Sol_140L1722Q0030_Amd_0001.pdf
PDF 89 KB Posted
- Attached to
- EAST DRY MTN FENCING PROJECT
- Solicitation number
- 140L1722Q0030
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L1722Q0030 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
LRA
LAKEWOOD CO 80215
2850 YOUNGFIELD STREET
COLORADO STATE OFFICE
08/09/20220001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/02/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment is issued to cancel the optional site visit scheduled on Wednesday, August
10th, 2022. No other changes have been made.
LIST OF CHANGES:
Date distributed : 02-AUG-22 changed to 09-AUG-22
Period of Performance: 09/12/2022 to 11/30/2023
Below are questions and answers BLM have received:
Question: I had a couple of questions about this project. I know it states that the wood
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Chau Nguyen
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140L1722Q0030/0001 posts should be blunt ended, is the contractor allowed to drive the wood posts vs hand set posts? Driving posts is much more cost-efficient and less destructive to the area than hand setting.
Answer: Please refer to the following excerpt from page 5 of the Statement of Work:
WIRE FENCE AND GATE
3.3 INSTALLATION:
C. Driving Posts:
1. Wood Posts: Driving wood posts will not be allowed.
2. Steel Posts: Drive into the ground to the depth shown on the drawings. Posts shall be driven plumb and in a straight line along the alignment.
Question: Also, I didn't see a defined period of performance, just restrictions for dates when working can take place due to wildlife, can you provide the actual period of performance?
Answer:
1.9 SEQUENCING AND SCHEDULING:
A. Work Schedule: The work schedule shall be submitted at the pre-work conference. All work shall occur between May 1 to November 30. No surface disturbing activities can occur between
December 1 to April 30 to protect wintering big game. It is anticipated that work will take place within a 14 day period after mobilization.
When requested, the Contractor shall submit an updated schedule within 3 calendar days. The period of performance will be from September 12, 2022 through November 30, 2023. It is anticipated that work will take place within a 14 day period after mobilization. That two week window will be determined in coordination with the BLM by the successful vendor at the pre-work conference.