Upper Snake Road Maintenance 2023 Pre-Bid Site Tour: 05/23/2023 List of Attendees

Contractor
E-mail
Phone
Idaho Agg (Tracy Scott)
rcheavyhaulbids@yahoo.com
(208) 360-1440
BFC Diversified (Blake C Ford)
4dblake@gmail.com
(208) 520-6429

1. Where are the rock haul locations?

There will be two general locations:

Half the rock will be hauled to spot-rock locations on the middle portion of Blue Ridge Cut-Off Road.

Half the rock will be hauled to spot-rock locations on the west end of Grouse Hollow – Deep Creek Road.

2. Are there approved water sources for this project? If so where are they located?

There are no approved water sources for the project. You will have to contact local entities for possible water sources.

3. On compaction tests, are wheel rolling compaction tests with a loaded water tender acceptable or do I need to bring in a tester?

A wheel rolling compaction tests with a loaded water tender is acceptable.