About this file

This document is a Standard Form 30 (SF-30) Amendment of Solicitation/Modification of Contract for the NIFC 205 PAR Breakroom Cabinets project. Amendment 0001, effective 06/09/2025, was issued by the Bureau of Land Management's National Interagency Fire Center in Boise, Idaho. The amendment serves two primary purposes: 1) to provide responses to contractor questions and 2) to provide pictures of the cabinet area. Key details include guidance about structural columns that must be accommodated in cabinet installation, confirmation that Wilsonart laminate is an acceptable alternative to the specified Formica Earthen Twill, and a note that no further questions will be considered due to project timing constraints. The solicitation number is 140L3725Q0082, and the contracting officer is Matthew Steele.

View the file

Other files for this federal contract opportunity

Other files attached to NIFC 205 PAR BREAK ROOM CABINETS REPLACE, newest first.
File Type Posted
NIFC_205-PAR_breakrm_1_0001.JPG JPG image
NIFC_205-PAR_breakrm_2_0001.JPG JPG image
photo_with_notes_SLS_0001.pdf PDF
NIFC_205-PAR_breakrm_3_0001.JPG JPG image
NIFC_205-PAR_breakrm_4_0001.JPG JPG image
Sol_140L3725Q0082.pdf PDF
A06_NIFC_205-PAR_Break_room_-_Drawing.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140L3725Q0082 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

LFA

BOISE ID 83705

3833 S. DEVELOPMENT AVE.

BLM FA-NTL INTRAGCY FIRE CTR(FA250)

06/09/20250001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/02/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PROJECT: NIFC 205 PAR Breakroom Cabinets

The purpose of this amendment is to:

1. Provide responses to questions asked.

2. Provide pictures of the cabinets area.

This amendment must be acknowledged in accordance with the terms and conditions of the RFQ.

Due to the timing this project needs to be completed no further questions will be

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Matthew Steele

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140L3725Q0082/0001 considered.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Responses to questions:

1. Do you have photos of the structural columns? On Sheet Keynotes, it states: “Cut cabinetry and countertop to fit around structural columns”? See attached pictures. As shown on the plan, there are two columns that will interfere with the cabinets and counter. The columns extend from floor through ceiling and must remain in place. The pictures show the existing cabinets and equipment, upon award, the space will not have the existing cabinets, counters, or equipment. The horizonal electrical conduit shown will remain in place to serve the electrical outlets. The existing sink will also be removed, government will provide a new sink for mounting in new counter.

2. Does the laminate color have to be: “Formica Earthen Twill”? I can do custom Wilsonart colors much easier and quicker. Wilsonart is acceptable equal, closest color/pattern match.

Material quality shall match.