B09_Amend_1_140L4324Q0131_Eagleview_Rec_Fence_0001.pdf
PDF 224 KB Posted
- Solicitation number
- 140L4324Q0131
About this file
This document is an amendment to Solicitation No. 140L4324Q0131 for the Eagleview Recreation Area Fence Replacement project for the Bureau of Land Management (BLM) Oregon State Office. The amendment provides details from a site visit, including a list of attendees, questions and answers from the site visit, and additional supplemental questions and answers.
The key details are:
- The solicitation is for the replacement of the existing fence at the Eagleview Recreation Area in Douglas County, Oregon.
- Payment terms include progress payments for mobilization and demolition, with the remaining lump sum payments made upon completion, inspection, and acceptance of the contract.
- Contractors are required to provide a Buy American certificate, but a certificate of compliance for the cedar pickets is not required.
- All concrete footings and posts from the existing fence must be removed, though some existing post locations may be reused for the new fence.
- Water and electricity are not available on-site, as stated in the original solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L4324Q0131_Amd_0001.pdf | ||
| B08_Solicitation_140L4324Q0131_Eagleview_Recreation_Area_Fence_Replac.pdf | ||
| Sol_140L4324Q0131.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE
0001 07/23/2024
6. ISSUED BY CODE LHA
BLM OR-ST OFC PROC MGMT BR(OR952)
1220 SW 3rd Avenue, 12th Floor
PORTLAND OR 97204
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
1. CONTRACT ID CODE
4. REQUISITION/PURCHASE REQ. NO.
7. ADMINISTERED BY (If other than Item 6)
9A. AMENDMENT OF SOLICITATION NO.
140L4324Q0131
X
9B. DATED (SEE ITEM 11)
07/02/2024
I
PAGE OF PAGES
1 I 3
5. PROJECT NO. (If applicable)
CODE I
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
IXI The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers Dis extended. ra is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
E. IMPORTANT:
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Contractor Dis not Dis required to sign this document and return ______ _ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Eagleview Recreation Fence Replacement in Douglas County, Oregon for the Bureau of Land
Management, Oregon State Office
This amendment is being issued to provide information from the July 16, 2024, site visit.
Included is record of attendance, question and answers from the site visit and supplemental questions and answers received via email.
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 1 0A, as heretofore changed, remains unchanged and in full force and effect .
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED
(Signature of person authorized to sign)
Previous edition unusable
Joy R. Menguita
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
The date and time for submission of proposals is not changed.
Project: Eagleview Recreation Fence Solicitation No. 140L4324Q0131
Site visit date and time: July 16, 2024, at 9:30 AM PD
SITE VISIT ATTENDANCE
Jordan Radford, BLM Civil Engineering Technician
Aaron Ivey, Civil Engineering Technician
Dave, Sigfridson Construction, Inc.
Matt, Fineline Innovations
Hayden, England Custom Lumber
Tracey, M&T Enterprise
SITE VISIT QUESTIONS AND ANSWERS
Q1: Will payment be up front for materials?
A1: No. however, progress payments will be made as follows for mobilization (Section 001505-4.01- A) and demolition (section 001570, 4.03-B)
1. When 5% of the original contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original contract amount, whichever is the lesser will be paid.
2. When 10% of the original contract amount is earned from other bid items, 100% of the amount bid for mobilization or 10% of the original contract amount, whichever is the lesser will be paid.
3. Upon completion of work for the project, payment of the amount bid for mobilization in excess of 10% of the original contract amount will be paid.
4. The total sum of all payments shall not exceed the original contract amount bid for mobilization regardless of the fact that the Contractor may have shut down the work on the project or moved equipment away from the project and then back again.
All other payable sections of the contract are lump sum and will become awarded payments when the contract is completed, inspected and accepted.
Q2: Why cut side down on posts?
A2: Research has found the better practice to place the cut side of the post in the protector before burial.
Q3: Is water available on site?
A3: Water is not available on site. As stated in the solicitation water and electricity is not available on site. (Section 001009, 3.02-A, B)
SUPPLEMENTAL - CONTRACTOR QUESTIONS AND ANSWERS
Q1: The bid documents ask for a certificate of compliance for the cedar pickets for UC3A, which is exterior above ground, coated with rapid water runoff. The specifications call for CWF-UV clear Penetrating Oil manufactured by Flood Co. Hudson, Ohio, or approved equivalent to be applied prior to installation with two coats. Due to the fact the cedar pickets aren't treated at the manufacturer and would be treated by the contractor, can you advise how to obtain this certification?
A1: A certificate will not be required.
Q2: Is a Buy American certificate required?
A2: Yes
Q3: For the removal of the existing fence, do the concrete footings from the existing fence posts need to be removed or can the posts be cut off at ground level?
A3: The concrete footer/collar and posts must be removed from EVERY hole. Most of the posts have all decayed and have become so loose from the rot they could be pushed and broken over with a single person’s force. Current post locations need to be purged of the old material to prepare for the new post and concrete footing/collars. It may NOT be possible to reuse all current post locations of the old fence, however a good majority of them can be reutilized in order to satisfy the contract requirements. We do not want to leave hazards for future development and repairs of the property, so we ask that all old fence material be removed from the location and disposed of as per contract specifications.