SOW_NHOTIC_Billboard_1.doc
DOC document 53 KB Posted
- Attached to
- NHOTIC I84 BILLBOARD RENTAL
- Solicitation number
- 140L4324Q0078
About this file
This document is a Statement of Work (SOW) for billboard sign services on Interstate 84 to provide direction for travelers to the National Historic Oregon Trail Interpretive Center (NHOTIC).
The SOW outlines the scope of work, objectives, and requirements for the contractor. The vendor shall format and design the billboard artwork, fabricate and install the billboard materials, and replace the billboard once per year as requested by the agency. The period of performance is from June 2024 to May 2029. The contractor must submit a task list, timeline, monthly status reports, and participate in quarterly meetings and progress reviews. The Bureau of Land Management Oregon State Office has issued a related Sources Sought notice under Solicitation Number 140L4324Q0078 seeking potential sources to provide these billboard rental services. The anticipated contract type is a firm-fixed-price contract. Interested vendors are instructed to submit capability statements by April 1, 2024.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OUTLINE FOR DEVELOPING A STATEMENT OF WORK (SOW)
1.
Introduction and Overview
This statement of work will be issued under contract [name of contract and contract number]. The National Historic Oregon Trail Interpretive Center (NHOTIC) is requesting billboard sign services on I-84 providing direction for travelers to National Historic Oregon Trail Interpretive Center.
1.1 Background
The National Historic Oregon Trail Interpretive Center (NHOTIC or Center) is eastern Oregon’s premier Oregon Trail museum, operated by the Bureau of Land Management since 1992. The NHOTIC serves as a landmark along the National Historic Oregon Trail System, as well as serving as an educational and interpretive center—showcasing the unique cultural and natural history of the region. The Center features exhibits focused on life of those that embarked on the Oregon Trail, discovery areas with interactive components, and trail access to preserved wagon ruts.
Visitors come from all over the country. The Center is located five miles outside of Baker City and there can be confusion regarding location and directions. Directional signage is a crucial tool for operational success.
1.2
Scope of Work
The NHOTIC is seeking a vendor to provide billboard sign services on I-84 providing direction for travelers to National Historic Oregon Trail Interpretive Center.
The vendor shall format and design work to the billboard specifications based on designs submitted by the agency. The vendor shall fabricate and install the billboard materials. The vendor shall replace the billboard once per year, at the agency’s request.
1.3 Objectives
Work with the agency to format and design attractive directional signage for motorists to locate the National Historic Oregon Trail Interpretive Center.
Fabricate and install billboard materials on a yearly basis.
1.4 Period of Performance
The period of performance would be from June 2024 to May 2029.
2.
References
All applicable documents referenced in this SOW are listed below. Where appropriate, a brief annotation should be provided to indicate the relevance of the document. Reference any specific requirements with regard to the use of these documents in performing the work under this SOW.
3.
Requirements
This section defines the requirements in terms of tasks to be performed, the end results/deliverables to be achieved, and the schedule of key dates. Important compliance requirements should be included with the task descriptions and deliverables.
3.1 Tasks
The tasks to be performed under this contract shall be described in discrete functional areas, or subtasks, with each work area described clearly and completely. The contractor shall submit a task list and timeline to the COR and CO for review. The Task list and Timeline may include the following elements as needed but not limited to:
1. Finalize design artwork submitted by the agency
2. Format artwork submitted by the agency to billboard specifications
3. Fabricate billboard materials
4. Install billboard materials 3.2 End Results/Deliverables
Professional billboard design, fabrication and installation services that aid in the directional outreach for tourists visiting the National Historic Oregon Trail Interpretive Center.
3.3 Schedules/Milestones
The schedule will be flexible to accommodate the agency’s annual change in billboard artwork.
3.3.1 Who Does What When Report
The "Who does what when" report shall be provided by the contractor with the initial submission, and again following negotiations. This report will be used by the Government to assess the adequacy of the resources proposed by the contractor to accomplish the SOW.
3.4 Other Considerations
OR/WA BLM has instituted a review process under 1550-OR-8 requiring that the State Office sign off on any produced media for the state. The BLM in conjunction with the COR will be responsible for submitting approval paperwork at each step of the process. This will include the script, narrative, edited video, and final protect. If the BLM approves an element and then later determines that it is no longer approved, the BLM will incur the cost of the change order.
4.
Progress/Compliance
The Government requires the following from contractors in order to monitor progress and ensure compliance:
SYMBOL 183 \f "Symbol" \s 10 \h Monthly Status Report
SYMBOL 183 \f "Symbol" \s 10 \h Quarterly Meetings
SYMBOL 183 \f "Symbol" \s 10 \h Quarterly Progress Report
SYMBOL 183 \f "Symbol" \s 10 \h Project Management Team (PMT) Meetings
SYMBOL 183 \f "Symbol" \s 10 \h Program Reviews
SYMBOL 183 \f "Symbol" \s 10 \h Outlines and Drafts
5.
Transmittal/Delivery/Accessibility
The contractor shall provide one electronic proof for approval before fabrication and installation.
File details come from the government source that posted it. Updated .