B09_Amendment_0002_Questions_and_Answers_Doc_0002.pdf

PDF 96 KB Posted

Attached to
BASIN VIEW PIPELINE PHASE II Federal contract opportunity
Solicitation number
140L3626Q0009
Issued by
Department of the Interior Bureau of Land Management

About this file

This is an Amendment 0002 Questions and Answers document dated 3/25/2026 for a federal contract opportunity involving pipeline and hydrant construction work managed by the Bureau of Land Management (BLM).

The document addresses technical specifications and project responsibilities across two sets of Q&A. Initial questions clarify that a 150 PSI pressure reducing valve is acceptable (rather than the originally specified 200 PSI), hydrants shall comply with specification 02665 - Part 2.1 – R with signs supplied by BLM, and the BLM has already obtained the Dawson County Road Crossing Permit so the contractor need not acquire it. Topsoil removal is not required if trenching methods are used. Site visit Q&A from 03/17/2026 provides additional project details: the construction easement is 50 feet either side of pipeline centerline, a 1-year warranty is required for work performed, underground utilities are unknown per specification 01009 – Part 3.2 – A – 2 with the contractor responsible for contacting utility owners via the Montana One Call System before excavation and immediately notifying utility owners of any damage, livestock will be present in the area during construction, and any fittings meeting the specification will be accepted for the project.

View the file

Other files for this federal contract opportunity

Other files attached to BASIN VIEW PIPELINE PHASE II, newest first.
File Type Posted
Sol_140L3626Q0009_Amd_0002.pdf PDF
Sol_140L3626Q0009_Amd_0001.pdf PDF
B03_WD_MT20260076_Dated_1_2_26.pdf PDF
B08_Past_Performance_Questionnaire.docx DOCX document
A04_Specifications_-_Basin_View_Pipeline_Phase_II.pdf PDF
Sol_140L3626Q0009.pdf PDF
Schedule_of_Items_-_Basin_View_Pipeline_Phase_II.pdf PDF
A06_Maps_Drawings_Basin_View_Pipeline_Phase_II.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0002 Questions and Answers 3/25/2026

Q1: Can the pressure reducing valve be rated up to 150 PSI instead of 200 PSI?

A1: 150 PSI Pressure reducing valve is acceptable

Q2: Will the BLM supply the signs for the hydrants?

A2: Yes, BLM will supply signs for the hydrants.

Q3: What are the specs on those (hydrants)?

A3: Hydrants shall be provided per specification 02665 - Part 2.1 – R (see A04 Specifications document)

Q4: Will the BLM acquire the crossing permit or is this something the contractor will need to acquire ?

A4: BLM has already obtained the Dawson County Road Crossing Permit.

Q5: Will you (BLM) require the removal of the topsoil if trenching method is chosen?

A5: No.