GAOA MAIER DAM RECONSTRUCTION Federal contract opportunity
Solicitation number
140L3624R0002
Issued by
Department of the Interior Bureau of Land Management

About this file

This document provides details for a federal construction contract solicitation to reconstruct the GAOA Maier Dam. The solicitation was issued by the Bureau of Land Management and seeks a contractor to perform work including excavation of spillways, embankment compaction, and concrete placement. The period of performance is extended to 530 days starting in February 2024. The pre-bid site visit and questions from interested offerors are included, with responses from the agency. Construction is prohibited from March to July to protect wildlife. The contractor will be responsible for surveying, testing, and disposal of waste according to the specifications.

View the file

Other files for this federal contract opportunity

Other files attached to GAOA MAIER DAM RECONSTRUCTION, newest first.
File Type Posted
Amendment_02_0002.pdf PDF
Sol_140L3624R0002_Amd_0002.pdf PDF
Sol_140L3624R0002_Amd_0001.pdf PDF
Attachment_3_-_Wage_Determination.pdf PDF
Attachment_9_-_SF25A_Payment_Bond.pdf PDF
Attachment_7_-_SF_24_Bid_Bond.pdf PDF
Sol_140L3624R0002.pdf PDF
Attachment_1_-_Maier_Dam_Specs.pdf PDF
Attachment_4_-_Reference_List.pdf PDF
140L3624R0002.pdf PDF
Attachment_2_-_Maier_Dam_Drawings.pdf PDF
Attachment_8_-_SF25_Performance_Bond.pdf PDF
Attachment_6_-_Financial_Responsibility_Required_Documentation.pdf PDF
Attachment_5_-_Past_Performance_Questionnaire.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140L3624R0002 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

LMA

BILLINGS MT 59101

5001 SOUTHGATE DR.

BLM MT STATE OFC(MT935)

LMA

BILLINGS MT 59101

5001 SOUTHGATE DR.

BLM MT-STATE OFC(MT935)

12/12/20230001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

11/09/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See Page 2 of 5 for changes incorporated by this amendment.

Period of Performance: 02/08/2024 to 09/08/2025

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Jorge Alvarez

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

12/12/2023

PROJECT DESCRIPTION: GAOA Maier Dam Solicitation No. 140L3624R0002

Description of Changes - This amendment incorporates the following information:

1. For informational purposes only, the Government is providing the Site Visit Attendance Records from the organized site visit that the Government held on November 28, 2023, at 2:00 pm Mountain Time.

2. The Government is providing the Questions received from interested offerors and the associated Answers provided by the Government.

3. The period of performance is extended and adjusted to 8 February 2024 – 8 September 2025. The amount of calendar days is extended to 578.

Acknowledgement - See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of offers (See Block 8 of the Standard Form 1442).

Third Party – If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.

SITE INSPECTION TOUR / PREBID CONFERENCE RECORD

The Government strongly urges offerors to inspect the site to gain a better understanding of the work requirements and to satisfy themselves regarding all general and local conditions that may affect the cost of performance. In no event shall failure to inspect the site constitute grounds for a claim after award.

Solicitation Number: 140L3624R0002 Project Title: GAOA Maier Dam Date and Time: 11/28/2023 at 2:00 PM Meeting Place(s): Marshall Dam Conducted by: Josh Helm, Civil Engineer

Attended by:

Name Company

Virgil Adesholt H-2 Mark Bachman Bachman Construction Marvin Robb Prospect Construction Jared Dirkson Youderian Construction

Questions and Answers Offerors shall submit questions by 11 December 2023, at 1:00 pm, Mountain Time. Questions submitted after this date and time may not be answered. Offerors for this RFQ, including subcontractors and teammates, shall consolidate questions related to this solicitation in a Request for Information (RFI) formatted Word document. Any RFI is to be emailed as an editable attachment to Jorge Alvarez (jalvarez@blm.gov) with the subject line: RFI – 140L3624R0002 GAOA Maier Dam. Only written RFI’s will be considered and responded to. BLM responses to the RFI will be posted as an amendment to the solicitation on https://sam.gov.

Solicitation Number: 140L3624R0002 Project Title: GAOA Maier Dam

• Will the Contractor be able to prepare and make slight improvements, modifications, etc. the access road to the dam?

o See Specifications 01010, Section 1.06 o The Government will consider and approve reasonable efforts that will be needed to haul large equipment and materials into the site, including minor cut/fill, minor reroutes, culverts, etc.

• Could cattle guards be temporarily installed in place of existing gates?

o Temporary cattle guards are an acceptable means of preparing the access road.

• Will the Contractor be required to reclaim the access road?

o See Specifications 01010, Section 1.06. Improvements to remain after project completion as approved by the Government.

• What locations are designated for borrow material?

o Soil from the stock water pit and auxiliary spillway excavations will be suitable to use for compacted embankment.

• Has the borrow material locations been quantified?

o As noted on Sheet SW1, the contractor may adjust the right side of the auxiliary spillway excavation to acquire more borrow if needed.

• Will Proctors be required for new borrow material?

o The Contractor shall provide a Moisture-Density (Proctor) Test for each soil type per Specifications 02300, Section 3.06. The soil type may vary even in similar location(s), the Moisture-Density Test shall be representative of the material being used.

• What is the flow rate for June-November into the reservoir?

o The reservoir is located in an ephemeral watershed where there is no regular flow, but runoff occurs due to snowmelt or rain.

• What is the static level of reservoir?

o The reservoir's normal high water elevation is up to 2,904.5 ft. The reservoir water surface was surveyed at 2,902.6 ft in October 2018.

• Is there a designated discharge point?

o The Contractor shall plan a dewatering discharge point as part of the site use requirements in Specification 01010, Section 1.02 & 1.04. The Government shall approve of the site use plan. Dewatering must meet local, federal, etc. laws for dewatering activities.

• Is there a designated stockpile and mixing location for lime treated soil?

o See Specifications 01010, Section 1.02 for requirements.

o The Contractor shall be responsible for site use planning of equipment and materials. The

Contractor’s site use layout shall be approved by the Government.

• How will excess debris be handled (steel and metal, concrete and grout, etc.)?

https://sam.gov/ o See Specifications 02050, Section 3.02 for concrete and CMP disposal requirements.

o See Specifications 02110, Section 3.01 – “Dispose of trees onsite as directed by the

Government at no additional cost to the Government.”

• Who will set new control monuments?

o The Government will provide any new control monuments after completion of construction and outside of this contract.

• Who does the initial survey work?

o As stated in Specification Section 01050, the Contractor is responsible for all construction surveying, including verifying confirming the existing control, and construction staking.

• Will the Contractor have access to the CAD/survey files?

o The Government will provide electronic CAD/survey data.

• Could the Contractor review the original Geotechnical investigation/report? The dam appears to be leaking.

o Original Geotechnical Investigation/Report is not on file for the BLM.

• The period of performance appears to be too short to complete all submittals and material orders.

o Period of performance shall be adjusted to be 530 days. From 8 February 2024 to 8 September 2025.

• Could construction start prior to 7/15?

o Construction activity and surface disturbance would be prohibited from March 15 to July

15 to protect sage grouse strutting activities and migratory birds.

• Will 3rd Party Testing be required with the Quality Control process and plan?