140L5723Q0033_Amendment_0001_Site_Visit_Notes_Q_A_0001.pdf
PDF 231 KB Posted
- Attached to
- BLM UT-Red Cliffs Recreation Chip Seal/Flush Coat Federal contract opportunity
- Solicitation number
- 140L5723Q0033
About this file
This document contains site visit notes and questions and answers for a federal contract solicitation. The solicitation is for chip seal and flush coat services on roads at the Red Cliffs Recreation Area in Utah between July 31 and August 31, 2023. The campground will be closed during this period. Contractors will be required to attend tortious training and broom loose chips and dirt from the road before project completion, leaving only minor chips on shoulders. Paint striping will be similar but not identical to existing striping, and contractors should review drawings for layout and requirements. The related solicitation is numbered 140L5723Q0033 and is issued by the Bureau of Land Management Utah Region for chip seal and flush coat work at the Red Cliffs Recreation Area.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 140L5723Q0033_Amendment_0001_Flush_Coat_Specifications_0001.pdf | ||
| Sol_140L5723Q0033_Amd_0001.pdf | ||
| 140L5723Q0033_Amendment_0001_Chip_Seal_Specifications_0001.pdf | ||
| 140L5723Q0033_Attachment_04_Wage_Determination_UT20230045_02-03-2023.pdf | ||
| 140L5723Q0033_Attachment_03_Bid_Schedule.xlsx | XLSX spreadsheet | |
| 140L5723Q0033_Attachment_01_Plans.pdf | ||
| 140L5723Q0033_Attachment_02_SOW.pdf | ||
| 140L5723Q0033_Attachment_03_Bid_Schedule.pdf | ||
| Sol_140L5723Q0033.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140L5723Q0033 Red Cliffs Chip Seal/Flush Coat
Site Visit Notes / Q&A
1. Is the campground going to be closed? Answer: Yes, the Campground is closed July 31st 2023 through August 31st 2023.
2. Informed contractors that tortious training would be required at the pre-work conference.
3. Informed contractors about the high amount of existing loose chips and dirt on the road that will be required to be broomed. At the close of the project minor chips can be left on shoulder but we have an expectation to have a clean finished product.
4. Is the striping the same as what’s existing on the ground? Answer: The paint striping will be similar but there are changes. Review the drawings for the striping layout and requirements.