Appendix_1-_PRICING_SCHEDULE-Amendment_0001_0001.pdf
PDF 143 KB Posted
- Attached to
- Big Desert Fuel Break Herbicide Application Federal contract opportunity
- Solicitation number
- 140L2624Q0025
About this file
This document is a pricing schedule for the 2024 USFO Big Desert Fuel Break Herbicide Application contract opportunity. The contract is for the application of herbicide along 64 miles of improved and unimproved desert roads, covering an estimated total of 2,210 acres. The herbicide application rate and carrier specifications are provided. The contract requires the selected contractor to start work within 3 days of being notified by the Contracting Officer Representative (COR). The solicitation number for this federal contract opportunity is 140L2624Q0025, and it is being issued by the Department of the Interior Bureau of Land Management Idaho Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08-_Amendment_0001_0001.pdf | ||
| RFI-2024_USFO_Big_Desert_Fuel_Break_Herbicide_Location_Map2_(2)_0001.pdf | ||
| B12-_RFI_0001.pdf | ||
| Sol_140L2624Q0025_Amd_0001.pdf | ||
| Attachment_1-_A06-2024_Fuel_Break_Herbicide_Application_Location_Map.pdf | ||
| Attachment_4-_A05-_SOW.pdf | ||
| Sol_140L2624Q0025.pdf | ||
| Appendix_2-_FAR_52_212-3_(FEB_2024).pdf | ||
| Attachment_3-B03-_Wage_Rates.pdf | ||
| Appendix_1-_PRICING_SCHEDULE-2024_Fuel_Break_Herbicide_Application.pdf | ||
| Attachment_2-A06-_2024_Fuel_Break_Herbicide_Application_Map.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICING SCHEDULE
2024 USFO BIG DESERT FUEL BREAK HERBICIDE APPLICATION
Item no.
Item Description
Estimated Quantity*
Unit of Measure
Unit Price
Total
0001 Fuel Break Herbicide Application 2,210 ac. $ $
TOTAL (ALL OR NONE) $
*GIS Calculated Quantity ac = acre
ESTIMATED START DATE: May 28, 2024 – June 15, 2024 TOTAL ESTIMATED ACRES: 2,210 ac.
• Herbicide application along 64 miles of improved and unimproved desert roads resulting in an affected treatment area of 150 feet either side of the designated roads.
• Application rate of 1 quart/acre of 2,4-D LV6 + 3/4 ounce/acre of Metsulfuron methyl +1 quart/acre of Picloram + 12 ounce/acre of Fluroxypyr + 1 quart/acre of MSO Concentrate with LECI-TECH. Carrier (water) will be at the 10-15 gallons per acre rate.
• During application, desert roads may not be passable due to muddy or wet conditions.
• Work will not be permitted if conditions will result in damage to soils and nontreatment vegetation.
• Contractor will be required to start work within three days after being notified by the Contracting Officer Representative (COR).
(END OF SUPPLIES/SERVICES AND PRICES/COSTS)
| 2024 USFO BIG DESERT FUEL BREAK HERBICIDE APPLICATION |
| Contractor will be required to start work within three days after being notified by the Contracting Officer Representative (COR). |