Delivery_Schedule_PDO_Supply_Contract_0002.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
PECOS DISTRICT OFFICE - SUPPLY
Solicitation number
140L4024Q0001
Issued by

About this file

This spreadsheet outlines the estimated quantities of various supply line items needed for multiple Bureau of Land Management New Mexico Region projects in 2023. Key details include:

  • Projects located at Orla Road West, Junction, Tule, Crockett, Phantom Banks, and Xbar Elrod, with quantities provided for 15 common supply line items such as plastic piping, storage tanks, fencing materials and posts. The Tule project requires the largest quantities at 12,500 feet of 1.25" plastic pipe and 168 bags of concrete.

  • The related federal contract opportunity is solicitation number 140L4024Q0001 for Pecos District Office supplies issued by the Department of the Interior Bureau of Land Management New Mexico Region. No further information is provided on pricing, response dates, or other contractual terms.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Delivery Schedule

Delivery Schedule
2023 CFO Orla Road West Fence Supply
Line ItemDescriptionQuantityUnits
1DR-9 250 psi 1.25" PE pipe (2,000' rolls)0Foot
2DR-11 200 psi 2.00" PE pipe (2,000' rolls)0Foot
31.25" threaded male fusion transition, DR-11 200 psi0Each
41.25" 90 ELL, DR-9 fusion0Each
58' rubber tire trough, 22.5" max height ~500 gallons0Each
61.25" Flippen float valve assembly, complete with ball, swivel, and arm.0Each
75,000 gallon PE storage (green in color) 142" wide x 88" tall (11.83' wide by 7.33' tall)0Each
8Barbed Wire Fence72Rolls
9Barbless Wire Fence24Rolls
10Upright Post45Each
11Brace Post56Each
12Nut, and bolt54Each
13Twisted Wire Stays 36", 100 count bundles20Bundle
145.5' SPEC T-Posts silver top1920Each
15Sacked Ready Mix Concrete404Each
2023 CFO Junction Supply
Line ItemDescriptionQuantity estimatedUnits
1DR-9 250 psi 1.25" PE pipe (2,000' rolls)0Foot
2DR-11 200 psi 2.00" PE pipe (2,000' rolls)0Foot
31.25" threaded male fusion transition, DR-11 200 psi1Each
41.25" 90 ELL, DR-9 fusion1Each
58' rubber tire trough, 22.5" max height ~500 gallons1Each
61.25" Flippen float valve assembly, complete with ball, swivel, and arm.1Each
75,000 gallon PE storage (green in color) 142" wide x 88" tall (11.83' wide by 7.33' tall)0Each
8Barbed Wire Fence0Rolls
9Barbless Wire Fence0Rolls
10Upright Post0Each
11Brace Post0Each
12Nut, and bolt0Each
13Twisted Wire Stays 36", 100 count bundles0Bundle
145.5' SPEC T-Posts silver top0Each
15Sacked Ready Mix Concrete42Each
2023 CFO Tule Supply
Line ItemDescriptionQuantity estimatedUnits
1DR-9 250 psi 1.25" PE pipe (2,000' rolls)12500Foot
2DR-11 200 psi 2.00" PE pipe (2,000' rolls)0Foot
31.25" threaded male fusion transition, DR-11 200 psi4Each
41.25" 90 ELL, DR-9 fusion4Each
58' rubber tire trough, 22.5" max height ~500 gallons4Each
61.25" Flippen float valve assembly, complete with ball, swivel, and arm.4Each
75,000 gallon PE storage (green in color) 142" wide x 88" tall (11.83' wide by 7.33' tall)4Each
8Barbed Wire Fence0Rolls
9Barbless Wire Fence0Rolls
10Upright Post0Each
11Brace Post0Each
12Nut, and bolt0Each
13Twisted Wire Stays 36", 100 count bundles0Bundle
145.5' SPEC T-Posts silver top0Each
15Sacked Ready Mix Concrete168Each
2023 CFO Crockett Supply
Line ItemDescriptionQuantity estimatedUnits
1DR-9 250 psi 1.25" PE pipe (2,000' rolls)2000Foot
2DR-11 200 psi 2.00" PE pipe (2,000' rolls)0Foot
31.25" threaded male fusion transition, DR-11 200 psi0Each
41.25" 90 ELL, DR-9 fusion0Each
58' rubber tire trough, 22.5" max height ~500 gallons0Each
61.25" Flippen float valve assembly, complete with ball, swivel, and arm.0Each
75,000 gallon PE storage (green in color) 142" wide x 88" tall (11.83' wide by 7.33' tall)0Each
8Barbed Wire Fence0Rolls
9Barbless Wire Fence0Rolls
10Upright Post0Each
11Brace Post0Each
12Nut, and bolt0Each
13Twisted Wire Stays 36", 100 count bundles0Bundle
145.5' SPEC T-Posts silver top0Each
15Sacked Ready Mix Concrete0Each
2023 CFO Phantom Banks Supply
Line ItemDescriptionQuantity estimatedUnits
1DR-9 250 psi 1.25" PE pipe (2,000' rolls)2000Foot
2DR-11 200 psi 2.00" PE pipe (2,000' rolls)0Foot
31.25" threaded male fusion transition, DR-11 200 psi0Each
41.25" 90 ELL, DR-9 fusion0Each
58' rubber tire trough, 22.5" max height ~500 gallons0Each
61.25" Flippen float valve assembly, complete with ball, swivel, and arm.0Each
75,000 gallon PE storage (green in color) 142" wide x 88" tall (11.83' wide by 7.33' tall)0Each
8Barbed Wire Fence0Rolls
9Barbless Wire Fence0Rolls
10Upright Post0Each
11Brace Post0Each
12Nut, and bolt0Each
13Twisted Wire Stays 36", 100 count bundles0Bundle
145.5' SPEC T-Posts silver top0Each
15Sacked Ready Mix Concrete0Each
2023 RFO Xbar Elrod Supply
Line ItemDescriptionQuantity estimatedUnits
1DR-9 250 psi 1.25" PE pipe (2,000' rolls)0Foot
2DR-11 200 psi 2.00" PE pipe (2,000' rolls)7000Foot
31.25" threaded male fusion transition, DR-11 200 psi0Each
41.25" 90 ELL, DR-9 fusion0Each
58' rubber tire trough, 22.5" max height ~500 gallons1Each
61.25" Flippen float valve assembly, complete with ball, swivel, and arm.0Each
75,000 gallon PE storage (green in color) 142" wide x 88" tall (11.83' wide by 7.33' tall)1Each
8Barbed Wire Fence0Rolls
9Barbless Wire Fence0Rolls
10Upright Post0Each
11Brace Post0Each
12Nut, and bolt0Each
13Twisted Wire Stays 36", 100 count bundles0Bundle
145.5' SPEC T-Posts silver top0Each
15Sacked Ready Mix Concrete42Each
6RTDs

File details come from the government source that posted it. Updated .