SOW Blasting for Fruit Bowl Toilet_0001.docx
DOCX document 22 KB Posted
- Attached to
- BLASTING for FRUIT BOWL VAULT TOILET Federal contract opportunity
- Solicitation number
- 140L3521Q0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3521Q0001_Amd_0002.pdf | ||
| Sol_140L3521Q0001_Amd_0001.pdf | ||
| Sol_140L3521Q0001.pdf | ||
| DOL Standard SCA Wage Rates.pdf | ||
| Fruit Bowl Site Map.pdf | ||
| SOW Blasting for Fruit Bowl Toilet.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
DRILLING AND BLASTING FOR NEW TOILET
AT
FRUIT BOWL PARKING AREA, MOAB UTAH
NOVEMBER 2020
Description of Service Contractor shall provide all labor, equipment, and materials necessary to complete the following task:
1. Drill, load and blast a 11’ x 17’ x 6’ deep hole in Navajo Sandstone.
Location The hole will be blasted adjacent to the parking Lot for the Fruit Bowl Highline Area, approximately 32 miles west of Moab, Utah off Mineral Bottom Road. See attached map.
Drilling Contractor shall drill a hole pattern appropriate to the site as determined by industry best practice. Contractor should anticipate between 25 and 30 holes to a depth of 6 feet each.
Blasting Contractor shall use non-detonating rock splitting devices.
Contractor shall designate a “Master Blaster” to oversee the shoot. Contractor shall also provide all necessary safety measures required before, during, and after the shot including, but not limited to, ensuring all on-site persons and vehicles are no closer than the minimum safe distance from the blast.
Blaster should have any pertinent licenses for the State of Utah for the rock splitting devices used.
Government Furnished service The Government will clear the blasting site of soil, debris, etc. to provide an acceptable surface for drilling. The Government will also provide overcharge material to help prevent flyaway rock during blasting, and excavate the hole following the shot.
Miscellaneous A non-mandatory pre-bid meeting will be held on-site, on Thursday, December 3, 2020. Attendees to meet at the BLM Moab Field Office on Thursday, December 3, 2020 at 10:00am.
Work will not commence before February 23rd, 2021. Bids should account for this schedule.
File details come from the government source that posted it. Updated .