140L4321Q0049_Cone_Collection_Syn-Sol_Package.pdf
PDF 6 MB Posted
- Attached to
- Cone Collection, Roseburg District, Oregon
- Solicitation number
- 140L4321Q0049
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L4321Q0049.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RDO Cone Collection, Roseburg, Oregon SOLICITATION NO. 140L4321Q0049
BLM Roseburg District Page 1 of 13
Combined Synopsis/Solicitation
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in
FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.
Solicitation no. 140L4321Q0049 has been issued as a Request For Quotation for a firm fixed price commercial item services contract for Roseburg District Cone Collection, located within the vicinity of the Roseburg District BLM area of responsibility. Please see the attached Schedule of Items and
Statement of Work.
The performance period is from date of award through October 15, 2021.
The solicitation document and incorporated provisions and clauses are those in effect through Federal
Acquisition Circular 2021-06 published July 12, 2021.
The provision at 52.212-1, Instructions to Offerors - Commercial, applies to this acquisition.
The provision at 52.212-2, Evaluation - Commercial Items, applies to this acquisition. The following factors shall be used to evaluate offers: Price. Options will be evaluated in accordance with provision
52.212-2, Evaluation-Commercial Items:
EVALUATION-COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
Price.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the
Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
Offerors are advised to submit a completed copy of the provision at 52.212-3, Offeror Representations and Certifications - Commercial Items, with its offer.
The clause at 52.212-4, Contract Terms and Conditions - Commercial Items, applies to this acquisition.
BLM Roseburg District Page 2 of 13
The clause at 52.212-5 Contract Terms and Conditions Required to Implement Statutes Or Executive
Orders - Commercial Items, applies to this acquisition, as well as the following clauses: 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards; 52.209-6, Protecting the
Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for
Debarment; 52.219-6, Notice of Total Small Business Set-Aside; 52.219-28, Post Award Small Business
Program Rerepresentation; 52.222-3, Convict Labor; 52.222-21, Prohibition of Segregated Facilities;
52.222-26, Equal Opportunity; 52.222-36, Equal Opportunity for Workers with Disabilities; 52.222-50, Combating Trafficking in Persons; 52.223-18, Encouraging Contractor Policies to Ban Text Messaging
While Driving; 52.225-13, Restrictions on Certain Foreign Purchases; 52.232-29, Terms for Financing of Purchases of Commercial Items; 52.232-33, Payment by Electronic Funds Transfer-System for Award
Management; 52.222-41, Service Contract Labor Standards; 52.222-42, Statement of Equivalent Rates for Federal Hires; 52.222-55, Minimum Wages Under Executive Order 13658; 52.222-62, Paid Sick
Leave Under Executive Order 13706.
This requirement is set-aside for SMALL BUSINESS. The NAICS code is 113210 (Forest Nurseries and
Gathering of Forest Products) and the small business size standard is $12.0M.
The basis of award is the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. Award will be made to the responsible respondent pursuant to FAR subpart 9.1.
Responses shall be received via email at blm_or_so_952_mail@blm.gov by Tuesday July 20, 2021 at
10:00 am Pacific Daylight Time. Please include the solicitation number in the subject of the email.
BLM Roseburg District Page 3 of 13
Schedule of Items
Basic Requirement
Line Item Description Quantity Unit Unit Price Total Cost
0001 Sugar Pine –
Orchard Collection
2500* CN $ $
Total $
CN = Cone
* = Estimated
Option Items
Line Item Description Quantity Unit Unit Price Total Cost
0002 Roseburg Ponderosa Pine 400* BU $ $
0003 Roseburg Jeffrey Pine 200* BU $ $
0004 Roseburg Incense Cedar 30* BU $ $
0005 Medford Ponderosa Pine 250* BU $ $
0006 Medford Jeffrey Pine 150* BU $ $
Total $
Total – Base plus Options $
BU = Bushel
* = Estimated
Period of Performance: Date of Award – 10/31/2021
BLM Roseburg District Page 4 of 13
STATEMENT OF WORK
GENERAL
1.0 Description of Work
The purpose of this purchase order is to provide cone collection services for the 2021 season.
This order will provide for the collection of 3,000 Sugar Pine cones from Western Oregon
BLM Orchards and additional cone collection from optional line items totalling approximately 500-800 bushels. Option items for the Roseburg District (Line Items 0007) will be the preferred option, assuming an acceptable cone crop. However, if there is not an adequate cone crop in the Roseburg District, other options may be exercised. Items in the
Medford District (0005, excluding 0005AL) may be wild cones or seed orchard collection.
Items in the Northwest Oregon District (0003) are seed orchard collection, generally within the Upper Willamette, Siuslaw, and Cascades Resource Areas. Specific collection requirements for seed zone and elevation will be provided at prework. Vendors are not required to quote on all Districts listed in the schedule. This Purchase Order requires identification of seed trees, collection of healthy, mature cones by species, and documentation to be in compliance with its term, specifications, clauses and provisions. Timeliness in meeting the requirements of this contract is vital due to potential loss of seed from over mature cones.
1.2 Location of Project
Field Collections are located on BLM-managed lands in Oregon. (See Attachment 2, Seed
Zone Maps by Species and District).
1.3 Access to Project Areas
Road Gates - Some collection sites are behind locked gates that may require a key provided by the Government. Keys shall be checked out using form DI-105, Receipt for Property.
Gates with locks shall be locked immediately after entry or exit of roads to collection sites.
Gate keys shall be returned to the Contracting Officer’s Representative (COR) within five (5) days of completing collection work. A charge of $200.00 will be assessed for each gate key not returned and will be deducted from the final payment.
Access to collection sites will be over BLM logging roads with a variety of surfaces, such as paved, gravel, or dirt. Four-wheel-drive vehicles may be required. Fallen trees may need to be cut from across roads to gain access to some units. These roads shall only be cleared after fire season has ended and other units can be surveyed which are accessible. Most collections sites are within ½ mile or less of a drivable road.
1.4 Unique Features of the Project Areas
1.4.1 Seed Zone maps within the contract depict approximate unit boundaries. Slopes on the survey units will vary from gentle (20%) to very steep (80%+). Vegetation varies from grasses to brush and hardwood species with densities from low to high.
1.5 Fire Season
The Contractor shall be aware of all applicable restrictions in effect under Oregon
BLM Roseburg District Page 5 of 13
Department of Forestry fire season requirements and will stay informed regarding any changes in restrictions. The Contractor shall obtain the required waiver for cone collecting from State of Oregon Department of Forestry. The Permission to Operate shall be obtained when a close-down order is in effect.
2.0 DEFINITIONS
a) Acceptable Cones – Cones from the current calendar year and are free of insect, disease, mechanical, or climatic damage. Cones have a minimum number of sound, mature seed and are considered sufficiently mature for collection.
b) Bar lock - A plastic fastener , that can only be tightened, or zip-tie used for securing the bag opening.
c) Bole - The trunk of a tree.
d) Bushel - Eight (8) U.S. dry gallons. The conversion is as follows: 1 U.S. bushel =
35.23907017 liters = 8 dry gallons = 9.309177489 liquid gallons.
e) Canopy – The above ground portion of a plant community formed by plant crowns.
f) Climber – Individual who has a minimum of two (2) years experience climbing trees for cultural and cone collection purposes or has received tree climbing training.
g) Closed Cone - A conifer cone in which the cone scales are closed and seed has not dispersed.
h) Cone Cutter – A sharp device used to cut the cone, such as a large knife or cleaver.
i) Cone Collection Tag – The Government provided plastic tag used to identify species, elevation, year collected, tree location, date, and name of collector. (See Attachment 3, Field Cone Collection Tag).
j) Cone Lot –The species, seed zone, elevation, and estimated number of bushels desired specific for an individual item on the order. (Refer to definitions of Elevation and Seed Zone as follows.)
k) Crown – The part of the tree consisting of limbs, branches, twigs and leaves.
l) Cut Cone Test - A method used to determine seed yield which includes the count of seed on the cut face exhibiting the highest exposed filled seed count.
m) Cut Face – The exposed face of one side of a cone. The cone is cleanly sliced a bit off center, lengthwise along the cone axis exposing the inside of the cone and seeds.
Incense Cedar is cut widthwise.
n) DBH (diameter-at-breast-height) – Diameter of tree measured, in inches, at breast height
(4 feet from ground) on uphill side of tree.
o) Elevation – The specific collection bandwidth within the seed zone for each species (refer
BLM Roseburg District Page 6 of 13 to Attachment 4, Reference Sheet for Field Cone Collection).
p) Filled Seed – The seed exposed by the cut cone test which is sound and mature.
q) Flaring - A mature conifer cone with open cone scales allowing seed dispersal and loss.
r) Orchard Ladder – A ladder that has two stationary legs and one pivoting, tripod support leg. The tripod leg is used for support, eliminating the need to
“rest” the ladder against the tree for stabilization. The ladder ranges from 8 to 16 feet in height.
s) Seed Tree – A specific tree identified for cone collection.
t) Seed Zone – A designated area with defined boundaries in which soil and climate are sufficiently uniform to indicate high probability for maintaining a relatively uniform genetic composition. Seed zones may have more than one elevation band width depending on species (refer to
Attachment 4, Reference Sheet for Field Cone Collection).
u) Sound Mature Seed – The actual seed condition will vary by species. Endosperm and embryo are developing normally. There is no evidence of insect, disease, mechanical or climatic damage. Seeds are considered sufficiently mature when the embryos fill at least
90% of the cavity within the storage tissue (a cavity is formed within this tissue irrespective of the presence of an embryo). Refer to Attachment 5, Diagram of a Mature
Conifer Seed.
v) Top Third of the Crown – The portion of the crown located within six (6) feet of the tree truck and below the one-inch diameter of the trunk.
w) Unique Tree Number – A unique number given by the contractor for each selected tree.
(Refer to Attachment 6, Field Seed Tree Location Report;
Attachment 7, Field Cone Collection Record; and
Attachment 3, Field Cone Collection Tag).
3.0 CONTRACTOR-FURNISHED ITEMS
The Contractor shall provide all necessary tools, equipment, labor, transportation and materials necessary to accomplish cone collection except for those items specified under 4.0, Government-Supplied Materials.
The Contractor shall comply with all State Safety and Occupational Safety and Health
Administration (OSHA) regulations for all operations. The Government will not provide safety personnel. Failure to provide qualified safety personnel shall result in a notice of non-compliance.
The Contractor shall provide a communications system that adequately allows the contractor’s representative and the contractor’s employees to be in communication at all times while performing the contract in accordance with State Regulation OAR 437-06.
State safety regulations require that crew members shall not be left alone, unsupervised, and that accessibility to emergency transportation shall be provided by the Contractor at all times.
BLM Roseburg District Page 7 of 13
3.1 Supervisor Requirements
3.2 The Contractor shall designate one fluent, English speaking and literate supervisor for each crew. Supervisors shall be identified by the Contractor at the prework conference. The supervisor shall be present at the work site each work day. If a supervisor is not present, the employees of the Contractor will not be permitted to work. Any changes in supervisor designations must be submitted in writing to the COR at least 24 hours prior to the change taking effect.
3.3 The person designated by the Contractor as supervisor must actually perform in that capacity by:
a. making periodic inspections of the crew’s work;
b. advising them of any discrepancies found in the work that deviate from the specifications and provide instruction to correct any improper work.
3.4 The supervisor shall have a copy of the purchase order, and know the requirements of the order including technical requirements. The COR will not act as a supervisor to the crew(s).
The COR may require that the supervisor act solely as the supervisor and perform no other work if work quality is found to be below acceptable quality standards.
3.5 Crew Requirements
3.5.1 The Contractor shall maintain an adequate work force at all times to ensure timely completion of the work. Prior notice must be given to the COR if there is a significant change in crew personnel or working schedule. Crew size shall be adequate to keep up with cone ripening and cone collections before cones flare and seed is lost due to dispersal. A crew is considered to be a group of two (2) or more workers capable of collecting cones in a timely manner. Each crew shall have a supervisor or crew leader designated by the supervisor.
3.5.2 Contractor shall be responsible for the crew(s) knowledge and performance of the requirements of the purchase order, and keeping the COR informed of crew location.
3.5.3 The Contractor shall attend a pre-work meeting and present a written performance plan acceptable to the Government which includes crew size including number of climbers and work progress plan.
3.5.4 Camping on BLM administered land will only be permitted in approved sites and with the prior authorization of the COR. Should such a work camp be authorized, the Contractor shall maintain the camp in an orderly and sanitary manner. This will require portable sanitation units at all sites. All fire regulations and permits shall be followed. Requests for camping authorization shall be made in writing.
3.5.5 Any refuse, debris or garbage generated by the Contractor or its crew members shall be cleaned up and removed from the camp and project sites by the Contractor and disposed of legally off site before payment is made.
3.6 Supplies/Property
BLM Roseburg District Page 8 of 13
3.6.1 The Contractor shall furnish all necessary supplies and equipment, not provided by the
Government in Section 4.0.
3.6.2 The Contractor shall assure all equipment is safe and adequate to perform the work. All climbing equipment shall meet OSHA safety standards for tree climbing. Equipment shall be well maintained and the Contractor shall be responsible for keeping the equipment in such condition.
3.6.3 The Contractor is solely responsible for the security of its equipment and materials.
4.0 GOVERNMENT SUPPLIED MATERIALS
4.1 The Contractor assumes liability for damage or loss of Government supplied materials. The
Contractor shall return all remaining Government supplied materials in working condition upon completion of the work.
4.2 Maps - Refer to Attachment 2
a. Seed Zones Maps by Species and District
4.3 Materials
a. Cone bags and Barlocks
b. Field Cone Collection Tags (Refer to Attachment 3)
c. Measuring buckets
4.4 Report and Record Templates
a. Field Seed Tree Location Report (Attachment 6)
b. Field Cone Collection Record (Attachment 7)
c. Private Property Authorization for Collection (Attachment 8)
5.0 SPECIFICATIONS
5.1 General
5.1.1 Cone collect generally occurs August through October. All cones picked by the Contractor’s crews remain the property of the Government.
5.1.2 The Contractor shall provide a work schedule at prework that demonstrates how the work can be completed within the performance time. The work schedule shall explain how the
Contractor will adjust the schedule to account for maturity of cones, weather, and other unforeseeable factors.
5.1.3 The Contractor shall provide a Quality Control Plan (QCP) within ten (10) days before commencement of the work based on the items awarded to the Contractor.
5.1.4 The QCP must demonstrate how the Contractor will assure quality and meet the requirements and specifications of the contract. The QCP shall describe monitoring to assure how quality will be monitored to assure that cone collection meets the standards for tree selection, cone testing, cone collection, safety and other associated tasks.
5.2 Locate and Select Cone Lot Seed Trees
BLM Roseburg District Page 9 of 13
5.2.1 At the time of the award, the Government will identify the District, species, seed zone, elevation, and desired number of bushels for each cone lot. Production rates determine the minimum bushel amount collected for each selected seed tree. Species with a production rate of 3 BU per day shall have a minimum of ½ BU of acceptable cones. Species with a production rate of 4-5 BU per day shall have a minimum of 1 BU of acceptable cones.
5.2.2 The Contractor will receive a District map identifying the general location of the selected seed trees and the estimated number of trees to be climbed for that cone lot. The Contractor will be paid a per BU price except as identified for Sugar Pine.
5.3 Field Cone Collection
5.3.1 General Collection
5.3.1.1 The Contractor shall determine when the cones are ready to pick and inform the Government.
The Contractor and Government will set a day to start collection. The Contractor shall plan the collection and sequence of collection to collect mature cones, prior to flaring. After work has started, it shall progress in accordance with contract performance levels and the work progress plan while conditions are satisfactory.
5.3.1.2 The Contractor shall collect cones in a manner that shall not cause excessive damage to the tree being climbed or surrounding trees. The limbs and trunks shall not be skinned or peeled which may cause excessive damage to the cambium. Live branches shall not be deliberately broken, barked, or cut unless approved by the COR for ladder placement.
5.3.1.3 Trees that are picked shall be clearly identified with flagging marked with the same unique tree number used in the Field Seed Tree Location Report. If the COR is not present when the cones are collected from a tree, the Contractor shall tie a piece of flagging in a visible area at the highest point in the tree from which the cones were collected.
5.3.2 Determine Cone Quality - Cut Cone Test
5.3.2.1 Cone quality shall be determined on the basis of the cut cone test. Each tree shall be sampled prior to cone collection to determine if seed is sound and mature. These cones shall be representative of the entire cone crop for that individual tree.
5.3.2.2 The Contractor shall collect and cut a minimum of six (6) cones to determine cone quality and the number of filled seeds. At least two (2) cones are sampled from the bottom, middle, and top of the tree. If the COR is not present at the time of collection, all cut cones shall be bagged separately and placed at the base of the tree from which they were removed.
5.3.2.3 Most cut cone tests shall be made by slicing the cone lengthwise through the central axis.
Incense Cedar is cut widthwise. The number of mature seed is determined by counting exposed seed on one open cut-face.
5.3.2.4 Only seed that has been sliced open sufficiently so that the inside of the seed is readily visible is counted as filled seed. Seed that is not sliced open is ignored. Only mature, sound seed is counted as filled seed. (Refer to 2.0 Definitions)
5.3.2.5 Cones shall meet the average number of filled seeds per cut-face as listed below to be acceptable. Refer to Attachment 4 Reference Sheet for Field Cone Collection.
BLM Roseburg District Page 10 of 13
Common Name Scientific Name Average Number of Filled
Seeds per Cut Face
Pacific Silver Fir Abies amabilis
50% or more full seed cavities with exposed seed
White Fir Abies concolor
Grand Fir Abies grandis
Shasta Red Fir Abies magnifica
Noble Fir Abies procera
Port Orford-cedar Chamaecyparis lawsoniana 3
Alaska Yellow-cedar Chamaecyparis nootkatensis 2
Incense Cedar Calocedrus decurrens 2
Engleman Spruce Picea engelmannii 10
Lodgepole or Shore Pine Pinus cortorta 6
Jeffry Pine Pinus jeffreyi 10
Sugar Pine Pinus lambertiana 10
Ponderosa Pine Pinus ponderosa 10
Western Red cedar Thuja plicata 2
Western Hemlock Tsuga heterophylla 4
5.3.2.6 The Contractor shall record the number of filled seed per cut face on the Field Cone
Collection Record (Refer to Attachment 7, Field Cone Collection Record).
5.3.3 Cone Collection
5.3.3.1 The Contractor may be required to collect from trees which yield less than one bushel per tree.
5.3.3.2 Collect all mature cones in the top third of the crown of the tree or as directed by the COR.
5.3.3.3 Cones shall be from the current calendar year. Cones shall be dry, free of mold and not showing damage by animals, disease, insects, or physical damage.
5.3.3.4 Only cones with mature, sound seed shall be used in the collection. The Contractor shall discuss with the COR when the seed quality is questionable.
5.3.3.5 Characteristics of Sound, Mature Seed: (Refer to 2.0 Definitions and Attachment 5, Diagram of a Mature Conifer Seed).
(a) Endosperm and embryo are developing normally. There is no evidence of insect, disease, mechanical, or climatic damage and deformities.
(b) Embryo filling at least 90% of the embryonic cavity
(c) Embryo is creamy yellow to pale green and the cotyledons visible with a 10x hand lens.
(d) Storage tissue is white, not translucent, firm (nut-like in texture) with little or no shrinkage after drying.
(e) Seed wing is tan to golden brown, brittle after drying and easily detached from the cone scale.
(f) Cones have slight flexing of scale margins and golden to medium brown. Noble and
Shasta fir may be purplish or greenish grey.
BLM Roseburg District Page 11 of 13
5.3.4 Cone Care
5.3.4.1 Cones are live plant material and as such shall not be handled roughly or exposed to damaging conditions. Individual cones shall not be dropped on the ground. Cones shall not be collected from the ground.
5.3.4.2 The Contractor shall not throw bags or other approved collection containers for collecting cones from the trees to the ground. Collection bags or other approved containers must be lowered to the ground using ropes.
5.3.5 Cone Bagging and Tagging
5.3.5.1 Cones shall be placed into the bushel bag, clean and free from debris. Cone bags shall not be contaminated with needles, twigs, trash or cones of other species.
5.3.5.2 There shall be no more than one (1) bushel of cones per bag. Cones from multiple trees of the same species within the same seed zone may be combined to make a bushel. The
Contractor shall fill out the cone collection tag. Refer to Attachment 3, Field Cone Collection
Tag.
5.3.5.3 Each bag of cones shall be identified with a cone collection tag. Cone collection tags have two parts. The Contractor shall clearly write each part of the cone collection tag with permanent black markers. Place the bottom part of the tag inside the cone bag. Attach the upper portion of the cone collection tag to the cone bag with a bar lock. The cone bag shall be secured, four to six inches from the top of the bag, with a bar-lock.
5.3.5.4 Measured and tagged bags shall be left in the shade of trees until the time they are transported.
5.3.6 Cone Delivery
5.3.6.1 When the COR is present during collection, the Government will accept delivery on site. The delivery of cones to a specified location may be required in some instances. If delivery of cones is required, cone handling specifications and drop off locations shall be identified at the pre work conference.
5.3.6.2 The Contractor shall fully complete the Field Cone Collection Record each day. The Record shall be submitted to the Government with each cone lot.
5.4 Restoration of Resources
5.4.1 Cleanup - The Contractor is responsible for cleaning up all camp and worksites before leaving the area. Final payment may be withheld until the Contractor has complied with this requirement.
5.4.2 Access Roads - Public or private access roads damaged by the Contractor shall be restored, at the Contractor’s expense, to the same condition they were in at the commencement of work.
BLM Roseburg District Page 12 of 13
6.0 PERFORMANCE SUMMARY
Specification Work
Requirement Performance Standard
Government
Method of
Assessment
Deductions for Meeting
Standard
5.2 & 5.3
Field Selected
Tree
Trees selected for collection meet requirements as stated in 5.3.1,.5.3.2, 5.3.3
Periodic inspection of tree selected for cone collection.
Failure to meet minimum standards results in rejection of selected tree(s) and may result in the contractor reselecting trees for cone collection.
5.3.3
Field Tree
Identification
Selected trees correctly identified.
Periodic inspection of trees selected.
Failure to meet minimum standards result in rejection of the cones collected.
5.2.3, 5.3.3
5.3.4
5.4.2.6
5.4.5.2
5.4.6.2
Record Keeping All records are correctly maintained and submitted.
Periodic inspection and verification of written records.
Failure to maintain records may result in a stop in work until the corrections are made.
5.4.1
5.4.1.2
5.4.3.2
Cone Collection
Methods
Cone collection methods shall meet all requirements listed under the specifications.
Periodic field observation
Failure to meet listed specifications will result in rework or work suspension until corrections are made.
5.4.2
5.4.3
Field Cone
Collection
95% of the mature cones are collected in the upper 1/3 of the selected tree.
Periodic inspection of the tree selected.
Failure to meet the minimum standards results in rejection of a completed tree. The Contractor shall rework the tree to establish compliance.
5.4.2
5.4.3.5
Field Seed
Quality
Cut Cone Test indicates seeds are mature and the average number of mature filled seed per cut face meets minimum requirements.
Periodic sample of cones using cut cone test and examination of contractors test cones.
Failure to meet minimum standards results in rejection of cones.
5.4.4
Cone Care 100% of cones delivered to
Government are cared for properly
Periodic field
Observation
Rejection of affected cones.
5.4.5.1
5.4.5.2
Cone Bagging Less than 5% of the bag may have debris and unacceptable cones. Bags are filled no more than 1 bushel per bag.
Periodic inspection may occur in the field or other location.
Contractor shall rework unacceptable bags.
5.4.5.3
Cone Tagging All tags are properly filled out with one tag in bag and one secured to top of outside of bag.
100% Inspection Failure to meet standards results in rejection of bag in question.
(End of Statement of Work)
BLM Roseburg District Page 13 of 13
CONTRACT DOCUMENTS, EXHIBITS OR ATTACHMENTS
Attachment No. Title Pages
1 Service Contract Act Wage Determination 4
The latest wage determination shall be incorporated at the time of award.
2 Vicinity Maps 5
3 Field Cone Collection Tab 2
4 Reference Sheet for Field Cone Collection 1
5 Diagram of a Mature Conifer Seed 1
6 Field Seed Tree Location Report 1
7 Field Cone Collection Record 1
8 Authorization for Cone Collection on Private Land 1
(End of Contract Documents, Exhibits or Attachments)
4/30/2021 SAM.gov https://beta.sam.gov/wage-determination/1977-0079/64 1/4
"REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 1977-0079 Daniel W. Simms Division of | Revision No.: 64 Director Wage Determinations| Date Of Last Revision: 03/15/2021 Note: Under Executive Order (EO) 13658 an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1 2015. If this contract is covered by the EO the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination if it is higher) for all hours spent performing on the contract in calendar year 2021. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
State: Oregon
Area: Oregon Statewide **Fringe Benefits Required Follow the Occupational Listing**
Employed on contract(s) for Forestry and Logging Services.
OCCUPATION CODE - TITLE FOOTNOTE RATE
08010 - Brush/Precommercial Thinner 16.88 08040 - Choker Setter 17.00 08070 - Faller/Bucker 30.01 08100 - Fire Lookout 16.33 08130 - Forestry Equipment Operator 19.73 08160 - Forestry/Logging Heavy Equipment Operator 19.73 08190 - Forestry Technician 21.74 08200 - Forestry Truck Driver 17.27 08250 - General Forestry Laborer 13.59 08280 - Nursery Specialist 22.61 08310 - Slash Piler/Burner 10.87 08340 - Tree Climber 10.87 08370 - Tree Planter 15.30 08400 - Tree Planter Mechanical 15.30
Note: Executive Order (EO) 13706 Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1 2017. If this contract is covered by the EO the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness injury or other health-related needs including preventive care; to https://beta.sam.gov/wage-determination/1977-0079/64 2/4 assist a family member (or person who is like family to the employee) who is ill injured or has other health-related needs including preventive care; or for reasons resulting from or to assist a family member (or person who is like family to the employee) who is the victim of domestic violence sexual assault or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
ALL OCCUPATIONS LISTED ABOVE RECEIVE THE FOLLOWING BENEFITS:
HEALTH & WELFARE: $4.54 per hour up to 40 hours per week or $181.60 per week or $786.93 per month
HEALTH & WELFARE EO 13706: $4.22 per hour up to 40 hours per week or $168.80 per week or $731.47 per month*
*This rate is to be used only when compensating employees for performance on an SCA-covered contract also covered by EO 13706 Establishing Paid Sick Leave for Federal Contractors. A contractor may not receive credit toward its SCA obligations for any paid sick leave provided pursuant to EO 13706.
VACATION: 2 weeks paid vacation after 1 year of service with a contractor or successor; and 3 weeks after 10 years. Length of service includes the whole span of continuous service with the present contractor or successor wherever employed and with the predecessor contractors in the performance of similar work at the same Federal facility. (Reg. 29 CFR 4.173)
HOLIDAYS: A minimum of ten paid holidays per year: New Year's Day Martin Luther King Jr.'s Birthday Washington's Birthday Memorial Day Independence Day Labor Day Columbus Day Veterans' Day Thanksgiving Day and Christmas Day. (A contractor may substitute for any of the named holidays another day off with pay in accordance with a plan communicated to the employees involved.) (See 29 CFR 4.174)
** UNIFORM ALLOWANCE **
If employees are required to wear uniforms in the performance of this contract (either by the terms of the Government contract by the employer by the state or local law etc.) the cost of furnishing such uniforms and maintaining (by laundering or dry cleaning) such uniforms is an expense that may not be borne by an employee where such cost reduces the hourly rate below that required by the wage determination. The Department of Labor will accept payment in accordance with the following standards as compliance:
The contractor or subcontractor is required to furnish all employees with an adequate number of uniforms without cost or to reimburse employees for the actual cost of the uniforms. In addition where uniform cleaning and maintenance is made https://beta.sam.gov/wage-determination/1977-0079/64 3/4 the responsibility of the employee all contractors and subcontractors subject to this wage determination shall (in the absence of a bona fide collective bargaining agreement providing for a different amount or the furnishing of contrary affirmative proof as to the actual cost) reimburse all employees for such cleaning and maintenance at a rate of $3.35 per week (or $.67 cents per day). However in those instances where the uniforms furnished are made of ""wash and wear"" materials may be routinely washed and dried with other personal garments and do not require any special treatment such as dry cleaning daily washing or commercial laundering in order to meet the cleanliness or appearance standards set by the terms of the Government contract by the contractor by law or by the nature of the work there is no requirement that employees be reimbursed for uniform maintenance costs.
** SERVICE CONTRACT ACT DIRECTORY OF OCCUPATIONS **
The duties of employees under job titles listed are those described in the ""Service Contract Act Directory of Occupations"" Fifth Edition (Revision 1) dated September 2015 unless otherwise indicated.
REQUEST FOR AUTHORIZATION OF ADDITIONAL CLASSIFICATION AND WAGE RATE
Standard Form 1444 (SF-1444)
Conformance Process:
The contracting officer shall require that any class of service employee which is not listed herein and which is to be employed under the contract (i.e. the work to be performed is not performed by any classification listed in the wage determination) be classified by the contractor so as to provide a reasonable relationship (i.e. appropriate level of skill comparison) between such unlisted classifications and the classifications listed in the wage determination. Such conformed classes of employees shall be paid the monetary wages and furnished the fringe benefits as are determined (See 29 CFR 4.6(b)(2)(i)). Such conforming procedures shall be initiated by the contractor prior to the performance of contract work by such unlisted class(es) of employees (See 29 CFR 4.6(b)(2)(ii)). The Wage and Hour Division shall make a final determination of conformed classification wage rate and/or fringe benefits which shall be retroactive to the commencement date of the contract (See 29 CFR 4.6(b)(2)(iv)(C)(vi)). When multiple wage determinations are included in a contract a separate SF-1444 should be prepared for each wage determination to which a class(es) is to be conformed.
The process for preparing a conformance request is as follows:
1) When preparing the bid the contractor identifies the need for a conformed occupation(s) and computes a proposed rate(s).
2) After contract award the contractor prepares a written report listing in order the proposed classification title(s) a Federal grade equivalency (FGE) for each proposed classification(s) job description(s) and rationale for proposed wage rate(s) including information regarding the agreement or disagreement of the https://beta.sam.gov/wage-determination/1977-0079/64 4/4 authorized representative of the employees involved or where there is no authorized representative the employees themselves. This report should be submitted to the contracting officer no later than 30 days after such unlisted class(es) of employees performs any contract work.
3) The contracting officer reviews the proposed action and promptly submits a report of the action together with the agency's recommendations and pertinent information including the position of the contractor and the employees to the Wage and Hour Division U.S. Department of Labor for review (See 29 CFR 4.6(b)(2)(ii)).
4) Within 30 days of receipt the Wage and Hour Division approves modifies or disapproves the action via transmittal to the agency contracting officer or notifies the contracting officer that additional time will be required to process the request.
5) The contracting officer transmits the Wage and Hour decision to the contractor.
6) The contractor informs the affected employees.
Information required by the Regulations must be submitted on SF-1444 or bond paper.
When preparing a conformance request the ""Service Contract Act Directory of Occupations"" (the Directory) should be used to compare job definitions to ensure that duties requested are not performed by a classification already listed in the wage determination. Remember it is not the job title but the required tasks that determine whether a class is included in an established wage determination.
Conformances may not be used to artificially split combine or subdivide classifications listed in the wage determination."
62227
O R E G O NO R E G O N
O R E G O NO R E G O N
0 250 500 750 1,000125 Miles
Roseburg BLM District District Area Boundary Resource Area Boundary National Forest Boundary Interstate Highway US Highway State Highway District Area Boundary Resource Area Boundary National Forest Boundary
Oregon Ownership Bureau of Land Management U.S. Forest Service National Park Service U.S. Fish and Wildlife Service Bureau of Indian Affairs Other Federal State Local Government Private/Unknown
Roseburg BLM District
OREGONOREGON
JOSEPHINE
CURRY
JACKSON
COOS
KLAMATH
DOUGLAS
LANE DESCHUTES
BENTON LINN
JEFFERSON
LINCOLN
POLK
MARION
YAMHILL
CLACKAMAS
WASCO
HOOD RIVER
MULTNOMAH
WASHINGTON
TILLAMOOK
CLARK
COLUMBIA
CLATSOP
WAHKIAKUM
COWLITZ
SKAMANIA
PACIFIC
LEWIS
Medford District
Northwest Oregon District
Roseburg District
Ashland Resource
Area
Grants Pass Resource Area
Butte Falls Resource Area
South River Resource Area
Swiftwater Resource Area
Siuslaw Resource
Area Upper Willamette
Resource Area
Marys Peak Resource Area
Cascades Resource
Area
Tillamook Resource Area
Tillamook
Gold Beach
Brookings
Seaside
Newport
Florence
Port Orford
Saint Helens
Grants Pass
Ashland Klamath Falls
Longview
Oregon City
McMinnville
Albany Corvallis
Coos Bay
Roseburg
Medford
Vancouver
Salem
Eugene
Portland
Cone Collection Purchase Order Potential Collection Districts Highways - 1:250,000 and Above
Interstate US Highway State Highway Unknown Jurisdiction Resource Area Boundaries District Area Boundaries County Boundary State Boundary
0 20 40 6010 Miles
No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these data for individual or aggregate use with other data. Original data were compiled from various sources and may be updated without notification.
No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these data for individual or aggregate use with other data. Original data were compiled from various sources and may be updated without notification.
Tree Seed Zones:
Ponderosa Pine District Area Boundaries Counties Major Highways
Medford
Springfield
Salem
LAKE
HARNEY
LANE
GRANT
KLAMATH
DOUGLAS
YAKIMA
MALHEUR
LINN
CROOK
LEWIS
WASCO
COOS
UMATILLA
JACKSON
UNION
CURRY
BAKER
DESCHUTES
MORROW
BENTON
KLICKITAT
WHEELER
JEFFERSON
PACIFIC
JOSEPHINE
SKAMANIA
CLACKAMAS
PIERCE
MARION
GILLIAM
ADAMS
POLK
LINCOLN
COWLITZ
FRANKLIN
CLATSOP
TILLAMOOK
CLARK
KITTITAS
WALLA WALLA
WALLOWA
WHITMAN
COLUMBIA
YAMHILL
GARFIELD
THURSTONGRAYS HARBOR
WASHINGTON
Hines
Lakeview
Roseburg
North Bend
Prineville
Vale District
Prineville District
Salem District
Lakeview District
Burns District
Eugene District
Medford District
Coos Bay District
Roseburg District
Ponderosa Pine
0 25 50 75 10012.5 Miles
Date: 11/3/2015
U.S. Department of the Interior Bureau of Land Management with other data. Original data were compiled from various sources and may be updated without notification.
Tree Seed Zones:
Jeffrey_Pine District Area Boundaries Counties Major Highways
Medford
Springfield
Salem
LAKE
HARNEY
LANE
GRANT
KLAMATH
DOUGLAS
YAKIMA
MALHEUR
LINN
CROOK
LEWIS
WASCO
COOS
UMATILLA
JACKSON
UNION
CURRY
BAKER
DESCHUTES
MORROW
BENTON
KLICKITAT
WHEELER
JEFFERSON
PACIFIC
JOSEPHINE
SKAMANIA
CLACKAMAS
PIERCE
MARION
GILLIAM
ADAMS
POLK
LINCOLN
COWLITZ
FRANKLIN
CLATSOP
TILLAMOOK
CLARK
KITTITAS
WALLA WALLA
WALLOWA
WHITMAN
COLUMBIA
YAMHILL
GARFIELD
THURSTONGRAYS HARBOR
WASHINGTON
Hines
Lakeview
Roseburg
North Bend
Prineville
Vale District
Prineville District
Salem District
Lakeview District
Burns District
Eugene District
Roseburg District
Medford District
Coos Bay District
Jeffrey Pine
0 25 50 75 10012.5 Miles
Date: 11/2/2015 with other data. Original data were compiled from various sources and may be updated without notification.
Tree Seed Zones:
Incense_Cedar District Area Boundaries Counties Major Highways
Medford
Springfield
Salem
LAKE
HARNEY
LANE
GRANT
KLAMATH
DOUGLAS
YAKIMA
MALHEUR
LINN
CROOK
LEWIS
WASCO
COOS
UMATILLA
JACKSON
UNION
CURRY
BAKER
DESCHUTES
MORROW
BENTON
KLICKITAT
WHEELER
JEFFERSON
PACIFIC
JOSEPHINE
SKAMANIA
CLACKAMAS
PIERCE
MARION
GILLIAM
ADAMS
POLK
LINCOLN
COWLITZ
FRANKLIN
CLATSOP
TILLAMOOK
CLARK
KITTITAS
WALLA WALLA
WALLOWA
WHITMAN
COLUMBIA
YAMHILL
GARFIELD
THURSTONGRAYS HARBOR
WASHINGTON
Hines
Lakeview
Roseburg
North Bend
Prineville
Vale District
Prineville District
Salem District
Lakeview District
Burns District
Eugene District
Medford District
Coos Bay District Roseburg
District
Incense Cedar
0 25 50 75 10012.5 Miles
Date: 11/2/2015
ATTACHMENT 3 - FIELD CONE COLLECTION TAG
TOP HALF OF TAG IS ATTACHED TO THE OUTSIDE OF THE CONE BAG.
Fill in the boxes with permanent black marker
Species Name
Seed ID includes o Seed zone o Elevation o Year o Lot Code (Unique Tree Number)
Location include o Township o Range o Section o Road Number
Cone Collected include the Date and Signature of cone collector
BOTTOM HALF OF TAG HAS THE SAME INFORMATION AS THE TOP OF THE TAG
AND IS PUT IN THE CONE BAGS WITH THE CONES.
HOW TO FILL IN THE FIELD CONE COLLECTION TAG
SPECIES: Insert the corresponding Species Name from the chart below.
SEED ID:
o Seed Zone (as identified in the call order) o Elevation o Year – last two digits of the calendar year o Lot Code - Unique Tree Number selected by the contractor that is unique to that tree and can be used to find information on the individual tree within that cone lot on the Field Seed Tree Location Report and Field Cone
Collection Record.
LOCATION
o Township o Range o Section o Blank Line – insert road Number
SPECIES
SPECIES
NAME
INCENSE CEDAR CADE27
WESTERN RED CEDAR THPL
PONDEROSA PINE PIPO
JEFFREY PINE PIJE
NOBLE FIR ABPR
SHASTA FIR ABMAS
LODGEPOLE PINE PICO
ATTACHMENT 4 - REFERENCE SHEET FOR FIELD CONE COLLECTION
SPECIES SPECIES NAME
Minimum Number of sound ripe seed / cone
INCENSE CEDAR CADE27 2
WESTERN RED CEDAR THPL 5
PONDEROSA PINE PIPO 3
JEFFREY PINE PIJE
NOBLE FIR ABPR
SHASTA FIR ABMAS
LODGEPOLE PINE PICO
SPECIES SEED ZONES ELEVATION BAND WIDTHS
INCENSE CEDAR
Zone 1 1 foot to 999 feet
1,000 to 2,000 feet continues in 1,000 foot band widths
Zone 2
Zone 3
Zone 4
WESTERN RED CEDAR
Zone 2 No elevation band widths
Zone 4 2,000 to 3,500 feet
> 3,500 feet
PONDEROSA PINE
Zone 12
1,000 to 2,000 feet continues in 1,000 foot band widths
Zone 13
Zone 14
Zone 15
JEFFREY PINE Zone 1 1,000 to 2,000 feet
Continues in 1,000 foot bands
NOBLE FIR Zone 3 <5,500 feet > 5,500 feet
SHASTA FIR
Zone 3
<5,500 feet > 5,500 feet
Zone 4 3,000 to 4,500 feet
>4,500 feet
LODGEPOLE PINE Zone 4 1,000 to 2,000 feet
Continues in 1,000 foot bands
ATTACHMENT 5 - DIAGRAM OF A MATURE CONIFER SEED
ATTACHMENT 6 - FIELD SEED TREE LOCATION REPORT
(one cone lot per page)
Company Name: ________________________________________
Contact: _______________________________________________
Phone number: __________________________________________
Species: _______________________ Total Number of Bushels Provided: _________
Seed Zone: _____________________ Cost Per Bushel: ________________________
Elevation Range : _________________ Date: ____________
Unique Tree #
Flag Color Township Range Section Road/Drainage or Description of the Area
Estimated Number of
Bushels
Attach sketch location map with unique tree number to the back of the Report.
ATTACHMENT 7 - FIELD CONE COLLECTION RECORD
(ONE SPECIES/SEED ZONE PER RECORD)
Contractor’s Signature: _____________________________________ Collection Date: __________________
Species: _________________________ Seed Zone: ______________ COR Signature: ________________________________________
Unique Tree
(same # on the Tree Location Record)
ELEVATION
LOCATION
(TRS)
Road/Drainage or
Description of the Area
SEED PER
CUT
FACE
NUMBER
OF
BUSHELS
NUMBER OF
BAGS
COLLECTED
ATTACHMENT 8 - Authorization for Cone Collection on Private Land
I _______________________________________________ give permission to _____________________
(Land Owner) (Contractor) to collect ________________________________ cones from my property.
(Species)
Date: _____________
Land Owners Signature: ________________________________________________________
Land Owner’s Name: ___________________________________________________________
(printed)
Mailing Address: ______________________________________________________________
Phone Number: _______________________________________________________________
Address of Property and/or Description of area for collection:
| Attachments.pdf |
| Attachment 2 - Field Cone Collection Maps.pdf |
| Seedzones_Ponderosa |
| Seedzones_Jeffrey Pine |
| Seedzones_Lodgepole Pine |
| Seedzones_Shore Pine |
| Seedzones_Incense Cedar |
| Seedzones_Alaska_Yellow_Cedar |
| Seedzones_Western_Red_Cedar |
| Seedzones_Grand Fir |
| Seedzones_Shasta_Fir |
| Seedzones_Pacific_Silver_Fir |
| Seedzones_Western_Hemlock |
| Seedzones_Sitka_Spruce |
| Seedzones_Engelmann_Spruce |
File details come from the government source that posted it. Updated .