This document contains an amendment to a solicitation for construction services. The Bureau of Land Management Montana State Office is seeking proposals to resurface approximately 3,200 linear feet and construct approximately 2,400 linear feet of new roadway on BLM lands near Bozeman, Montana. The amendment provides an attendance record and talking points from an optional site visit, answers to questions from prospective offerors, and extends the question and proposal response deadlines to April 24, 2023 and May 1, 2023 respectively. Offerors are advised to acknowledge receipt of the amendment. The work is to be completed between the estimated May 18th notice to proceed and November 1st within a single 56-day road closure period to be coordinated with the contracting officer's representative.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140L3623R0002 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

LMALMA

04/19/20230002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)

BLM MT STATE OFFICE

MT935

5001 SOUTHGATE DR

BILLINGS MT 59101

CODE 6. ISSUED BY

BLM MT-STATE OFFICE

MT935

5001 SOUTHGATE DR

BILLINGS MT 59101

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/15/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project Title: Copper City Road Resurfacing and Realignment - Great American Outdoors Act, Montana

See Page 2 of 6 for changes incorporated by this amendment.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Christine Mundt

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation No: 140L3623R0002 PROJECT DESCRIPTION: Copper City Road Resurfacing & Realignment (GAOA)

Amendment No. 0002

Description of Changes - This amendment incorporates the following information:

1. For informational purposes only, the Government is providing the Site Visit Attendance Records from the organized site visit that the Government held on March 23, 2023, at 1:00 pm Mountain Time.

2. For informational purposes only, the Government is providing the Site Visit Talking Points from the organized site visit that the Government held on March 23, 2023, at 1:00 pm Mountain Time.

3. The Government is providing the attached Questions received from interested offerors and the associated Answers provided by the Government.

Acknowledgement - See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of offers (See Block 8 of the Standard Form 1442).

Question Response Date – The hour and date for receipt of questions is hereby extended to 1:00 pm Mountain Time on Monday, April 24, 2023.

Proposal Response Date - The hour and date for receipt of quotations remains unchanged at 5:00 pm Mountain Time on May 1, 2023.

Third Party – If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.

SITE INSPECTION TOUR / PREBID CONFERENCE RECORD

The Government strongly urges offerors to inspect the site to gain a better understanding of the work requirements and to satisfy themselves regarding all general and local conditions that may affect the cost of performance. In no event shall failure to inspect the site constitute grounds for a claim after award.

Solicitation Number: 140L3623R0002 Project Title: Copper City Road Resurfacing & Realignment – Great American Outdoors Act, Montana Date and Time: 03/23/2023 at 1:00 PM (Noon) Meeting Place(s): Intersection of Hilltop and Highway 287 directly across from the Copper City Road.

Conducted by: Kathie Marks

Attended by:

Name Firm

Shawn Merritt Smith Contracting

David Smith Smith Contracting

Josh Becker Becker Excavation

Dennis Cripps DC Excavation and Construction

Randy Thompson RT Logging LLC

Kirkland Lemment Tri-State Dirtworks

Mike Lapp Meridian Surveying

Adam Gassett Highland Construction

Connor McGree Helena Sand and Gravel

Ty Grady Riverstone Development

Quinn Hyndman Silvertip

Josh McKenzie CK May Excavating

Alan Ringlein A.M. Welles

Copper City Site Visit Talking Points

KCM

3/27/2023

Notes about project o Work hours M-F 730-530. Desire is to allow for recreation evenings and weekends. The site will be closed, but I wouldn’t expect all recreationist to respect it.

o FP-14 free online in word or PDF can also order a free copy by emailing them.

o 153- submittal log available o 201- clearing and grubbing 203-o Specification replaced, 203 disposal methods e,f,g,j o 204- Excavation and Embankment o Specification Completely replaced.

o Compaction placement method 1- proctor testing is required o 303 placement method 2 testing not required but moisture and compactive effort are o Water no sources on site, contractor will need to procure water for compaction.

o 211 roadway obliteration o Specification Completely replaced o All road fill will be completely pulled from the draw and placed on decommissioned road.

Recountour to the best the material allows.

o Any clearing and grubbing vegetation should be spread to aid in revegetation.

o The draw is not considered a live stream o 301 Untreated Aggregate Courses o Compaction C- water and rollers no proctor testing o 703-Aggregate o 1 1/2 minus- gradation provided or approved equal If needed based on availability.

o Note plasticity requirement- if can’t be provided test native clays on site for incorporation into aggregate.

o 311-additive item o 725.02-Calcium chloride, magnesium chloride or Lignosultonate o The cost is for the application of the stabilizer. Aggregate is already paid under 30101 treat as

“in-place aggregate” in the 311 spec.

o 713- government furnished seed.

QUESTIONS AND ANSWERS

Offerors for this RFP, including subcontractors and teammates, shall consolidate questions related to this solicitation and site visit in a Request for Information (RFI) formatted Word document. Any RFI is to be emailed as an editable attachment to Christine Mundt (cmundt@blm.gov) with the subject line: RFI – 140L3623R0002 Copper City Road (GAOA). Only written RFI’s will be considered and responded to. BLM responses to the RFI will be posted as an amendment to the solicitation.

Solicitation Number: 140L3623R0002 Project Title: Copper City Road Resurfacing & Realignment – Great American Outdoors Act, Montana

Q1: Will there be a designated staging area?

A1: The trail head parking area may be used for staging of gravels equipment and materials. No native soils.

Q2: What is the compaction requirements around the pipes?

A2: Pay item30201.. Compaction Method 1. Reference Section 204.11 of the Special Contract Requirements

Compaction Placement Method 1.

Q3: How and who will perform compaction testing?

A3: See section 153 of the FP-14 and 153 of the Special contract requirements for Quality Control Manager and Testers qualifications.

Q4: Will a SWPPP permit be required for the project with disturbances > 5 acres. If so, how will the SWPPP fees and administration be paid?

A4: A SWPPP is not required there is no surface water on the project site that would invoke a SWPPP.

Q5: Can you clarify when this work is to be completed? I know the NTP is May 18th, and the completion date is mid-November, but it sounds like the road closure is for a maximum of 60 days.

A5: All work to be completed within the period of performance Notice to proceed (approx. May 18th) until Nov 1. Project site work should commence and finish in a single 56-day period. The site can be closed for up to 6 weeks. Once an award is made the successful contractor will work with the COR to coordinate actual needed closures of the site and how we may work with and accommodate the recreating public. Such as leaving the site passable to bikes on nights and weekends or providing an alternate path for bikes. It is requested that the contractor provide as much notice as possible so the BLM may prepare the recreating public for the closure.

Please reference back to Section L and Section M as the Contractor’s Construction Schedule is Factor 1 of the Technical Approach Evaluation Factor.

Q6: Will the DOT require any traffic control on the highway?

A6: We are still waiting on response from MDT but will provide additional information once received.

Attendance Record.pdf
SITE INSPECTION TOUR / PREBID CONFERENCE RECORD
Questions and Answers.pdf
QUESTIONS AND ANSWERS