Amendment_0001_Attachment_09_Q_A_0001.pdf
PDF 97 KB Posted
- Attached to
- LUCIN FENCE CONSTRUCTION Federal contract opportunity
- Solicitation number
- 140L5723R0008
About this file
This document contains questions and answers regarding Solicitation Number 140L5723R0008 issued by the Department of the Interior Bureau of Land Management Utah Region for Lucin Fence Construction. The questions and answers specify requirements for fence posts, wire, and snow fence. Partial payments are permitted for delivered, inspected, and government-controlled supplies. Fence posts must be 5'6" tall, 1.33 lbs./ft., green with white tip, and certified to ASTM standards. Barbless wire must be 12.5 gauge, OK Brand premium grade, certified to ASTM standards, and 1,320 ft./roll. The referenced snow fence specifications describe a fence constructed of wood and wire that is 40% open and 60% closed. For technically acceptable ISBEE or SDB proposals, the government is willing to pay up to 5% more than other offers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 140L5723R0008_Amendment_0001_Lucin_Fence_Construciton_0001.pdf | ||
| Sol_140L5723R0008_Amd_0001.pdf | ||
| Amendment_0001_Attachment_08_Sand_Snow_Fence_Specifications_0001.pdf | ||
| 140L5723R0008_Attachment_06_Wage_Determination_UT20230096_01-06-2023.pdf | ||
| 140L5723R0008_Attachment_05_Bid_Schedule.pdf | ||
| 140L5723R0008_Attachment_02_Drawings_Maps.pdf | ||
| Sol_140L5723R0008.pdf | ||
| 140L5723R0008_Attachment_04_Wood_Wind_Sand_Fence_Pics.pdf | ||
| 140L5723R0008_Attachment_03_Avoidance_Locations.pdf | ||
| 140L5723R0008_Attachment_01_Specifications.pdf | ||
| 140L5723R0008_Attachment_07_Limitations_on_Subcontracting_Breakout.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lucin Fence Construciton Solicitation: 140L5723R0008 Questions & Answers
Ref. # Date Method Submitted Question Answer Posted Amendment #
1 7/24/2023 Email Is there an option of partial payments once the material is delivered, inspected, and the government accepts/ takes over ownership?
Partial payments are permitted under this construction contract.
For supplies/materials included within a partial payment request, they do need to be delivered, inspected, and within government control prior to that partial payment being approved. It will be up to the COR if the Government has the means to accomidate supplies/materials storage. 8/16/2023 1
2 8/7/2023 Email Steel T‐Posts….do those need to be certified? Also, 1.33#/ft or 1.25#/ft?
T‐Posts: 5'6"' T‐Post: 1.33 lbs./ft., Green with White Tip, Certified American Society for Testing and Materials (ASTM) A702‐87 and Made in the USA (Commercial Metals Company or approved equivalent). 8/16/2023 1
3 8/7/2023 Email Barbless Wire…12.5ga? Certified?
Barbless Wire: OK Brand Premium Grade (or approved equal)
12.5 gauge Class 1 Certified American Society for Testing and Materials ASTM A‐121, 1,320 ft./roll and Made in the USA (OK Brand or approved equivalent). 8/16/2023 1
4 8/7/2023 Email
Wind Fence…I saw something mentioning sand fence, but the pictures looked more like snow fence, so just trying to determine which one is needed.
These are also referred to sand fences and, at times, are synonymous with what appears to be the snow fences, but they are constructed of wood and wire (40% open and 60% closed) and not plastic. See Amemdment 0001 Attachment 08 Sand Snow Fence Specifications. 8/16/2023 1
5 8/8/2023 Email
How will the ISBEE pricing be determined to be reasonable and/or reasonable compared to other offers. For instance, should all offerors be deemed technically acceptable, and we are the apparent low and there is an ISBEE that is higher in price how much higher can they be and still be deemed reasonable?
An update was made to Section M under M‐1 Basis for Contract Award. The following was added " However, the Government is willing to pay up to 5% more for a technically acceptable ISBEE or SDB proposal. " See updated RFP attached to SF‐30. 8/16/2023 1