Amendment_0002_140L5724Q0035_Attachment_05_Site_Tour_Notes-Q_A_0002.pdf

PDF 138 KB Posted

Attached to
Henry Mountain Field Station - Home #4 Remodel
Solicitation number
140L5724Q0035
Issued by

About this file

This document appears to be Amendment 0002 for Solicitation Number 140L5724Q0035, which is for the Henry Mountain Field Station - Home #4 Remodel project. The key details are:

The pre-bid conference discussed several aspects of the project, including the smaller-than-standard bathtub in the main bathroom, the recessed lighting that will be part of an additive alternate, the need to drop down and patch the hollow cabinets above the kitchen, and the placement of the icemaker box to prevent freezing.

The Q&A section addresses requirements to smooth out the walls from wallpaper glue, replace broken and loose stair boards, and remove the basement ceiling as needed to access plumbing. Overall, the document provides additional details and clarifications related to the scope of work for the remodel project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

104L5724Q0035 HMFS Home #4 Remodel Site tour / Prebid Conference Notes

Discussion at Pre-Bid Conference

1. Discussion occurred concerning the no typical size of the bathtub in the main bathroom. The bathtub is smaller than the standard tub 60” tub in the main bathroom. That they need to make sure they see the drawings and specifications prior to biding the job.

2. Discussion occurred about the recessed lighting. Some of the recessed lighting and electrical work will be part of an additive alternate. Please see plans an specifications for details.

3. Discussion occurred concerning the drop-down boxes above the kitchen cabinets. The cabinets are hollow and will need to be dropped and patched as described in plans and specifications.

4. Discussion occurred concerning the freezing potential of the water line being in the wall for the icemaker box. The ice maker box will be installed in the floor to help prevent it from freezing.

Questions / Answers

1. Is the rough surface on the walls created from the wallpaper glue going to be required to be smoothed out?

Answer: yes, all interior walls will need to have a light coat of drywall mud applied and sanded smooth.

2. There are 4 steps that are cracked / broken, will be required to replace the boards?

Answer: Yes, all broken boards will need to be replaced and all loose steps will need to be nailed down.

3. Can we remove the finished celling in the basement to access the plumbing?

Answer: yes, the ceiling can be removed as needed to complete plumbing work. The contractor shall be responsible toe patch all holes and finish them with like sheet rock, paint, and texture.