140L2621R0009_BDO_Restroom_PreBidQ_A_0001.pdf
PDF 114 KB Posted
- Attached to
- BOISE DISTRICT OFFICE RESTROOM REMODEL
- Solicitation number
- 140L2621R0009
About this file
This document records the questions and answers from a pre-bid conference for the Boise District Office Restroom Remodel federal contract opportunity with the Bureau of Land Management Idaho Region. The remodel involves demolishing and reconstructing two restrooms on the first and second floors to meet ADA requirements. Asbestos and lead testing found no hazards in the work areas. Three exits are available during construction. Noise during demolition and construction may be mitigated by notifications, dust controls, and protecting unaffected areas. Procedures for addressing any mold found will be determined with the Contracting Officer. Wall framing and vapor barriers must extend fully to the floor deck above. Existing electric door openers can be reused or matched to specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L2621R0009_Amd_0001.pdf | ||
| DRAFT_L1291_Boise_District_Main_Administrative_Building_ACM_Report_0001.pdf | ||
| Specifications.pdf | ||
| Sol_140L2621R0009.pdf | ||
| SF-24_Bid_Bond.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Form 1510-56
(December 1985)
UNITED STATES
DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
SITE INSPECTION TOUR / PREBID CONFERENCE RECORD
1. Solicitation Number: 140L2621R0009 4. Meeting Place: BDO, 3948 S. Development Ave., Boise, ID
2. Title: COR, Civil Engineer 5. Conducted by: Daylon Dubkowski
3. Date and Time: 7/22/2021, 10:00 a.m.
Attended by:
Name and Firm Address (include zip code) Phone (include area code)
Daylon Dubkowski – BLM, COR 3948 S. Development Ave., Boise, ID 83705 208-384-3429
Eric Rayborn – BLM, PI 3948 S. Development Ave., Boise, ID 83705 208-866-8052
Tanya Pardy – BLM 1387 S. Vinnell Way, Boise, ID, 83709 208-373-3858
Charles Corr – DO Fine Construction 218 W. 13th St., Burley, ID 83318 208-878-6000
Liercke Construction P.O. Box 781, Mountain Home, ID 83647 208-573-4976
Dustin Campbell, BCI 5301 W. Bethel St., Boise, ID 83702 208-277-6569
Jared Lizardo – Winspear Construction 1735 S. Federal Way, Boise, ID 83702 208-333-7738
Trevor Thiel – Winspear Construction 1735 S. Federal Way, Boise, ID 83702 208-333-7738
Brent Lacy – Lacy Mechanical, Inc. 9974 W. Fairview Ave., Boise, ID 83704 208-377-3237
John Niendorf – AAI Demo P.O. Box 2593, Boise, ID 83701 208-345-3574
Korry Holden – AAI Demo P.O. Box 2593, Boise, ID 83701 208-345-3574
8. Questions asked and responses given: -140L2621R0009, Boise District Office Restroom Remodel-
1) Q: Is there asbestos or lead in the area of construction? A: Sampling-testing was done for asbestos and the only place it was found in the building was outside the work area in hard kitchen/breakroom flooring. Lead paint sampling was negative and did not indicate the presence of lead (Method: 3M lead check swabs). Building construction was completed in 1981.
2) Q: What are the exits during demo and constriction? A: 3 exits available, the emergency door upstairs north side, west side doors downstairs, and north side door downstairs in break room.
3) Q: Is noise during demo/construction a problem? Restrictions? A: No, everyone in the office will be notified of demo and construction. employees may have the option of teleworking during this time or minimizing their time in the office. Use drop clothes, plastic, etc.
to minimize dust transmission and protect areas that are outside the work area. Care needs to be taken to not set off the fire alarms.
Work with Work with the Contracting Officer’s Representative (COR)/Project Inspector (PI) on solutions and putting system into test mode.
4) Q: How do we handle mold if it is encountered during demolition/construction. A: If mold is encountered then we’ll work with the Contracting Officer on a remedy-solution.
5) Q: A101-plan note 11 graphically shows two square boxes on the second floor that appear to be in the exterior wall. Is this accurate? A: Yes, Plan Note 11 represented graphically as two square boxes on the second floor are in the exterior wall.
6) Q: A101-wall type B calls for the fur out and vapor barrier to be ran to the deck above. Is this what is intended or is running it to the ceiling acceptable? A: Design drawings indicate wall furring and vapor barrier is to be run full height to deck above.
7) Q: Plan sheet E200 note 3 calls for installation of an electric door opener and push button. This is not identified in the specifications or any other location of the plans. Will the government please provide specification for opener and push button? A: Existing door openers are functional and could be reused, or match existing type and function and provide submittal during review and approval process.
9. Was a complete site inspection tour made? __X__yes ____no (If “No”, explain)
By (Name)
Daylon Dubkowski
Title
COR, Civil Engineer
Date
7/22/2021
File details come from the government source that posted it. Updated .