Attachment_2_-_Lakesite_Photovoltaic_Systems_Technical_Drawings.pdf

PDF 10 MB Posted

Attached to
LAKE SITE PHOTOVOLTAIC ARRAYS Federal contract opportunity
Solicitation number
140L3624Q0013
Issued by
Department of the Interior Bureau of Land Management

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDAHO

CANADA

UNITED STATES

SASKATC

H

EW

AN

ALBERTA

B R

ITIS

H

C O

LU

M

B

IA

N O

R T

H

D

A K

O T

A

S O

U T

H

D

A K

O T

A

WYOMING

ALT

MISSOULA

KALISPELL

GREAT FALLS

HAVRE

HELENA

BUTTE

BILLINGS

MILES CITY

LEWISTOWN

MONTANACHOTEAU

MALTA

GLASGOW

CHESTER

FT BENTON

STATE REFERENCE MAP

(N.T.S)

UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

LAKESITE PHOTOVOLTAIC SYSTEMS

LEWIS AND CLARK COUNTY

BUTTE FIELD OFFICE

VICINITY MAP

(N.T.S)

ESTIMATED QUANTITIES

ITEM QUANTITY UNIT

GRID-TIED SOLAR SYSTEM 4 EA

GENERAL ENGINEER'S NOTES

1. THE CONTRACTOR IS RESPONSIBLE FOR ALL METHODS, SEQUENCING, AND SAFETY

CONCERNS ASSOCIATED WITH THIS PROJECT DURING CONSTRUCTION, UNLESS

SPECIFICALLY ADDRESSED OTHERWISE IN THIS PLAN OR ELSEQHERE IN THE

CONTRACT DOCUMENTS.

2. THE CONTRACTOR IS TO COMPLY WITH ALL LOCAL, STATE, AND FEDERAL LAWS AND

REGULATIONS APPLICABLE TO THE CONSTRUCTION COVERED BY THIS PLAN.

3. TE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND COMPLYING WITH ALL

PERMITS REQUIRED TO COMPLETE ALL WORK COVERED BY THIS PLAN.

4. THE QUANTITIES AND SITE CONDITIONS DEPICTED IN THIS PLAN ARE FOR

INFORMATIONAL PURPOSES ONLY AND ARE SUBJECT TO ERROR AND OMISSION.

CONTRACTOR SHALL SATISFY THEMSELVES AS TO ACTUAL QUANTITIES AND SITE

CONDITIONS PRIOR TO BIDDING THE WORK FOR THE CONSTRUCTION COVERED BY

THIS PLAN.

5 A REASONABLE EFFORT HAS BEEN MADE TO SHOW THE LOCATIONS OF EXISTING

PUBLIC OR PRIVATE UNDERGROUND FACILITIES AND UTILITIES IN THE

CONSTRUCTION AREA. THE CONTRACT IS RESPONSIBLE FOR ANY DAMAGE TO

UTILITIES AND/OR FACILITES CAUSED DURING THEIR CONSTRUCTION OPERATIONS.

THE CONTRACTOR SHALL CALL 48 HOURS IN ADVANCE FOR BLUE STAKE

(1-800-STAE-IT) PRIOR TO ANY EXCAVATION.

6. THE CONTRACTOR IS TO VERIFY THE LOCATION AND THE ELEVATIONS OF ALL

EXISTING UTILITIES AT POINTS OF TIE-IN PRIOR TO COMMENCING ANY NEW

CONSTRUCTION. SHOULD ANY LOCATION OR ELEVATION DIFFER FROM THAT SHOWN

ON THESE PLANS, THE CONTRACTOR SHALL CONTACT THE ENGINEER WITH

DISCREPANCY.

7. THE CONTRACTOR IS TO VERIFY AND COORDINATE ALL DIMENSIONS AND SITE

LAYOUT WITH THE FINAL SITE PLAN PRIOR TO CONSTRUCTION AND CONTACT

ENGINEER WITH ANY DISCREPANCIES.

8. COORDINATION BETWEEN ALL PARTIES INVOLVED IS ESSENTIAL TO THE CONTRACT.

9. THE CONTRACTOR IS RESPONSIBLE FOR PROJECT AND SITE CONDITIONS, AND TO

WORK WITH WEATHER CONDITIONS, AS THE SITE MAY BE LOCATED IN AN AREA WITH

EXTREME WEATHER CONDITIONS OR WITHIN A FLOOD PRONE AREA.

\\ILMMTBF3DS1\BF\USERS\BJONES\MY DOCUMENTS\DWG\DWT\IMPROVEMENT SHEETS\#### - COVR.DWG

C O

V E

R

PROJECT LOCATION

DIRECTIONS TO DEVIL'S ELBOW CAMPGROUND:

FROM HELENA, DRIVE EAST ON YORK ROAD FOR 22 MILES. THE

CAMPGROUND AND DAY USE AREA WILL BE LOCATED ON THE

RIGHT-HAND SIDE OF THE ROAD.

DIRECTIONS TO WHITE SANDY CAMPRGROUND:

FROM HELENA, DRIVE NORTH ON I-15 N FOR 7 MILES. TAKE EXIT 200

FOR CO RD 453/LINCOLN RD AND FOLLOW EAST FOR 5 MILES. TURN

NORTH ON HAUSER DAM RD AND FOLLOW FOR 3.2 MILES WHERE

WHITE SANDY CAMPGROUND IS LOCATED ON THE RIGHT-HAND SIDE

OF THE ROAD.

DIRECTIONS TO HOLTER LAKE CAMPGROUND:

FROM HELENA, DRIVE NORTH ON I-15 N FOR 33.5 MILES. TAKE EXIT 226

TOWARDS MT- 434/WOLF CREEK. FOLLOW RECREATION RD/CRAIG

FRONTAGE RD FOR 2.2 MILES. TURN RIGHT ONTO BEARTOOTH RD

AND FOLLOW FOR 2.4 MILES. HOLTER LAKE CAMPGROUND IS

LOCATED ON THE RIGHT-HAND SIDE OF THE ROAD.

DIRECTIONS TO LOG GULCH:

FROM HELENA, DRIVE NORTH ON I-15 N FOR 33.5 MILES. TAKE EXIT 226

TOWARDS MT- 434/WOLF CREEK. FOLLOW RECREATION RD/CRAIG

FRONTAGE RD FOR 2.2 MILES. TURN RIGHT ONTO BEARTOOTH RD

AND FOLLOW FOR 6.8 MILES. HOLTER LAKE CAMPGROUND IS

LOCATED ON THE RIGHT-HAND SIDE OF THE ROAD.

[1]

EARTHWORK QUANTITIES ARE "IN PLACE"

ESTIMATES. NO SHRINK OR SWELL IS ASSUMED.

NO GROUND LOSS IS INCLUDED

[2]

THE QUANTITIES ARE AN ESTIMATE OF THE

ENGINEER. THE CONTRACTOR SHALL MAKE THEIR

OWN INDEPENEDENT ESTIMATE OF QUANTITIES

AND BID THEREON.

B L M

A

K E

S I T

E

P

H O

T O

V O

L T

A I C

S

Y S

T E

M S

B U

R E

U

O

F

L

A N

D

M

A N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

H E

N

T E

R I O

R

(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: CM APPROVED BY: LB)

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

D

R

D

E S

I G

N B

U I L

D

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

B U

T T

E

F

I E

F

I C

E

E N

E R

G

P R

O V

E M

E N

T

P

L A

NDRAWING INDEX

Sheet Number Sheet Title

01 G1 COVER

02 G2 LEGEND & ABBREVIATIONS

03 C1 DEVIL'S ELBOW PROPOSED SITE PLAN

04 C2 DEVIL'S ELBOW BUILDING PROFILES

05 C3 DEVIL'S ELBOW ROOF & PHOTOS

06 C4 HOLTER LAKE PROPOSED SITE PLAN

07 C5 HOLTER LAKE BUILDING PROFILES

08 C6 HOLTER LAKE ROOF & PHOTOS

09 C7 WHITE SANDY PROPOSED SITE PLAN

10 C8 WHITE SANDY BUILDING PROFILES

11 C9 WHITE SANDY ROOF & PHOTOS

12 C10 LOG GULCH PROPOSED SITE PLAN

13 C11 LOG GULCH BUILDING PROFILES

14 C12 LOG GULCH ROOF & PHOTOS

15 D1 LINE DIAGRAM

PROJECT DESCRIPTION:

THE BUREAU OF LAND MANAGEMENT'S BUTTE FIELD OFFICE PLANS TO INSTALL 4

PHOTOVOLTAIC SYSTEMS TO OFFSET UTILITY NEEDS AT THE ADMINISTRATIVE SITES

ALONG THE MISSOURI RIVER RESERVOIRS NEAR HELENA, MONTANA.THE ENERGY

PRODUCED BY THE PV SYSTEM SHALL BE INTERCONNECTED WITH THE UTILITY GRID

THROUGH THE EXISTING ON-SITE ELECTRICAL EQUIPMENT VIA A SUPPLY SIDE

CONNECTION IN THE MAIN SERVICE PANEL WHERE APPLICABLE. THE PV SYSTEM

SHALL BE ROOF MOUNTED WHERE ROOF CONDITIONS AND SQUARE FOOTAGE

PROVIDE ADEQUATE CAPACITY FOR ENERGY PRODUCTION. THIS PROJECT DOES NOT

INCLUDE STORAGE BATTERIES.

PREPARED BY:

CIVIL ENGINEER: GRADY ANDERSON

BUREAU OF LAND MANAGEMENT

WESTERN MONTANA DISTRICT

106 N. PARKMONT

BUTTE, MT 59701

AutoCAD SHX Text

HOLTER LAKE CAMPGROUND

AutoCAD SHX Text

DEVILS ELBOW CAMPGROUND

AutoCAD SHX Text

WHITE SANDY CAMPGROUND

AutoCAD SHX Text

LOG GULCH CAMPGROUND

AutoCAD SHX Text

SYMBOL

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

SYMBOL

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

INTERSTATE HIGHWAY

AutoCAD SHX Text

U.S. HIGHWAY

AutoCAD SHX Text

STATE CAPITOL

AutoCAD SHX Text

BLM STATE OFFICE

AutoCAD SHX Text

BLM DISTRICT OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

STATE HIGHWAY

C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\LAKESITE PHOTOVOLTAICS\DWG\06_IMPROVEMENT

SHEETS\LAKESITE SOLAR - LGND.DWG

L E

G E

B B

R E

V I A

T I O

N S

ABBREVIATIONS

AB AGGREGATE BASE OVHD OVERHEAD

ABC AGGREGATE BASE COURSE OVHG OVERHAND

ABUT ABUTMENT PC POINT OF CURVATURE

AC ACRE POC POINT ON CURVE

ASPH ASPHALT PROP PROPOSED

AST ABOVE GROUND STORGAGE TANK PSI POINDS PER SQUARE INCH

BLDR BOULDER PT POINT OF TANGENCY

BLM BUREAU OF LAND MANAGEMENT PVC POLYVINYL CHLORIDE

BM BENCHMARK PVI POINT OF VERTICAL INTERSECTION

BNDRY BOUNDARY PVMT PAVEMENT

BP BEGIN POINT Q PEAK DISCHARGE VOLUME

BRDGE BRIDGE R RADIUS

BTM BOTTOM RCP REINFORCED CONCRETE PIPE

C CONCRETE RDWY ROADWAY

CF CUBIC FEET RET RETAINING

CHCK CHECK POINT RGRCP RUBBER GASKETED REINFORCED CONCRETE PIPE

CL CENTERLINE RL RIDGE LINE

CMP CORRUGATED METAL PIPE ROW RIGHT OF WAY

CONC CONCRETE S SLOPE

CTRL CONTROL POINT SB SOUTHBOUND

CY CUBIC YARD SD STORM DRAIN

DEMO DEMOLITION SF SQUARE FEET

DET DETAIL SHT SHEET

DIA DIAMETER SPTC SEPTIC

DIP DUCTILE IRON PIPE SSWR SANITARY SEWER

E

EAST, EASTING

STA STATION

EB EAST BOUND STD STANDARD

ELEC ELECTRICAL STRM STORM

ELEV ELEVATION SW SIDEWALK

EOR EDGE OF ROAD SY SQUARE YARD

EP END POINT TC TOP OF CURB

ESMT EASEMENT TEMP TEMPORARY

EX EXISTING TP TURNING POINT

FES FLAIRED END SECTION TR TRAIL

FFE FINISHED FLOOR ELEVATION TS TOP SOIL

FG FINISHED GRADE TV TELEVISION

FO FIBER OPTIC TYP TYPICAL

FR FIRE RING UG UNDERGROUND

G GUTTER UST UNDERGROUND STORAGE TANK

GB GRADE BREAK VC VERTICAL CURVE

GV GAS VALVE VCP VITRIFIED CLAY PIPE

HDPE HIGH DENSITY POLETHELYN VOL VOLUME

HP HIGH POINT W WELL

HWE HIGH WATER ELEVATION WB WEST BOUND

INV INVERT WV WATER VALVE

IP IRON PIPE YD YARD

L LENGTH

LF LINEAR FEET

LP LOW POINT

MAX MAXIMUM

MH MANHOLE

MID MID POINT

MIN MINIMUM

MP MILE POST

MPH MILES PER HOUR

N

NORTH, NORTHING

NAD NORTH AMERICA DATUM

NAVD NORTH AMERICA VERTICAL DATUM

NB NORTH BOUND

OC ON CENTER

OFF OFFSET

TOPOGRAPHY LEGEND

EXISTING PROPOSED

MAJOR CONTOUR

MINOR CONTOUR

SPOT ELEVATION

SLOPE ARROW

STORM DRAIN LEGEND

EXISTING PROPOSED

STORM DRAIN / CULVERT

CATCH BASIN

MANHOLE

WATER LEGEND

EXISTING PROPOSED

PIPE

FITTING

HOSE BIB

HYDRANT

REDUCER

VALVE

WELL

W

SITE LEGEND

EXISTING PROPOSED

BUILDING OUTLINE

CURB AND GUTTER

BEAR BOX

FIRE RING

PINDOWN

PICNIC TABLE

SIGN

W

1234 1234

12.34

12.34%

12.34

CALLOUT LEGEND

DEMOLITION PLAN CALLOUT

SITE PLAN CALLOUT

GRADING & DRAINAGE PLAN CALLOUT

ROADWAY PLAN CALLOUT

WATER CALLOUT PLAN

SEWER PLAN CALLOUT

REVISION

SANITARY SEWER & SEPTIC LEGEND

EXISTING PROPOSED

PIPE

MANHOLE

CLEANOUT

S

ROADWAY LEGEND

EXISTING PROPOSED

CENTERLINE

CURB AND GUTTER

PROPOSED MATERIAL LEGEND

RIPRAP (GRADE 5)

GRASS

RIPRAP (GRADE 4)

WASTE

RIPRAP (GRADE 3)

TOP SOIL

RIPRAP (GRADE 2) CONCRETE (BOAT RAMP)

RIPRAP (GRADE 1)

CONCRETE

NATIVE MATERIAL ASPHALT

REFERENCE DETAIL LEGEND

FULL SECTION

PARTIAL SECTION

PROFILE & SECTION TITLE

C#

C#

C#

C# HORZ SCALE: 1" = #'

VERT SCALE: 1" = #'

CROSS SECTION

SD

12.34%

ELECTRICAL

EXISTING PROPOSED

ELECTRIC UNDERGROUND

ELECTRIC OVERHEAD

UGE

UGE

OHE OHE

B

K E

S I T

E

P

H O

T O

V O

L T

A

S

T E

M S

B U

R E

L

A N

D

M

A N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: CM APPROVED BY: LB)

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

D

E S

I G

N B

U I L

D

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

B U

T T

E

F

I E

F

I C

E

E N

E R

P R

O V

E M

E N

T

P

L

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

T

T

T

T

T

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

T

T

T

T

T

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

UGE

UGE

U

G

E

U

G

E

W

W

W

U

G

E

T

UGE

UGE

D

R

Y

S

T

O

R

A

G

E

B

U

I

L

D

I

N

G

G

A

R

A

G

E

C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\LAKESITE PHOTOVOLTAICS\DWG\06_IMPROVEMENT

SHEETS\SITE PLAN - SOLAR.DWG

D E

V I L

B

P

R O

P O

S E

D

S

I T

E

P

L A

N

B L

M

L

A K

E S

I T

E

P

H O

T O

V O

L T

A

S

T E

M S

B U

R E

L A

N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: CM APPROVED BY: LB)

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

D

E S

I G

N B

U I L D

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

B U

T T

E

F

I E

F

I C

E

E N

E R

P R

O V

E M

E N

T

P

L A

N

DISTRIBUTION PANEL

(P1.1)

DRY STORAGE GARAGE

DEVIL'S ELBOW ADMIN BUILDING

TRANSFORMER (T1)

EXISTING UNDERGROUND ELECTRIC

MAIN DISTRIBUTION FROM YORK ROAD

NW ENERGY UTILITY

METER ID EF62762982

(E1.1)

PROPOSED ROOF MOUNT

ARRAY LOCATION

NOTES:

INSTALL A COMBINATION OF ROOF MOUNTED SOLAR ARRAYS CAPABLE OF PRODUCING 25,000 KWH ANNUALLY

ARRAY TO BE UTILIZED FOR ENERGY OFFSET OF TWO UTILITY METERS ON SITE (E1.1 & E1.2)

ARRAY TO BE INSTALLED BY NABCEP LICENSED PVIP INSTALLER IN THE STATE OF MT

INSTALLER IS RESPONSIBLE FOR ALL PERMITS AND CORRESPONDENCE WITH NW ENERGY PRIOR TO INSTALLATION AS WELL AS THE FOLLOWING

· Design and installation of a roof-mounted photovoltaic system including modules (375W min), microinverters, wiring, breakers, and remote monitoring capabilities.

· All system components shall comply with the Buy American Act (BAA) and shall be manufactured in the United States. For components not available domestically exceptions must be approved by the BLM.

· System design must be submitted and approved through local utility provider's application/approval program for photovoltaic arrays

· Mounting system functional with the existing roof type (low-slope, metal roofing)

· Installed grounding, wiring, and overcurrent protection consistent with current National Electric Code (NEC), International Residential Code (IRC), and International Energy Conservation Code (IECC)

· Design shall include a complete set of construction documents, including drawings, specifications, cost estimate, and performance time.

SITE CONDITIONS

ROOF TYPE: METAL/ LOW-SLOPE

ROOF AGE: 2022

SHADING POTENTIAL: GARAGE MAY EXPERIENCE SHADING FROM DRY STORAGE BUILDING

DEVIL'S ELBOW SITE PLAN - PROPOSED LAYOUT

SCALE 1" =10'

N

0 10 20

FULL SCALE (22" X 34") 1 IN . = 10 FT.

HALF SCALE (11" X 17") 1 IN . = 20 FT.

D3

GARAGE

SUBPANEL

(P1.3)

DRY STORAGE

ELECTRIC METER

E337538808 (E1.2)

DRY STORAGE

DISTRIBUTION PANEL (P1.2)

ASPHALT PARKING AREA

ESTIMATED QUANTITIES

ITEM UNIT QUANTITY

GARAGE PV ARRAY (E1.1) ANNUAL KWH 10000

DRY STORAGE PV ARRAY (E1.2) ANNUAL KWH 15000

NEW ELECTRICAL (IN CONDUIT

FOR OUTSIDE RUNS)

LINEAR FEET 100

TWO-WAY METER EACH 2

JUNCTION BOX EACH 2

NEW UNDERGROUND ELECTRICAL

RUN IN EXISTING CONDUIT

4'-6"

8'

14'

16'

14' 8'

14'

8'-3"

1'-9"

16'

13'-3"

45'

54'-0"

25'-10"

STRAIGHT METAL ROOFING

24 GA PVDF WEATHERED COPPER

16 X 1" NAIL STRIP

2' EVE

SOFFIT PANEL V GROOVE

WEATHERED COPPER

WINDOWS ON 3 SIDES OF

BUILDING EVENLY SPACED

28'

28'

9'-0"'

36'-0"'

7'-0"'

24 GAUGE HIP/RIDGE CAP

INSTALLED 24 GA

6" MINI GABLE FLASHING

WHITE SEAMLESS

ALUMINUM GUTTER

SEAMLESS MTL. GUTTER

(ALL AROUND)

1"x6" FASCIA

CONCRETE SLAB

2"x4" BRACING

DESIGNED TRUSS RAFTERS

29 GA MEDIUM BROWN METAL

FASCIA COVER OVER 1"x6" FASCIA

ICE & WATER

UNDERLAYMENT

(HYDRASHELL SA)

40-INCH MIN

ICE DAM ABOVE

OVERHEAD DOORS

(18" FROM EAVE)

24 GA PVDF

WEATHERED COPPER

ROOF PANELS

ROOF UNDERLAYMENT

(HYDRASHELL SUPREME)

16'-10"

37'-10"

C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\LAKESITE PHOTOVOLTAICS\DWG\06_IMPROVEMENT

SHEETS\SITE - ROOFS.DWG

D E

V I L

B

I L

D I N

G

P

R O

F I L

E S

B L

M

L

A K

E S

I T

E

P

H O

T O

V O

L T

A

S

T E

M S

B U

R E

L A

N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: CM APPROVED BY: LB)

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

D

E S

I G

N B

U I L D

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

B U

T T

E

F

I E

F

I C

E

E N

E R

P R

O V

E M

E N

T

P

L A

N

DEVIL'S ELBOW

DRY STORAGE GARAGE - ELEVATION SOUTH

NO SCALE

DEVIL'S ELBOW

DRY STORAGE GARAGE - ELEVATION EAST

NO SCALE

DEVIL'S ELBOW GARAGE - ELEVATION EAST

NO SCALE

GENERAL NOTES:

MEASURE EXISTING ROOF STRUCTURE. CREATE PLAN WITH

EXPECTED OFFSETS FROM ROOF FEATURES AND FIRE

ACCESS REQUIREMENTS. ADJUST PHOTOVOLTAIC

MODULES TO CREATE A SYMMETRICAL APPEARANCE ON

ROOF.

LOCATE AND SPACE EXPOSED FASTENERS IN UNIFORM

VERTICAL AND HORIZONTAL ALIGNMENT. USE PROPER

TOOLS TO OBTAIN CONTROLLED UNIFORM COMPRESSION

FOR POSITIVE SEAL WITHOUT RUPTURE OF WASHER.

CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR

TO CONSTRUCTION

GARAGE NOTES:

ROOFING MATERIAL IS BRIDGER STEEL 24 GAGE PVDF

CASCADIA WEATHERED COPPER SRI:27.

ROOF REPLACED IN 2022.

ESTIMATED TOTAL ROOF SURFACE AREA: 1273 SF

ESTIMATED USABLE SURFACE AREA W/SETBACKS = 954 SF

ASSUME 50% SOUTH FACING AND 50 % NORTH FACING

DRY STORAGE NOTES:

BUILDING CONSTRUCTED IN 2022.

ESTIMATED TOTAL ROOF SURFACE AREA: 2409 SF

ESTIMATED USABLE SURFACE AREA W/SETBACKS = 1807 SF

DEVIL'S ELBOW GARAGE - ELEVATION WEST

NO SCALE

DEVIL'S ELBOW GARAGE - ELEVATION SOUTH

NO SCALE

WALL SECTION

NO SCALE

[3]

THE CONCEPTUAL DRAWING IS TO BE UTILIZED

FOR DEPICTING ROUGH EXISTING DIMENSIONS

ONLY. THE ARE AN ESTIMATE OF THE ENGINEER

AND SHALL BE VERIFIED BY THE CONTRACTOR.

THE CONTRACTOR SHALL MAKE THEIR OWN

INDEPENEDENT ESTIMATE OF DIMENSIONS,

STRUCTURAL INTEGRITY OF ALL ROOFING

SYSTEMS, MATERIAL QUANTITIES, AND BID

THEREON.

AutoCAD SHX Text 2'-0"

AutoCAD SHX Text

36"

TYP.

R

I

D

G

E

18" RIDGE OFFSET

48" ACCESS

PATHWAYS

E

A

V

E

16'-10"

37'-10"

36"

TYP.

R

I

D

G

E

18" RIDGE OFFSET

48" ACCESS

PATHWAYS

E

A

V

E

25'-10"

54'

R

O

O

R

O

O

B L

M

L

A K

E S

I T

E

P

H O

T O

V O

L T

A

S

T E

M S

B U

R E

L A

N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: CM APPROVED BY: LB)

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

D

E S

I G

N B

U I L D

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

B U

T T

E

F

I E

F

I C

E

E N

E R

P R

O V

E M

E N

T

P

L A

N

C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\LAKESITE PHOTOVOLTAICS\DWG\06_IMPROVEMENT

SHEETS\SITE - ROOFS.DWG

D E

V I L

B

O

F

P

L A

O

T O

S

DEVIL'S ELBOW GARAGE

ROOFING INSET

NW ENERGY METER ID:

EF62762982 (E1.1)

DISTRIBUTION PANEL (P1.1)

DEVIL'S ELBOW DRY STORAGE

GARAGE ROOF PLAN (CONCEPTUAL)

NO SCALE

DRY STORAGE ROOF PLAN (CONCEPTUAL)

NO SCALE

N

[4]

THE CONCEPTUAL DRAWING IS FOR DEPICTING

ROUGH SURFACE AREA PURPOSES ONLY. THEY

ARE AN ESTIMATE OF THE ENGINEER. THE

CONTRACTOR SHALL MAKE THEIR OWN

INDEPENEDENT ESTIMATE OF WORKABLE

SURFACE AREA, MATERIAL QUANTITIES, AND BID

THEREON.

P

T

I

C

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

U

G

E

U

G

E

U G

E

U G

E

W

W

W

F

O

F

O

F

O

F

O

F

O

F

O

F

OS

E

P

T

I

C

S

E

P

T

I

C

S E

P T

IC

S E

P T

IC

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

B L

M

L

A K

E S

I T

E

P

H O

T O

V O

L T

A

S

T E

M S

B U

R E

L A

N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: CM APPROVED BY: LB)

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

D

E S

I G

N B

U I L D

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

B U

T T

E

F

I E

F

I C

E

E N

E R

P R

O V

E M

E N

T

P

L A

N

C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\LAKESITE PHOTOVOLTAICS\DWG\06_IMPROVEMENT

SHEETS\SITE PLAN - SOLAR.DWG

H O

L T

K

E

P

R O

P O

S E

D

S

I T

E

P

L A

N

N

0 10 20

FULL SCALE (22" X 34") 1 IN . = 10 FT.

HALF SCALE (11" X 17") 1 IN . = 20 FT.

NOTES:

INSTALL ROOF MOUNTED PHOTOVOLTAIC ARRAYS CAPABLE OF PRODUCING 10,000 KWH ANNUALLY TO OFFSET ENERGY

USAGE ON SITE:

ARRAY TO BE UTILIZED FOR ENERGY OFFSET OF METER ES74463614

ARRAYS TO BE INSTALLED BY NABCEP PVIP LICENSED INSTALLER IN THE STATE OF MT

INSTALLER IS RESPONSIBLE FOR ALL PERMITS AND CORRESPONDENCE WITH NW ENERGY PRIOR TO INSTALLATION AS

WELL AS THE FOLLOWING

· Design and installation of a roof-mounted photovoltaic system including modules (375W min) , microinverters, wiring, breakers, and remote monitoring capabilities.

· All system components shall comply with the Buy American Act (BAA) and shall be manufactured in the United States. For components not available domestically exceptions must be approved by the BLM.

· System design must be submitted and approved through local utility provider's application/approval program for photovoltaic arrays

· Mounting system functional with the existing roof type (low-slope, metal roofing)

· Installed grounding, wiring, and overcurrent protection consistent with current National Electric Code (NEC), International

Residential Code (IRC), and International Energy Conservation Code (IECC)

· Design shall include a complete set of construction documents, including drawings, specifications, cost estimate, and performance time.

200 AMP AC SERVICE PANEL (P2.1)

HOLTER LAKE

ADMIN BUILDING

NW ENERGY UTILITY

METER# 92331689 (E2.2)

PROPOSED ROOF MOUNT

ARRAY LOCATION

HOLTER LAKE SITE PLAN - PROPOSED LAYOUT

SCALE 1" =10'

RV LOCATIONS

SITE CONDITIONS

ROOF TYPE: METAL, LOW SLOPE

ROOF AGE: 2022

SHADING POTENTIAL:

NORTH FACING ROOF ASPECT

ASPHALT PARKING AREA

ESTIMATED QUANTITIES

ITEM UNIT QUANTITY

ROOF MOUNTED

PV ARRAY (E2.1)

ANNUAL KWH 10000

NEW ELECTRICAL LINEAR FEET 100

TWO-WAY METER EACH 1

COMBINER BOX EACH 1

NW ENERGY UTILITY

METER #ES74463614 (E2.1)

G

A

R

A

G

E

ADDITIONAL ROOF MOUNT

PV LOCATION

EXT. LIGHT FIXT.

48'

15'-2"

14'-9"

8'

29 GA HIP/RIDGE CAP

48'

C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\LAKESITE PHOTOVOLTAICS\DWG\06_IMPROVEMENT

SHEETS\SITE - ROOFS.DWG

H O

L T

K

E

B

U I L

D I N

G

P

R O

F I L

E S

B L

M

L

A K

E S

I T

E

P

H O

T O

V O

L T

A

S

T E

M S

B U

R E

L A

N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: CM APPROVED BY: LB)

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

D

E S

I G

N B

U I L D

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

B U

T T

E

F

I E

F

I C

E

E N

E R

P R

O V

E M

E N

T

P

L A

N

HOLTER LAKE - ELEVATION SOUTH

NO SCALE

HOLTER LAKE - ELEVATION EAST

NO SCALE

HOLTER LAKE - ELEVATION NORTH

NO SCALE

GENERAL NOTES:

ROOFING MATERIAL IS BRIDGER STEEL 24 GAGE PVDF CASCADIA WEATHERED COPPER SRI:27.

ROOF REPLACED IN 2022.

MEASURE EXISTING ROOF STRUCTURE. CREATE PLAN WITH EXPECTED OFFSETS FROM ROOF FEATURES AND

FIRE ACCESS REQUIREMENTS. ADJUST PHOTOVOLTAIC MODULES TO CREATE A SYMMETRICAL APPEARANCE

ON ROOF.

LOCATE AND SPACE EXPOSED FASTENERS IN UNIFORM VERTICAL AND HORIZONTAL ALIGNMENT. USE

PROPER TOOLS TO OBTAIN CONTROLLED UNIFORM COMPRESSION FOR POSITIVE SEAL WITHOUT RUPTURE OF

WASHER.

CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION

HOUSE NOTES:

ESTIMATED TOTAL ROOF SURFACE AREA: 2000 SF

ESTIMATED USABLE SURFACE AREA W/SETBACKS = 1500 SF

ASSUME 60% SOUTH FACING AND 40 % NORTH FACING

[3]

THE CONCEPTUAL DRAWING IS TO BE UTILIZED

FOR DEPICTING ROUGH EXISTING DIMENSIONS

ONLY. THE ARE AN ESTIMATE OF THE ENGINEER

AND SHALL BE VERIFIED BY THE CONTRACTOR.

THE CONTRACTOR SHALL MAKE THEIR OWN

INDEPENEDENT ESTIMATE OF DIMENSIONS,

STRUCTURAL INTEGRITY OF ALL ROOFING

SYSTEMS, MATERIAL QUANTITIES, AND BID

THEREON.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

RAMP TO ROAD

AutoCAD SHX Text

V E

R

ID

G E

18" RIDGE OFFSET

40'-1"

48'

36"

TYP.

VENT

R

O

O

F

S

L O

B L

M

L

A K

E S

I T

E

P

H O

T O

V O

L T

A

S

T E

M S

B U

R E

L A

N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: CM APPROVED BY: LB)

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

D

E S

I G

N B

U I L D

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

B U

T T

E

F

I E

F

I C

E

E N

E R

P R

O V

E M

E N

T

P

L A

N

C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\LAKESITE PHOTOVOLTAICS\DWG\06_IMPROVEMENT

SHEETS\SITE - ROOFS.DWG

H O

L T

K

E

R

O O

F

P

L A

N

A

O

T O

S

ELEVATION - EAST

ELEVATION - NORTH

ELEVATION - SOUTH

DISTRIBUTION PANEL (D2.1)

UTILITY METER (E2.1)

HOLTER LAKE ROOF MOUNTED PV (CONCEPTUAL)

NO SCALE

N

[4]

THE CONCEPTUAL DRAWING IS FOR DEPICTING

ROUGH SURFACE AREA PURPOSES ONLY. THEY

ARE AN ESTIMATE OF THE ENGINEER. THE

CONTRACTOR SHALL MAKE THEIR OWN

INDEPENEDENT ESTIMATE OF WORKABLE

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

W

W

W

W

W

W

W

W

W

W

W

W

W

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U G

E

U G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

W

W

W

W

W

W

W

W

W

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U G

E

U G

E

U G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

S

S

CTRL 100

C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\LAKESITE PHOTOVOLTAICS\DWG\06_IMPROVEMENT

SHEETS\SITE PLAN - SOLAR.DWG

W H

I T

E

S

A N

O

P O

S E

D

S

I T

E

P

L A

N

B L

M

L

A K

E S

I T

E

P

H O

T O

V O

L T

A

S

T E

M S

B U

R E

L A

N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: CM APPROVED BY: LB)

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

D

E S

I G

N B

U I L D

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

B U

T T

E

F

I E

F

I C

E

E N

E R

P R

O V

E M

E N

T

P

L A

N

N

0 10 20

FULL SCALE (22" X 34") 1 IN . = 10 FT.

HALF SCALE (11" X 17") 1 IN . = 20 FT.

AC SERVICE PANEL (P3.1)

WHITE SANDY ADMIN

BUILDING AND GARAGE

CARPORT

TRANSFORMER (T3.1)

NW ENERGY UTILITY

METER EF62762982 (E3.1)

PROPOSED ADDITIONAL ROOF MOUNT

ARRAY LOCATION

NOTES:

INSTALL A COMBINATION OF ROOF AND GROUND MOUNTED PHOTOVOLTAIC ARRAYS CAPABLE

OF PRODUCING 11,000 KWH ANNUALLY

ARRAY TO BE UTILIZED FOR ENERGY OFFSET OF METER DG15007391

ARRAY TO BE INSTALLED BY NABCEP PVIP LICENSED INSTALLER IN THE STATE OF MT

INSTALLER IS RESPONSIBLE FOR ALL PERMITS AND CORRESPONDENCE WITH NW ENERGY

PRIOR TO INSTALLATION AS WELL AS THE FOLLOWING

· Design and installation of a roof-mounted photovoltaic system including modules (375W min), microinverters, wiring, breakers, and remote monitoring capabilities.

· All system components shall comply with the Buy American Act (BAA) and shall be manufactured in the United States. For components not available domestically exceptions must be approved by the BLM.

· System design must be submitted and approved through local utility provider's application/approval program for photovoltaic arrays

· Mounting system functional with the existing roof type (low-slope, metal roofing)

· Installed grounding, wiring, and overcurrent protection consistent with current National Electric

Code (NEC), International Residential Code (IRC), and International Energy Conservation

Code (IECC)

· Design shall include a complete set of construction documents, including drawings, specifications, cost estimate, and performance time.

SITE CONDITIONS

ROOF TYPE: METAL/ LOW SLOPE

ROOF AGE: 2022

WHITE SANDY SITE PLAN - PROPOSED LAYOUT

SCALE 1" =10'

ESTIMATED QUANTITES

ITEM UNIT QUANTITY

ROOF MOUNTED PV ARRAY ANNUAL KWH 11000

NEW ELECTRICAL LINEAR FEET 100

TWO-WAY METER EACH 1

COMBINER BOX EACH 1

PROPOSED PRIMARY ROOF MOUNT

ARRAY LOCATION

10' WIDE

OVERHEAD

DOOR

10' WIDE

OVERHEAD

DOOR

48'

28'

30'

48'

1'

7'

2'

28'

2'x48'x6" CONCRETE APRON

SEAMLESS MTL. GUTTER

(ALL AROUND)

1"x6" FASCIA

CONCRETE SLAB

2"x4" BRACING

DESIGNED TRUSS RAFTERS

SOFFIT VENT

29 GA HIP/RIDGE CAP

5'-9"

50'

ICE BREAKS ABOVE

OVERHEAD DOORS

ROOF UNDERLAYMENT

(HYDRASHELL SUPREME)

2"x6" (NOM)

T&G ROOF DECK

"x36" TUFF RIB 29

GA ROOF PANELS

ICE & WATER UNDERLAYMENT

(SHARKSKIN ULTRA SA)

29 GA MEDIUM BROWN METAL

FASCIA COVER OVER 1"x6" FASCIA

16'-11"

C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\LAKESITE PHOTOVOLTAICS\DWG\06_IMPROVEMENT

SHEETS\SITE - ROOFS.DWG

W H

I T

E

S

A N

I L

D I N

G

P

R O

F I L

E S

B L

M

L

A K

E S

I T

E

P

H O

T O

V O

L T

A

S

T E

M S

B U

R E

L A

N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: CM APPROVED BY: LB)

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

D

E S

I G

N B

U I L D

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

B U

T T

E

F

I E

F

I C

E

E N

E R

P R

O V

E M

E N

T

P

L A

N

WHITE SANDY GARAGE ELEVATION - FRONT

NO SCALE

WHITE SANDY GARAGE ELEVATION - WEST

NO SCALE

GARAGE / ADMIN SITE - PLAN VIEW

NO SCALE

WALL SECTION

NO SCALE

GENERAL NOTES:

ROOFING MATERIAL IS BRIDGER STEEL 24 GAGE PVDF CASCADIA

WEATHERED COPPER SRI:27.

ROOF REPLACED IN 2022.

MEASURE EXISTING ROOF STRUCTURE. CREATE PLAN WITH EXPECTED

OFFSETS FROM ROOF FEATURES AND FIRE ACCESS REQUIREMENTS.

ADJUST PHOTOVOLTAIC MODULES TO CREATE A SYMMETRICAL

APPEARANCE ON ROOF.

LOCATE AND SPACE EXPOSED FASTENERS IN UNIFORM VERTICAL AND

HORIZONTAL ALIGNMENT. USE PROPER TOOLS TO OBTAIN CONTROLLED

UNIFORM COMPRESSION FOR POSITIVE SEAL WITHOUT RUPTURE OF

WASHER.

CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO

CONSTRUCTION

GARAGE NOTES:

ESTIMATED TOTAL ROOF SURFACE AREA: 1691 SF

ESTIMATED USABLE SURFACE AREA W/SETBACKS = 1268 SF

ASSUME 50% SOUTH FACING AND 50 % NORTH FACING

[3]

THE CONCEPTUAL DRAWING IS TO BE UTILIZED

FOR DEPICTING ROUGH EXISTING DIMENSIONS

ONLY. THE ARE AN ESTIMATE OF THE ENGINEER

AND SHALL BE VERIFIED BY THE CONTRACTOR.

THE CONTRACTOR SHALL MAKE THEIR OWN

INDEPENEDENT ESTIMATE OF DIMENSIONS,

STRUCTURAL INTEGRITY OF ALL ROOFING

SYSTEMS, MATERIAL QUANTITIES, AND BID

THEREON.

AutoCAD SHX Text

D

G

E

18" RIDGE OFFSET

48" ACCESS

PATHWAYS

E

A

V

E

16'-11"

50'

36"

TYP.

16'-11"

VENT

E

A

V

E

R

O

O

B L

M

L

A K

E S

I T

E

P

H O

T O

V O

L T

A

S

T E

M S

B U

R E

L A

N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: CM APPROVED BY: LB)

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

D

E S

I G

N B

U I L D

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

B U

T T

E

F

I E

F

I C

E

E N

E R

P R

O V

E M

E N

T

P

L A

N

C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\LAKESITE PHOTOVOLTAICS\DWG\06_IMPROVEMENT

SHEETS\SITE - ROOFS.DWG

W H

I T

E

S

A N

O

F

P

L A

O

T O

S

UTILITY METER (E3.1)) JUNCTION CENTER

ELEVATION - SOUTH

GARAGE ROOF MOUNTED SOLAR CONCEPTUAL

NO SCALE

ELEVATION NORTH

N

[4]

THE CONCEPTUAL DRAWING IS FOR DEPICTING

ROUGH SURFACE AREA PURPOSES ONLY. THEY

ARE AN ESTIMATE OF THE ENGINEER. THE

CONTRACTOR SHALL MAKE THEIR OWN

INDEPENEDENT ESTIMATE OF WORKABLE

E

U G

E

U G

E

U G

E

U G

E

U G

E

U

G

E

S

S

S

S

S

S

O

H

E

O

H

E

G

G

G

G

G

U G

E

U G

E

U G

E

U G

E

U

G

E

U G

E

U G

E

U G

E

U G

E

U

G

E

U

G

E

U

G

E

U

G

E

U G

E

U G

E

U G

E

U G

E

U

G

E

U

G

E

U

G

E

U G

E

U

G

E

F

O

F

O

F

O

F

O

F O

F O

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U G

E

U G

E

U G

E

U G

E

T

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E

U

G

E

S

S

S

S

S

S

O

H

E

O

H

E

G

G

G

G

G

U G

E

U G

E

U G

E

U G

E

U

G

E

U G

E

U G

E

U G

E

U G

E

U

G

E

U

G

E

U

G

E

U

G

E

U G

E

U G

E

U G

E

U G

E

U

G

E

U

G

E

U

G

E

U G

E

U

G

E

F

O

F

O

F

O

F

O

F O

F O

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U G

E

U G

E

U G

E

U G

E

T

C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\LAKESITE PHOTOVOLTAICS\DWG\06_IMPROVEMENT

SHEETS\SITE PLAN - SOLAR.DWG

L O

G

G

U L

O

P O

S E

D

S

I T

E

P

L A

N

B L

M

L

A K

E S

I T

E

P

H O

T O

V O

L T

A

S

T E

M S

B U

R E

L A

N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: CM APPROVED BY: LB)

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

D

E S

I G

N B

U I L D

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

B U

T T

E

F

I E

F

I C

E

E N

E R

P R

O V

E M

E N

T

P

L A

N

NOTES:

INSTALL A COMBINATION OF ROOF AND GROUND MOUNTED SOLAR ARRAYS CAPABLE OF PRODUCING 11,000 KWH ANNUALLY

ARRAY TO BE UTILIZED FOR ENERGY OFFSET OF METER DG79751890

ARRAY TO BE INSTALLED BY NABCEP PVIP LICENSED INSTALLER IN THE STATE OF MT

INSTALLER IS RESPONSIBLE FOR ALL PERMITS AND CORRESPONDENCE WITH NW ENERGY PRIOR TO INSTALLATION AS WELL AS THE FOLLOWING

· Design and installation of a roof-mounted photovoltaic system including modules ((375W min), microinverters, wiring, breakers, and remote monitoring capabilities.

· All system components shall comply with the Buy American Act (BAA) and shall be manufactured in the United States. For components not available domestically exceptions must be approved by the BLM.

· System design must be submitted and approved through local utility provider's application/approval program for photovoltaic arrays

· Mounting system functional with the existing roof type (low-slope, metal roofing)

· Installed grounding, wiring, and overcurrent protection consistent with current National Electric Code (NEC), International Residential Code (IRC), and International Energy Conservation Code (IECC)

· Design shall include a complete set of construction documents, including drawings, specifications, cost estimate, and performance time.

SITE CONDITIONS

ROOF TYPE: SHINGLES, VARYING SLOPES

ROOF AGE: 2012

LOG GULCH SITE PLAN - PROPOSED LAYOUT

SCALE 1" =10'

N

0 10 20

FULL SCALE (22" X 34") 1 IN . = 10 FT.

HALF SCALE (11" X 17") 1 IN . = 20 FT.

LOG GULCH GARAGE

MAIN DISTRIBUTION PANEL

(D4.1))

NW ENERGY UTILITY METER

DG79751890 (E4.1)

LOG GULCH ADMINISTRATIVE

BUILDING

PROPOSED ROOF

MOUNT ARRAY LOCATION

ESTIMATED QUANTITES

ITEM UNIT QUANTITY

PHOTOVOLTAICS ANNUAL KWH 11000

NEW ELECTRICAL LINEAR FEET 100

TWO-WAY METER EACH 1

COMBINER BOX EACH 1

ALTERNATIVE ROOF

MOUNTED PV LOCATION

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

GV

AutoCAD SHX Text

GV

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

GV

AutoCAD SHX Text

GV

AutoCAD SHX Text O

AutoCAD SHX Text S

FIBER CEMENT SIDING AND TRIM MATERIAL & FINISH DESIGNATIONS

FC-1: JAMES HARDIE "HARDIEPLANK" SELECT CEDARMILL 6" EXPOSURE BEVELED SIDING COLORPLUS FACTORY FINISH "KHAKI BROWN"

FC-2: JAMES HARDIE "HARDIESHINGLE" STAGGERED EDGE PANEL COLORPLUS FACTORY FINISH "TRADITIONAL RED"

FC-3: JAMES HARDIE "HARDIE TRIM" BOARD RUSTIC, COLORPLUS FACTORY FINISH "NAVAJO BEIGE"

FC-4: JAMES HARDIE "HARDIE SOFFIT" VENTED CEDARMILL, COLORPLUS FACTORY FINISH "NAVAJO BEIGE"

FC-5: JAMES HARDIE "HARDIE SOFFIT" NON-VENTED CEDARMILL, COLORPLUS FACTORY FINISH "NAVAJO BEIGE"

FC-2

FC-3

3/4"x5.5"

FC-3

PT-8

3/4"x5.5"

FC-3

PT-9

FC-3

GAF/ELK "TIMBERLINE COOL

SERIES" SHINGLES, COLOR:

'COOL BARKWOOD'

GAF/ELK "TIMBERLINE COOL

SERIES" SHINGLES, COLOR:

'COOL BARKWOOD'

FC-3

3/4"x5.5"

FC-3 (TYP)

FC-1

FC-1

FC-3

FC-2

FC-3

3/4"x5.5"

FC-3 (TYP)

FC-3

FC-1

FC-1

FC-3

FC-2

FC-3

C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\LAKESITE PHOTOVOLTAICS\DWG\06_IMPROVEMENT

SHEETS\SITE - ROOFS.DWG

L O

G

G

U L

I L

D I N

G

P

R O

F I L

E S

B L

M

L

A K

E S

I T

E

P

H O

T O

V O

L T

A

S

T E

M S

B U

R E

L A

N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: CM APPROVED BY: LB)

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

D

E S

I G

N B

U I L D

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

B U

T T

E

F

I E

F

I C

E

E N

E R

P R

O V

E M

E N

T

P

L A

N

[3]

THE CONCEPTUAL DRAWING IS TO BE UTILIZED

FOR DEPICTING ROUGH EXISTING DIMENSIONS

ONLY. THE ARE AN ESTIMATE OF THE ENGINEER

AND SHALL BE VERIFIED BY THE CONTRACTOR.

THE CONTRACTOR SHALL MAKE THEIR OWN

INDEPENEDENT ESTIMATE OF DIMENSIONS,

STRUCTURAL INTEGRITY OF ALL ROOFING

SYSTEMS, MATERIAL QUANTITIES, AND BID

CONTINUOUS GUTTER @ EAVE

W/DOWNSPOUTS & SPLASH

BLOCKS AS INDICATED (TYP)

BASIS OF DESIGN ROOFING:

GAF/ELK "TIMBERLINE COOL

SERIES" SHINGLES, COLOR:

'COOL BARKWOOD' (TYP)

R

O

O

F

S

L O

R O

O

R O

O

C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\LAKESITE PHOTOVOLTAICS\DWG\06_IMPROVEMENT

SHEETS\SITE - ROOFS.DWG

L O

G

G

U L

O

F

P

L A

O

T O

S

B L

M

L

A K

E S

I T

E

P

H O

T O

V O

L T

A

S

T E

M S

B U

R E

L A

N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: CM APPROVED BY: LB)

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

D

E S

I G

N B

U I L D

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

B U

T T

E

F

I E

F

I C

E

E N

E R

P R

O V

E M

E N

T

P

L A

N

LOG GULCH HOUSE ROOF MOUNTED PV (CONCEPTUAL)

NO SCALE

N

SOUTH ELEVATION

WEST ELEVATION

UTILITY METER (E4.1)

DISTRIBUTION PANEL P4.1

[4]

THE CONCEPTUAL DRAWING IS FOR DEPICTING

ROUGH SURFACE AREA PURPOSES ONLY. THEY

ARE AN ESTIMATE OF THE ENGINEER. THE

CONTRACTOR SHALL MAKE THEIR OWN

INDEPENEDENT ESTIMATE OF WORKABLE

GROUND

L

M

L

A K

E S

I T

E

P

H O

T O

V O

L T

A

S

T E

M S

B U

R E

L A

N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: CM APPROVED BY: LB)

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

D

E S

I G

N B

U I L D

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

B U

T T

E

F

I E

F

I C

E

E N

E R

P R

O V

E M

E N

T

P

L A

N

C:\USERS\GANDERSON\ONEDRIVE - DOI\DOCUMENTS\PROJECTS\LAKESITE PHOTOVOLTAICS\DWG\06_IMPROVEMENT

SHEETS\SITE - ROOFS.DWG

S I N

G L

E

L

I N

E

D

I A

G R

A M

SINGLE LINE DIAGRAM

NO SCALE

PHOTOVOLTAIC MODULE

GROUNDING

WIRE

DISTRIBUTION

BOX

TWO-WAY UTILITY METER

MICROINVERTER

COMBINER

BOX

AC STRING

LOADS < 600 V

JUNCTION

BOX

JUNCTION

BOX

JUNCTION

BOX

ARRAY 1

ARRAY 2

ARRAY 3

Sheets and Views
01 G1 COVER
02 G2 LEGEND & ABBREVIATIONS
03 C1 DEVIL'S ELBOW PROPOSED SITE PLAN
04 C2 DEVIL'S ELBOW BUILDING PROFILES
05 C3 DEVIL'S ELBOW ROOF & PHOTOS
06 C4 HOLTER LAKE PROPOSED SITE PLAN
07 C5 HOLTER LAKE BUILDING PROFILES
08 C6 HOLTER LAKE ROOF & PHOTOS
09 C7 WHITE SANDY PROPOSED SITE PLAN
10 C8 WHITE SANDY BUILDING PROFILES
11 C9 WHITE SANDY ROOF & PHOTOS
12 C10 LOG GULCH PROPOSED SITE PLAN
13 C11 LOG GULCH BUILDING PROFILES
14 C12 LOG GULCH ROOF & PHOTOS
15 D1 LINE DIAGRAM

File details come from the government source that posted it. Updated .