, HL-93/U-80/11inch Step
Note: Call ahead 24 hours prior to delivery. Call 435-865-3089 or 435-865-3000. No delivery on Fridays, Federal holidays or weekends.
1.01 SUMMARY:
A. Section Includes: Furnishing cattle guard grids and accessories.
1.02 REFERENCES:
B. American Society for Testing and Materials:
ASTM A 36-89 Structural Steel ASTM A 53 REV A-89 Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and
Seamless ASTM A 123 REV A-89 Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products ASTM A 153-82 Zinc Coating (Hot-Dip) on Iron and Steel Hardware (R 1987) ASTM A 242-89 High-Strength Low-Alloy Structural Steel ASTM A 307 REV A-88 Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength ASTM A 500-84 Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in
Rounds and Shapes ASTM A 501-89 Hot-Formed Welded and Seamless Carbon Steel Structural Tubing ASTM A 572 High-Strength Low-Alloy Columbarium-Vanadium Structural Steel ASTM A 972 Fusion Bonded Epoxy-Coated Pipe Piles
B. American Welding Society:
AWS B1.10-86 Guide for Nondestructive Inspection of Welds AWS D1.1-88 Structural Welding Code Steel
AWS WI-80 Welding Inspection
C. Federal Standard:
Federal Safety Yellow or match color no. 13655, FS 595
D. Society of Automotive Engineers:
SAE-J 429-83 Mechanical and Material Requirements for Externally Threaded Fasteners
F. Steel Structures Painting Council:
SSPC-SP-6-85 Commercial Blast Cleaning minimum
G. U.S. Department of Transportation, Federal Highway Administration:
MUTCD-2009 Manual on Uniform Traffic Control Devices, for Streets and Highways
1.03 SUBMITTALS:
A. Manufacturer's Literature: Submit one (1) copy of the manufacturer's descriptive data including design data and drawings for cattle guard grids.
1.04 QUALITY ASSURANCE:
A. Welder Qualifications: As a minimum, the welder shall meet the qualifications for: Electrodes up to and including E 7018; Steel thickness 1/8- to 3/8-inch; fillet, groove, low-hydrogen welding; or meet code qualifications for structural plate and rolled structural shapes.
PART 2: PRODUCTS
2.01 MATERIALS:
A. Cattle Guard Grids: Shall be constructed of materials as shown on the drawings and described in these specifications. Design loading of grids shall conform to AASHTO HS-20 for BLM grid and HL-93 for heavy duty grid, and dimensions shall be as shown on the drawings and the Work Data Sheet.
1. New material shall be used in the fabrication of cattle guards.
B. End Wings: Shall be as shown on the drawings.
2.02 FABRICATION:
A. Steel Cattle Guard Grids: Steel grids shall be all-welded construction. Welds shall be secure and complete along both edges of cross pieces and at joints in the frame and shall conform to AWS D1.1. Welding shall be performed according to a welding procedure specification (See AWS D1.1) which has been approved by the Contracting Officer.
B. Paint: Structural steel shall be cleaned according to SSPC SP-6, Commercial Blast Cleaning.
Cattle guard grids and end wings shall each receive a prime and finish coat. The prime coat shall be a lead free, zinc-rich, rust-inhibitive alkyd metal primer. Minimum thickness shall be 1-1/2 mils dry-film thickness (DFT). The finish coat shall be an oil alkyd-enamel, gloss paint. Minimum thickness shall be 3 mils DFT, applied in two applications. Color shall be Federal Safety Yellow or match color no. 13655, FS 595. Cattle guards shall be painted after fabrication.
2.03 SOURCE QUALITY CONTROL:
A. Plant Inspection: The contractor's manufacturing facility shall be open to the Contracting Officer during normal hours. There shall be a Contractor's Representative on the site to answer questions.
B. Material Marking: Material to be used in the fabrication process shall be labeled, marked, or otherwise segregated from differing material.
C. Weld Inspection: The quality of the weld shall be "acceptable" under the visual requirement of AWS D1.1, AWS B1.10, and AWS WI, CH16. Unacceptable welds or defects in the welds as detected by visual inspection or by radiographic, penetrant dye, or magnetic particle techniques shall be repaired or removed and replaced by methods acceptable under the applicable AWS welding codes, or the entire piece may be rejected by the Contracting Officer. Repaired or replaced welds shall be re-inspected by the applicable nondestructive testing method.
D. Sandblast Inspection: The Contractor shall notify the Contracting Officer when and where the grids shall be sandblasted so that the Contracting Officer will arrange an inspection of the sandblasting quality prior to paint application.
PART 3: DELIVERY
3.01 DELIVERY:
A. All materials must be packaged and labeled in an orderly way to keep all products clean and protected so that it can be stored until the structure is installed.
Products shall be delivered to the BLM’s Cedar City Districts Coal Creek Ware yard by August 1, 2024.
1770 N Airport Road Cedar City, UT 84721
Delivery shall occur between Monday – Thursday from 8am to 4:30 pm. No delivery will be accepted on Federal Holidays. Exact delivery date shall be coordinated with the BLM COR. The Coal Creek Ware Yard is unmanned. Vendor shall provide at least 24 hours’ notice of delivery.
BLM will have equipment to unload the delivery truck. Products must be packaged on pallets or with lifting points.
Mitch Bayles (POC) Office:(435) 865-3089 Cell: (435) 704-4930 Cedar City Field Office Front Desk (435)865-3000
END OF SECTION