140L4023R0002_PriceSchedule_Terms_Conditions_20230811.pdf

PDF 313 KB Posted

Attached to
NMSO FENCING UPGRADES Federal contract opportunity
Solicitation number
140L4023R0002
Issued by
Department of the Interior Bureau of Land Management New Mexico Region

About this file

This document outlines the requirements for a federal construction contract opportunity with the Department of the Interior Bureau of Land Management New Mexico Region. The contract involves upgrades to fencing at an unspecified New Mexico Site Management Office location, including installation of new fencing panels, floor plates, concrete anchors, and powder coating, as well as design, fabrication and installation work. Offerors are required to submit fixed prices for each line item in accordance with the included Statement of Work and attachments. The award will be made to the lowest priced technically acceptable offeror based on the criteria provided. The performance period is 180 days from notice to proceed. The document specifies applicable contract clauses, administrative requirements, and special provisions including prevailing wage rates, safety standards, and insurance obligations.

View the file

Other files for this federal contract opportunity

Other files attached to NMSO FENCING UPGRADES, newest first.
File Type Posted
Sol_140L4023R0002_Amd_0004.pdf PDF
140L4023R0002_QA_NMSOFencingUpgrade_20230906_0004.pdf PDF
Sol_140L4023R0002_Amd_0003.pdf PDF
140L4023R0002_PricingSchedule_TermsConditions_20230816_0002.pdf PDF
Sol_140L4023R0002_Amd_0002.pdf PDF
140L4023B0001_PricingSchedule_TermsConditions_20230815_0001.pdf PDF
Sol_140L4023R0002_Amd_0001.pdf PDF
NMSO_SOW_20230731.doc DOC document
Sol_140L4023R0002.pdf PDF
B03_DBA_Santa_Fe_20230731.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B – SERVICES/PRICE SCHEDULE

Propose your best prices for each of the work items in accordance with the Statement of Work (SOW) and attachments. Price Proposals must be submitted following the price schedule/format herein. Incomplete price proposals will not be considered for award.

Description Unit Price Quantity Total Price

4’x8’ Impasse Fencing Panels w/12” Curve at 3’

4”X 4” Steel Floor

PLATES

3/8” X 3” Concrete Anchor Bolts (10 pack)

Black Powder coating (per square feet)

Design, installation, and fabrication (per linear foot, 640 total feet)

Total Overall Price

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1. Disclosure of the magnitude of construction projects. In accordance with FAR 36.204, the estimated price range of this project is:

(b) Between $25,000 and $100,000.

SECTION D – PACKAGING AND MARKING

D.1 PAYMENT OF POSTAGE AND FEES All postage and fees related to submitting information forms, reports, etc., to the CO or the COR shall be paid by the contractor.

D.2 MARKING All information submitted to the Contracting Officer or the Contracting Officer's Representative shall clearly indicate the Contract Number of the contract for which the information is being submitted

SECTION E – INSPECTION AND ACCEPTANCE

CLAUSES

52.246-12 Inspection of Construction (AUG 1996) 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements (AUG 1996) 52.246-21 Warranty of Construction. (MAR 1994)

SECTION F – DELIVERIES OR PERFORMANCE

F.1. FAR 52.211-10 Commencement, Prosecution, and Completion of Work (April 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 calendar days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of Clause)

F.2. FAR 52.211-12 Liquidated Damages—Construction (September 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the

Contractor will pay liquidated damages to the Government in the amount of $75.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

F.3 FAR 52.242-14 Suspension of Work (APR 1984)

(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.

(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1)by an act of the Contracting Officer in the administration of this contract, or (2)by the Contracting Officer’s failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly. However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.

(c) A claim under this clause shall not be allowed-

(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and

(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.

SECTION G – CONTRACT ADMINISTATION DATA

G.1 CONTRACTING STAFF

All communications pertaining to contractual and/or administrative matters under this contract shall be sent to:

Contracting Officer Ronald Shumate rshumate@gmail.com

Contracting Officer's Representative Name:

TBD prior to award mailto:rshumate@gmail.com

G.2 CONTRACTING OFFICER'S REPRESENTATIVE DEFINITION

The “Contracting Officer’s Representative (COR)” is the on-the-ground representative for the Contracting Officer that monitors and enforces the terms and conditions of the contract.

G.3 RESPONSIBILITIES OF THE CONTRACTING OFFICER'S REPRESENTATIVE (COR)

G.3.1 The COR’s authorities and responsibilities are defined in the COR’s Designation Letter.

The COR is authorized to clarify technical requirements, and to review and approve work which is clearly within the scope of work. The COR is NOT authorized to issue changes or modify the scope of work in any way.

G.3.2 The COR is responsible for verifying the Contractor’s compliance with the technical specifications, drawings, work schedule, and labor provisions at the site of the work.

G.4 1452.201-70 AUTHORITIES AND DELEGATIONS (SEPT 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the

COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within their or her appointment, shall be at the Contractor's risk.

G.5 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM

In accordance with FAR 42.1502, the Contractor’s performance will be evaluated upon completion of each Task Order of $750,000 or more; and for each construction task order terminated for default regardless of contract value. Interim evaluations may be prepared at any time during contract performance when determined to be in the best interest of the Government.

(a) One or more past performance evaluations will be conducted on this contract in order to record contractor performance.

(b) The past performance evaluation process is a paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report.

Once the report is processed, it is available in the CPARS for Government use in evaluating past performance as part of a source selection action.

(c) The Contractor must furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to past performance evaluation(s) for this contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Government Assessing Official. The report information must at all times be protected as source selection sensitive information not releasable to the public.

(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions.

Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/. The CPARS User Manual, registration for On Line Training for Contractor Representatives, and a practice application may also be found at this site.

(e) Within 60 days after the end of a performance period, the Government Assessing Official (AO) for the contract will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/. Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in CPARS and your comments must focus on objective facts in the AO's rating, narrative and your performance of the contract. In addition to the ratings and supporting narratives, review the accuracy of all information in the evaluation, as it includes key http://www.cpars.gov/ http://www.cpars.gov/ fields that will be used by the Government to identify the Contractor in future source selection actions. If you elect not to provide comments, acknowledge receipt of the evaluation by indicating "No comment" in Block 22 along with signing and dating Block 23 of the form.

Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment." Your response is due within 30 calendar days after receipt of the CPARS.

(f) The following guidelines apply concerning your use of the past performance evaluation:

(1) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason the form cannot be viewed and/or submitted through CPARS, contact the AO for instructions.

(2) Strictly control access to the evaluation within your organization, and ensure the evaluation is never released to persons or entities outside of their control.

(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.

(g) If you wish to discuss a past performance evaluation, send a request in writing to the AO no later than seven days following the date the DOI/FS submits an evaluation to CPARS.

(h) If the parties cannot resolve any disagreement in the content of the past performance evaluation, the original evaluation as well as your comments will be referred to the Reviewing Official (RO). The RO will make a final determination on the performance evaluation.

(i) The completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting future source selection actions after it has been finalized.

(End of clause)

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1. TRIBAL TAXES, REQUIREMENTS AND/OR RESTRICTIONS

(a) Special attention is called to FAR Clause 52.236-7, Permits and Responsibilities and FAR Clause 52.229-3, Federal, State, and Local Taxes. Offerors are responsible for contacting the tax authorities and tribe or tribal organization involved with regard to any requirements regarding state taxes, tribal taxes, royalties and/or other applicable tribal laws or ordinances. Any costs associated with this section shall be included in the contractor’s proposal.

(b) Contractor is responsible for contacting the appropriate Tribal Employment Rights

Office (TERO) for coordination and approvals.

H.2. BACKGROUND INVESTIGATION

Background investigations are not required for this project.

H.3. PROJECT LABOR AGREEMENTS

This task order does not require a project labor agreement.

H.4 RIGHTS OF ENTRY

The Contractor shall obtain all necessary permission and permits to enter private property to make ground surveys, establish reference points, and 'set' monuments if applicable. The Contractor shall assume responsibility for damage to property as a result of its actions in performing work under this contract.

H.5 DAMAGES

a. The Contractor shall assume all risks of injury to persons or property in connection with the performance of work under this contract and shall indemnify and save harmless the Government against all claims, causes of action, cost and expense, because of bodily injuries or death or damages to property arising from work activities of the Contractor.

b. The Contractor shall not cut, remove, or knock down fences or leave any gate open without specific permission of the land owner or person in charge of the property.

c. The Contractor shall not use any materials which are poisonous or hazardous to animals.

d. The Contractor shall exercise extreme care so as to prevent the start or spread of fire and to prevent any damage to property. The Contractor shall leave the property as undisturbed as possible prior to departure.

H.6 ACCIDENT PREVENTION

a. The Contractor shall, at all times, exercise reasonable precautions and provide for protecting the lives and health of employees and other persons in the performance of work under this contract. Specifically, the Contractor shall comply with all applicable provisions of federal, state, local, safety, health, and sanitation laws, codes and regulations.

b. The Contractor shall maintain an accurate record of and shall report to the Contracting Officer in the manner and on forms prescribed by the Contracting Officer, all causes of death, occupational diseases, traumatic injuries, lost-time accidents, or damage to property arising out of or in the course of employment incidental to performance of the work under this contract.

H.7 CLEAN-UP

a. Except for monuments, witness posts and reference posts established by the Contractor, in accordance with the provisions of the contract, the Contractor shall remove all flags, markers, paneling, targets, stakes, rubbish, unused material, and any other materials belonging to the Contractor or used under the Contractor's direction during the performance of work under this Contract.

b. In the event the Contractor does not remove all materials and in terms discussed above, the Government may remove those items at the expense of the Contractor. Any monies due the Contractor may be offset by reasonable charges for this removal. If sureties are involved, they may also be liable for the costs for this removal effort.

H.8 SPECIAL INSTRUCTIONS

a. Accuracy - The Contractor's attention is directed to the fact that the precision, accuracy, and completeness of the work called for by this contract is essential. The detailed requirements of the contract will be rigidly interpreted and applied in determining the acceptability of the field work accomplished, monuments 'set' and referenced, and data delivered.

b. Performance of Work by the Government - Nothing in this contract shall be construed or interpreted to prohibit or restrict the Government's right to have Government employees perform work of the type covered by this contract.

H.9 WORK HOURS

The Contractor shall perform work during normal working hours. Normal working hours are usually from 0800 to 1700 each Monday through Friday (except on legal holidays).

Any deviation from normal working hours shall be at the sole discretion of the government and shall require prior written approval. Once onsite construction has begun, the contractor shall finish the project in 180 days or less.

The contractor will not be allowed to store any equipment or materials without prior approval from the COR or C.O.

Holidays

The Government observes the following holidays:

• New Year's Day, January 1

• Martin Luther King's Birthday, the third Monday in January

• President's Birthday, the third Monday in February

• Memorial Day, the last Monday in May

• Independence Day, July 4

• Juneteenth Day, June 19

• Labor Day, the first Monday in September

• Columbus Day, the second Monday in October

• Veteran's Day, November 11

• Thanksgiving Day, the fourth Thursday in November

• Christmas Day, December 25

The contractor shall observe the above Holidays.

H.10 WAGE RATES

The Davis Bacon Wage Rate Determinations are applicable throughout the life of the contract.

H.11 INDEMNIFICATION

The contractor is an 'independent contractor' and shall obtain all necessary insurance to protect themself from liability arising out of this contract. The contractor hereby agrees to indemnify and hold the Government harmless in connection with, any loss or liability from damage to or destruction of property or from injuries to or death of persons (including the agents and employees of both parties) if such damage, destruction, injury or death arises out of, or is caused by performance of work under this contract, unless such damage, destruction, injury or death is caused solely by the negligence of the Government, its agents or employees. The contractor agrees to include this clause, appropriately modified, in all subcontracts to be performed under this contract.

SECTION I – CONTRACT CLAUSES

I.1 IBR Clause

CLAUSES

52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulation (FAR) Clauses: https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Interior Acquisition Regulations (DIAR): https://www.acquisition.gov/diar (End of Clause)

I.2 Clauses Incorporated by Reference

52.202-1 Definitions (JUN 2020) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (JUN 2020) 52.203-7 Anti-Kickback Procedures (JUN 2020) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity

(MAY 2014)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) 52.203-13 Contractor Code of Business Ethics and Conduct (JUN 2020) 52.203-14 Display of Hotline Poster(s) (JUN 2020) 52.203-17 Contractor Employee Whistleblower Rights & Requirements to Inform Employees of Whistleblower Rights (JUN 2020) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) 52.204-2 Security Requirements (AUG 1996) Alternate II (APR 1984) http://www.acquisition.gov/browse/index/far http://www.acquisition.gov/diar

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-14 Service Contract Reporting Requirements (OCT 2016) 52.204-15 Service Contract Reporting Requirements for Indefinite Delivery Contracts

(OCT 2016)

52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2020) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (JUN 2020) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

(OCT 2018)

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.210-1 Market Research (JUN 2020) 52.215-2 Audit and Records -- Negotiation (JUN 2020) 52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) 52.219-8 Utilization of Small Business Concerns (OCT 2018) 52.219-28 Post Award Small Business Program Rerepresentation (NOV 2020) 52.219-32 Orders Issued Directly Under Small Business Reserves (MAR 2020) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation (MAY 2018) 52.222-6 Construction Wage Rate Requirement (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (AUG 2018) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (APR 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Pricing Method) (AUG 2018) 52.222-35 Equal Opportunity for Veterans (JUN 2020) 52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020) 52.222-37 Employment Reports on Veterans (JUN 2020)

52.222-40 Notification of Employee Rights Under National Labor Relations Act (DEC 2010) 52.222-50 Combating Trafficking in Persons (OCT 2020) 52.222-54 Employment Eligibility Verification (OCT 2015) 52.222-55 Minimum Wages under Executive Order 13658 (NOV 2020) 52.222-62 Paid Sick Leave under Executive Order 13706 (JAN 2017) 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts (SEP 2013) 52.223-3 Hazardous Material Identification and Material Safety Data Alt 1 (FEB 2021) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) 52.223-15 Energy Efficiency in Energy Consuming Products (MAY 2020) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (AUG 2018) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) 52.223-20 Aerosols (JUN 2016) 52.223-21 Foams. (JUN 2016) 52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021) 52.226-1 Utilization of Indian Organizations and Indian-Owned Economic Enterprises

(JUN 2000)

52.227-1 Authorization and Consent (JUN 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance – Work on a Government Installation (JAN 1997) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.229-2 North Carolina State and Local Sales and Use Tax (APR 1984) 52.229-3 Federal, State, and Local Taxes (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (OCT 2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.233-1 Disputes (MAY 2014) Alt 1 (DEC 1991) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991)

52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (APR 1984) Alternate 1 (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) Alternate I (APR 1984) Alternate II (APR 1984) 52.242-13 Bankruptcy (JUL 1995) 52.243-4 Changes (JUN 2007) 52.244-2 Subcontracts (JUN 2020) 52.244-6 Subcontracts for Commercial Items (NOV 2020) (DEVIATION APR 2020) 52.245-1 Government Property (JAN 2017) - Alt 1 (APR 2012) 52.245-9 Use and Charges (APR 2012) 52.246-21 Warranty of Construction (MAR 1994) Alternate I (MAR 1994) 52.248-3 Value Engineering – Construction (OCT 2020) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012) -- Alternate I (SEP 1996) 52.249-3 Termination for Convenience of the Government (Dismantling, Demolition, or Removal of Improvements) (APR 2012) 52.249-10 Default (Fixed-Price Construction) (APR 1984) Alternate I (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

I.3 CLAUSES INCORPORATED BY FULL TEXT

52.216-18 Ordering (AUG 2020)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from date of award through the end date of each option.

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) A delivery order or task order is considered “issued” when—

(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;

(2) If sent by fax, the Government transmits the order to the Contractor's fax number; or

(3) If sent electronically, the Government either—

(i) Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the Contractor; or

(ii) Distributes the delivery order or task order via email to the Contractor's email address.

(c) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract

52.216-19 Order Limitations (Oct 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,000.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor—

(1) Any order for a single item in excess of $50,000,000.00;

(2) Any order for a combination of items in excess of $50,000,000.00 or

(3) A series of orders from the same ordering office within (30) days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection

52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 7 days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

52.217-8 Option to Extend Services (NOV 1999) The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 calendar days.

52.217-9 Option to Extend the Term of the Contract (Mar 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 30 calendar days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years and 6 months.

52.219-14 Limitations on Subcontracting (MAR 2020)

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) Applicability. This clause applies only to—

(1) Contracts that have been set aside for small business concerns or 8(a) participants;

(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) participants;

(3) Orders set aside for small business concerns or 8(a) participants under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F); and

(4) Orders issued directly to small business concerns or 8(a) participants under multiple-award contracts as described in 19.504(c)(1)(ii).

(c) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of the contract in the case of a contract for—

(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.

(2) Supplies (other than procurement from a non-manufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials.

(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.

(4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.

(d) The Contractor shall comply with the limitations on subcontracting as follows:

(1) For contracts, in accordance with paragraph (b)(1) and (2) of this clause— [Contracting Officer check as appropriate.] ☐ By the end of the base term of the contract and then by the end of each subsequent option period; or ☒By the end of the performance period for each order issued under the contract.

(2) For orders, in accordance with paragraphs (b)(3) and (4) of this clause, by the end of the performance period for the order.

52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008)

(a) Definitions. As used in this clause— “Postconsumer material” means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item.

Postconsumer material is a part of the broader category of “recovered material.”

“Recovered material” means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.

(b) The Contractor, on completion of this contract, shall—

(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post7consumer material content; and

(2) Submit this estimate to the designated person described in each task order.

FAR 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL

CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008)

Consistent with this clause, on completion of this contract please submit the estimated percentage of total recovered material content for EPA-designed items to the appointed Contracting Officer’s Representative (COR).

52.228-1 Bid Guarantee (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds –

(1) To unsuccessful bidders as soon as practicable after the opening of bids, and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20% of the bid price or $1,000,000.00, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.228-13 Alternate Payment Protections (JULY 2000)

(a) The Contractor shall submit one of the following payment protections:

Payment Bond and/or Irrevocable letter of credit

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within _10 days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013)

(DEVIATION APR 2020)

(a)[(1) In accordance with 31 U.S.C. 3903 and 10 U.S.C. 2307, upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract [in accordance with the accelerated payment date established], to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, [with a goal of 15 days] after receipt of a proper invoice and all other required documentation from the small business subcontractor [if a specific payment date is not established by contract.

(2) The Contractor agrees to make such payments to its small business subcontractors without any further consideration from or fees charged to the subcontractor].

(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act. (c) Include the substance of this clause, including this paragraph

(c) , in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.

(End of Clause)

52.237-4 Payment by Government to Contractor (APR 1984)

(a) In full or partial consideration of the performance of the work called for in the Schedule, the Government will pay to the Contractor an agreeable amount as described in each task order that includes work applicable to this clause.

(b) The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates approved by the Contracting Officer. Except as provided in paragraph (c) of this clause, in making progress payments the Contracting Officer shall retain 10 percent of the estimated payment until final completion and acceptance of the contract work. However, if the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the Contracting Officer may authorize such payment in full, without retaining a percentage. Also, on completion and acceptance of each unit or division for which the price is stated separately, the Contracting Officer may authorize full payment for that unit or division without retaining a percentage.

(c) When the work is substantially completed, the Contracting Officer shall retain an amount considered adequate for the protection of the Government and, at the Contracting Officer’s discretion, may release all or a portion of any excess amount.

(d) In further consideration of performance, the Contractor shall receive title to all property to be dismantled or demolished that is not specifically designated as being retained by the Government. The title shall vest in the Contractor immediately upon the Government’s issuing the notice of award, or if a performance bond is to be furnished after award, upon the Government’s issuance of a notice to proceed with the work. The Government shall not be responsible for the condition of, or any loss or damage to, the property. If the Contractor does not wish to remove from the site any of the property acquired, the Contracting Officer may, upon written request, grant the Contractor permission to leave the property on the premises. As a condition to the granting of this permission, the Contractor agrees to waive any right, title, claim, or interest in and to the property.

(e) Upon completion and acceptance of all work and receipt of a properly executed voucher, the Government shall make final payment of the amount due the Contractor under this contract. If requested, the Contractor shall release all claims against the Government arising under this contract, other than any claims the Contractor specifically excepts, in stated amounts, from operation of this release.

Alternate I (Apr1984) If the contracting officer determines that the Government shall retain all material resulting from the dismantling or demolition work, delete paragraph (d) from the basic clause and renumber the remaining paragraphs.

(End of Alternate)

52.252-6 Authorized Deviations in Clauses (NOV 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.

(b) The use in this solicitation or contract of any Agriculture Acquisition Regulation (48 CFR 4 ) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.

Clauses Applicable Only to DOI Task Orders Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: Vendor Generated Invoice, Release of Claims, and any additional documents are to be determined at the task order level. The Contractor must use the IPP website to register access and use IPP for submitting requests for payment.

The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973- 3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

DIAR 1452.228-70 LIABILITY INSURANCE – DEPARTMENT OF THE INTERIOR

(JULY 1996)

(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:

https://www.ipp.gov/ mailto:ippgroup@bos.frb.org

$_100,000.00 each person, Workers Compensation and Employers’ Liability Insurance

$_500,000.00 each occurrence, General Liability Insurance, Bodily Injury Liability Insurance

$_500,000.00 property damage

(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.

1452.236-70 Prohibition Against Use of Lead-based Paint.

Paint containing more than .06 percent by weight of lead in paint, or the equivalent measure of lead in the dried film of paint already applied, shall not be used in the construction or rehabilitation of residential structures under this contract or any resulting subcontracts.

SECTION J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

Attachment Number Document Name Number of Pages

1 Statement of Work 2 Davis Bacon Act Wage

Determination

SECTION K – REPRESENTATIONS, CERTIFICATIONS, AND OTHER

STATEMENTS OF OFFERORS OR RESPONDENTS

Vendors MUST be registered and Active in the System for Award Management (SAM) system (www.SAM.gov) at the time of quotation submission, pursuant to FAR 52.204-7.

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR

RESPONDENTS

General: To assure timely and equitable evaluation of the proposal, the offeror shall follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Failure to meet all requirements may result in an offer being ineligible for award.

Basis For Award:

This requirement will be awarded based on the offeror that provides “Best Value to the Government” on a Lowest Priced Technically Acceptable (LPTA) basis. See below for defining of Technically Acceptability:

DETERMINATION OF TECHNICALLY ACCEPTABLE

Go (Pass, Yes, Acceptable) – All of the minimum acceptable criteria are clearly set forth in the offeror’s proposal or quote. The offeror’s proposal or quote meets the performance and technical capability requirements as set forth in the performance work statement or statement of work.

No-Go (Fail, No, Unacceptable) – Not all of the minimum acceptable criteria are met by the proposal or quote. The offeror’s proposal or quote contains one or more deficiencies. The proposal or quote fails to meet specified minimum performance and technical capability requirements set forth in the performance work statement or statement of work.

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SECTION D – PACKAGING AND MARKING
SECTION E – INSPECTION AND ACCEPTANCE
SECTION F – DELIVERIES OR PERFORMANCE
SECTION G – CONTRACT ADMINISTATION DATA
G.2 CONTRACTING OFFICER'S REPRESENTATIVE DEFINITION
G.4 1452.201-70 AUTHORITIES AND DELEGATIONS (SEPT 2011)
G.5 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.2. BACKGROUND INVESTIGATION
H.3. PROJECT LABOR AGREEMENTS
H.4 RIGHTS OF ENTRY
H.5 DAMAGES
H.6 ACCIDENT PREVENTION
H.7 CLEAN-UP
H.8 SPECIAL INSTRUCTIONS
H.9 WORK HOURS
H.10 WAGE RATES
H.11 INDEMNIFICATION
SECTION I – CONTRACT CLAUSES
FAR 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008)
DIAR 1452.228-70 LIABILITY INSURANCE – DEPARTMENT OF THE INTERIOR (JULY 1996)
SECTION J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
DETERMINATION OF TECHNICALLY ACCEPTABLE