Sol_140L2625Q0087_Amd_0001.pdf

PDF 93 KB Posted

Attached to
MED-PAC SUPPLIES Federal contract opportunity
Solicitation number
140L2625Q0087
Issued by
Department of the Interior Bureau of Land Management Idaho Region

About this file

This document is an Amendment of Solicitation/Modification of Contract for the procurement of aluminum signposts for the Bureau of Land Management (BLM). The amendment modifies the original solicitation by extending the bid due date from 08-SEP-25 to 12-SEP-25 and establishing a performance period from 09/15/2025 to 10/15/2025. The Statement of Work (SOW) details specific requirements for manufacturing 6-foot aluminum signposts made of 6061 T6 extruded aluminum, 3/32 inch thick, with precise dimensional and hole placement specifications. The posts are intended for field surveying applications and must be uncoated, durable, and free from defects. Delivery location and schedule will be coordinated with the BLM project manager after contract award, with posts subject to inspection and potential rejection if they do not meet the outlined specifications.

View the file

Other files for this federal contract opportunity

Other files attached to MED-PAC SUPPLIES, newest first.
File Type Posted
A04_-_Statement_of_Work_for_Posts_-_2nd_0001.docx DOCX document
Sol_140L2625Q0087.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140L2625Q0087 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

LDA

BOISE ID 83709

1387 S. VINNELL WAY

BLM ID-STATE OFC HR&ADM SVC (ID953)

08/25/20250001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/25/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

LIST OF CHANGES:

Bids due date: 08-SEP-25 changed to 12-SEP-25

Period of Performance: 09/15/2025 to 10/15/2025

Statement of Work (SOW)

Project Title:

Procurement of Aluminum Signposts for BLM Surveying

1. Objective:

To procure aluminum signposts that meet the Bureau of Land Management (BLM) specifications

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Thomas Parsons

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140L2625Q0087/0001 for use in field surveying applications. These posts must be durable, uncoated, and fabricated to precise dimensional and hole placement standards.

2. Scope of Work:

The contractor shall manufacture and deliver aluminum signposts that meet the following specifications:

Material:

Type: 6061 T6 Extruded Aluminum

Thickness: 3/32 inch

Cross-Section: As per the extruded aluminum drawing provided

Finish: No paint or coating required Dimensions:

Length: 6.0 feet

Width: 2.875 inches (strip width)

Weight: Approximately 3.72 lbs. per post (shipping weight: 3.9 lbs.)

Hole Specifications:

Hole Diameter: 17/64 inches (finished size)

Hole Placement Tolerance:

Diameter: No less than specified and no more than 1/64" greater

Spacing: ±1/64" from specified placement

Hole Configuration: Posts may be punched after shaping to meet the specified hole/lug configuration

Cleats: Construct 4 cleats, 1/2" x 1/2", at 1 1/8" intervals, bent out at 30° or 1/4" MIL

3. Quality Assurance:

All posts must conform to industry standards for dimensional tolerances and hole placement.

Posts must be free from burrs, sharp edges, or deformities that could compromise safety or usability.

4. Delivery Requirements:

Posts shall be packaged securely to prevent damage during transit.

Delivery location and schedule will be coordinated with the BLM project manager upon contract award.

5. Acceptance Criteria:

Posts will be inspected upon delivery for compliance with the specifications outlined in this SOW.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140L2625Q0087/0001

Any non-conforming items will be subject to rejection and must be replaced at the contractor¿s expense.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .