Questions_-_Answers_0001.doc

DOC document 42 KB Posted

Attached to
MOBILE OFFICE SPACE PURCHASE Federal contract opportunity
Solicitation number
140L3922Q0005
Issued by
Department of the Interior Bureau of Land Management Nevada Region

View the file

Other files for this federal contract opportunity

Other files attached to MOBILE OFFICE SPACE PURCHASE, newest first.
File Type Posted
Sol_140L3922Q0005_Amd_0001.pdf PDF
A04_SOW.docx DOCX document
Sol_140L3922Q0005.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number 140L3922Q0005 Office Trailers Purchase Questions & Answers

Q1) Are framing, insulation, and finished walls a requirement?

A1) Yes Q2) Does the structure need to be stamped by a NV licensed architect & engineer?

A2) No

Q3) Does it need to be inspected?

A3) No

Q4) What is the preference for exterior color?

A4) Gray Q5) Height of structure? Height of interior ceiling?

A5) At least 7ft interior. No required exterior height is needed to be met.

Q6) Does structure require windows? If so, how many and location?

A6) 6 windows. A window for each room, and two windows per common room.

Q7) Where are 4 outside doors to be located?

A7) Two on each side.

Q8) How many interior doors and placement?

A8) Four interior doors, placement to each of the four rooms Q9) If wiring is required to transformer, what is power source rated at?

A9) BLM will handle the electrical hook-up.

Q10) In the SOW it states we will need to connect the panels on the container building(s) to the transformer. Is the expectation we tie the buildings panels directly to the transformer? Do you have any information you can provide on the transformer(s) (size, location, etc.). Is transformer underground or aerial?

A10) BLM will handle the electrical hook-up.

Q11) Exterior finish– container metal?

A11) Needs to have a rust inhibitor to extend the life of the structure.

Q12) What is required interior finish? Walls? Floor? Ceiling?

A12) Walls need to be fully insulated and finished with sheet rock and painted flat white. Flooring needs to be finished, not wood or metal, commercial grade vinyl plank with complete molding and baseboard where appropriate. Ceiling needs to be finished with sheet rock and painted white with recessed LED lighting.

Q13) What preferred room would the power and communications panel be placed?

A13) Exterior panel/electrical box preferred.

Q14) Will exterior lights be required?

A14) Exterior security lighting preferred.

Q15) If the underground electric service will have to be ran by us, what is this distance to the transformer?

A15) N/A Q16) Since these will be converted shipping containers, can we assume that no structural engineering/design will need to be provided. Just a floor plan/layout for BLM approval.

A16) Yes. Vendor can also submit pictures of something completed in the past.

Q17) As far as installation, these will be placed directly on the ground (ground mount) Correct? There will be approximately 6” from the ground to the door thresholds, BLM is ok with this? We do not need to provide any ramps or steps for egress.

A17) Vendor does not need to provide any ramps or steps for egress.

Q18) Do you have the floor plan of the required trailer?

A18) No, must contain 4 office spaces 11’ 6” X 8’ (92 sq. ft.) and a conference room at least 17’ X 16’ (272 sq. ft.).