A02_Revised_Bid_Schedulev2_0003.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- HSO MOWING CONTRACT 2026 Federal contract opportunity
- Solicitation number
- 140L4326Q0045
About this file
This is a revised bid schedule for mowing services at the Horning Tree Seed Orchard near Colton, Oregon. The solicitation requires contractors to provide all labor, equipment, and materials for mowing operations across two acreage areas: approximately 171.09 acres of orchard and 109.49 acres of fallow ground. The base contract year, effective June 20, 2026 through June 19, 2027, includes one mowing operation (second mowing with diagonal cuts in both directions) to be completed between mid-July and mid-August 2026. Four optional one-year extension periods follow the same structure, with each option year requiring two mowing operations: first mowing (diagonal one direction) and second mowing (diagonal both directions) on orchard acreage, plus second mowing on fallow ground. Note that Option Year 4 shows a discrepancy with 171.49 acres listed instead of 171.09 acres for orchard items.
Bidders must submit unit prices for each line item and calculate totals for the base year and all four option years, with the grand total representing the overall contract value. Contractors must comply with Service Contract Act wage determinations, operate equipment between sunrise and sunset, maintain no more than five-foot unmowed fringe areas, and possess Oregon Farm/Forest Labor Contractor licensing if required. The award will be made to the responsible offeror whose conforming offer is most advantageous to the government based on evaluation criteria including past performance and price. This is a total small business set-aside contract under NAICS code 561730 (Landscaping Services) with electronic quote submission required by April 9, 2026.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L4326Q0045_Amd_0003.pdf | ||
| Sol_140L4326Q0045_Amd_0002.pdf | ||
| A06_2024_Orchard_Map_0001.pdf | ||
| Sol_140L4326Q0045_Amd_0001.pdf | ||
| Sol_140L4326Q0045.pdf | ||
| B03_Wage_Determinations.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Item no. | Item Description | Quantity* | Unit of Measure | Unit Price | Total |
| 0000A | Second Mowing- diagonal both directions, Orchard | 171.09 | AC | $ | $ |
| 0000B | Second Mowing- Follow Ground | 109.49 | AC | $ | $ |
| Base | |||||
| OPTION YEAR 1 | |||||
| Item no. | Item Description | Quantity* | Unit of Measure | Unit Price | Total |
| 0001A | First Mowing – diagonal one | 171.09 | AC | $ | $ |
| direction, Orchard | |||||
| 0001B | Second Mowing – diagonal | 171.09 | AC | $ | $ |
| both directions, Orchard | |||||
| 0001C | Second Mowing – Fallow | 109.49 | AC | $ | $ |
| Ground | |||||
| Total Option Year 1 | $ | ||||
| OPTION YEAR 2 | |||||
| Item no. | Item Description | Quantity* | Unit of Measure | Unit Price | Total |
| 0002A | First Mowing – diagonal one | 171.09 | AC | $ | $ |
| direction, Orchard | |||||
| 0002B | Second Mowing – diagonal | 171.09 | AC | $ | $ |
| both directions, Orchard | |||||
| 0002C | Second Mowing – Fallow | 109.49 | AC | $ | $ |
| Ground | |||||
| Total Option Year 2 | $ | ||||
| OPTION YEAR 3 | |||||
| Item no. | Item Description | Quantity* | Unit of Measure | Unit Price | Total |
| 0003A | First Mowing – diagonal one | 171.09 | AC | $ | $ |
| direction, Orchard | |||||
| 0003B | Second Mowing – diagonal | 171.09 | AC | $ | $ |
| both directions, Orchard | |||||
| 0003C | Second Mowing – Fallow | 109.49 | AC | $ | $ |
| Ground | |||||
| Total Option Year 3 | |||||
| OPTION YEAR 4 | |||||
| Item no. | Item Description | Quantity* | Unit of Measure | Unit Price | Total |
| 0004A | First Mowing – diagonal one | 171.49 | AC | $ | $ |
| direction, Orchard | |||||
| 0004B | Second Mowing – diagonal | 171.49 | AC | $ | $ |
| both directions, Orchard | |||||
| 0004C | Second Mowing – Fallow | 109.49 | AC | $ | $ |
| Ground | |||||
| Total Option Year 4 | $ |
Grand Total- Base plus Options $
File details come from the government source that posted it. Updated .