140L5723Q0049_Pre-Solicitation_Notice_1.pdf

PDF 171 KB Posted

Attached to
Poison Spider Trailhead Renovations Federal contract opportunity
Solicitation number
140L5723Q0049
Issued by
Department of the Interior Bureau of Land Management Utah Region

About this file

This pre-solicitation notice provides details for a planned construction project for the Poison Spider Trailhead Renovations. The Bureau of Land Management Utah State Office will issue a request for quotes on or about August 4, 2023 seeking a contractor to furnish all labor, equipment, supplies, and materials to perform work including removing an existing asphalt apron, hauling and placing 3/4-inch hot-mix asphalt, and providing permanent pavement marking. The work is to be completed within 60 days from issuance of the notice to proceed, between June and August 2024. The project is set aside only for small businesses with a size standard of $45 million. A bid bond is required and performance and payment bonds must be provided by the awardee prior to the notice to proceed.

View the file

Other files for this federal contract opportunity

Other files attached to Poison Spider Trailhead Renovations, newest first.
File Type Posted
DRAFT_Poison_Spider_Trailhead_Renovations-Plans_1.pdf PDF
DRAFT_Poison_Spider_Trailhead_Renovations-SOW_and_Specifications_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

BUREAU OF LAND MANAGEMENT

Utah State Office

440 West 200 South, Suite 500 Salt Lake City, UT 84101-1345

INTERIOR REGION 7 • UPPER COLORADO BASIN

COLORADO, NEW MEXICO, UTAH, WYOMING

Pre-Solicitation Notice BLM-Utah State Office

July 21, 2023

Solicitation Number: 140L5723Q0049

Project Identification: Poison Spider Trailhead Renovations

Point of Contract: Tori Blunt Mayes, Contracting Officer email: tbluntmayes@blm.gov

Project Location: Work is located in Grand County, UT. Poison Spider Trailhead is located on the East side of Utah, adjacent to State Route 279, 4 miles South of Hwy 95 (10 miles Travel Southwest of Moab, UT).

Magnitude of Construction: In accordance with FAR 36.204, the estimated magnitude of this construction requirement is between $100,000.00 and $250,000.00

Estimated Period of Performance: 60 days from issuance of Notice to Proceed. June 2024 – August 2024.

North American Industry Classification System (NAICS) Code: 237990 - Highway, Street, and Bridge Construction

Product Service Code: Y1LB - Construction of Highway, Roads, Streets, Bridges, and Railways

Small Business Size Standard: $45.0M

Solicitation Set-Aside: 100% Total Small Business - Only companies that qualify as a small business under the applicable size standard will be considered. A tiered evaluation preference will be used to first evaluate proposals from Indian Small Business Economic Enterprises (ISBEE); if no award can be made to an ISBEE, proposals from small disadvantage business (SDB) will be reviewed; if no award can be made to an SDB, all remaining proposals will be reviewed.

Solicitation Issuance Date: BLM-UT anticipates issuing a subsequent request for quotes (RFQ) on or about August 4, 2023, to SAM.gov. To obtain the solicitation and/or amendments/updates for this project, contractors shall monitor the solicitation at the sites mailto:tbluntmayes@blm.gov listed above. Interested parties shall periodically check for amendments and other changes to the solicitation documents. This service is provided for convenience only and does not serve as a guaranteed notification. Subscribers to this service are ultimately responsible for reviewing this site for all information relevant to this solicitation.

Registration Requirements: To be considered eligible for award, vendors must be registered and have active profiles with completed representations and certifications in the System for Award Management (SAM) database (https://sam.gov/content/entity-registration). There is NO fee to register for this site.

Site Visit: There will be a site visit Approximately 1-2 weeks after the issuance of the

RFQ.

Project Description: Contractor shall furnish all labor, equipment, supplies, and materials to perform the following work: remove existing asphalt apron; hauling and placing 3/4” Hot-Mix Asphalt (HMA); and provide permanent pavement marking.

Bonding: A Bid Bond is required. Performance and Payment Bond shall be provided by the awardee prior to issuance of the Notice to Proceed.

Attachments: These attachments are DRAFTs only. Finalized attachments will be issued with the subsequent RFQ.

https://sam.gov/content/entity-registration https://sam.gov/content/entity-registration

File details come from the government source that posted it. Updated .