A02_-_140L1721Q0043-_Revised_Statement_of_Work_0001.docx

DOCX document 2 MB Posted

Attached to
CLIFF SPRING EXCLOSURE Federal contract opportunity
Solicitation number
140L1721Q0043
Issued by
Department of the Interior Bureau of Land Management Colorado Region

View the file

Other files for this federal contract opportunity

Other files attached to CLIFF SPRING EXCLOSURE, newest first.
File Type Posted
Sol_140L1721Q0043_Amd_0001.pdf PDF
Sol_140L1721Q0043.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL INFORMATION AND REQUIREMENTS

PART 1: GENERAL

1.1 SUMMARY:

A. Description of Work: Furnish all labor, equipment, supplies and materials to construct the Cliff Creek Spring (Blue Mtn Spring #4, RIP 200233) exclosure. The work includes installation of four-railed, unpainted continuous pipe fence panels with two wildlife jump-out gates to create an exclosure around the spring source. All work shall be according to the attached specifications, drawings and Work Data Sheet.

B. Location: Work under this Contract is in Moffat County, Colorado. The project site is approximately 21 miles northwest of Rangely, and approximately 5 miles south of the Dinosaur National Monument boundary. The access route will require coordination with BLM Project Lead or Range Management Specialist to ensure access through private lands.

From the Dinosaur National Monument Headquarters on Colorado State Highway 40 at mile marker 5: From State Highway 40 at the Dinosaur Monument Headquarters, turn north onto the paved monument access road, travel 11.6 miles north to MC Road 16, turn west and travel 0.35 mile to where a faint dirt two-track route takes off to the south. Take the dirt two-track and travel 0.4 mile south. Park. The exclosure site is approximately 650 feet to the southeast in the drainage. (see Vicinity Map).

C. Pre-Bid Tour: A pre-bid tour of the site was provided on July 19, 2021. If any vendor would want to see the site again, please contact Matthew Dupire at 970-878-3839.

1.2 REFERENCES:

A. Referenced Specifications/Standards with Abbreviations and/or Acronyms: Wherever acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/standards referred to herein may be procured by the Contractor.

1.3 DEFINITIONS:

A. Approvals: Approval of the submittals is an indication that the Contractor's submittals have been reviewed and that there are no objections, except as noted. Approval of deviations shall apply only to those deviations or omissions from the requirements of the drawings and specifications brought to the Contracting Officer's attention in writing. After approval of an item, the Contractor may submit a substitute for approval when the approved item cannot be purchased or delivered in time to avoid delay in completion of the project.

1.4 SUBMITTALS:

A. Scope: Submittals include design computations, manufacturers' literature and samples.

B. Requirements: Refer to specifications for submittals required. Allow at least 10 working days for review. Submittals shall be delivered to the BLM, White River Field Office, 220 East Market Street, Meeker, CO 81641, Attention: Matt Dupire.

C. Identification of Submittals: Completely identify each submittal by showing at least the following information:

1. Name and address of submitter, plus name and telephone number of the individual to contact for further information.

2. Name of project as it appears in these specifications.

3. Contract number, drawing number, and specification section number to which the submittal applies.

4. Whether this is an original submittal or resubmittal.

5. Each item shall clearly note the manufacturer's name and address, trade name, product, lot, style, color, catalog designation or model number, and locations of use.

1.5 CERTIFICATES OF CONFORMANCE:

A. Requirements: The Contracting Officer may permit use, prior to sampling and testing, of materials when accompanied by Certificates of Conformance. Materials used on the basis of a Certificate of Conformance may be sampled and tested. Installation of materials on the basis of Certificates of Conformance shall not relieve the Contractor of responsibility for incorporating materials which conform to the requirements of the drawings and specifications. Material not conforming to those requirements will be subject to rejection, whether in place or not.

B. Format: The form of the Certificate of Conformance provided by the supplier shall be as follows:

1. The certificate shall state that the named product conforms to the Contract requirements.

2. The certificate shall either be accompanied with a certified copy of the test results or certify that such test results are on file with the manufacturer and will be furnished to the Contracting Officer upon request.

3. The certificate shall provide the name and address of the manufacturer, the testing agency and the date of tests.

4. The certificate shall set forth the means of identification which will permit field determination of the product delivered as being the product covered by the certification.

1.6 QUALITY ASSURANCE:

A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates materials, applications, and tests by reference, with the same force and effect as when they were given in full text.

B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern.

1.7 DELIVERY, STORAGE, AND HANDLING:

A. Delivery: The Contractor shall protect products incorporated into the work from damage while in transit to the site. Products must be delivered in original unopened containers with manufacturer's name, brand designation, and contents legibly indicated.

B. Storage: The Contractor and Contracting Officer will discuss, document and approve acceptable areas and methods for storage. Storage shall comply with the manufacturer's instructions. The storage areas shall permit access for inspection and handling.

C. Handling: The Contractor shall load and unload products in such a manner that protects them from damage until final acceptance.

1.8 PROJECT/SITE CONDITIONS:

A. General: The Contractor should anticipate gentle, rolling terrain with some areas of moderate slope. The exclosure site has moderate slope. The project site lies approximately 650 feet east/southeast of the two-track road. Motorized use will be limited to the existing two-track and to one identified route (determined by COR) from the two-track to the exclosure site, and the 10 ft cleared fence line. Motorized trips between the two-track and the project site will be kept to the absolute minimum needed to accomplish the project. No new road construction will occur.

B. Access to the Work: General access to the project sites shall be along the designated access road, as shown in attached maps and described in Section 1.1 B. ATV and equipment access along the fence alignment is allowed where practical. The Contractor shall anticipate manually packing all necessary equipment and materials into several sections of the worksite.

C. Environmental Considerations: The Contractor shall, to the extent feasible, keep the overall worksite clean and clutter free. Clean-up litter, and all discarded material generated by the construction and dispose of all at an approved sanitary landfill or other location and manner approved by the Contracting Officer.

D. Incidental Operations: Land administered by the Government may be used by the Contractor for incidental operations such as materials storage, equipment, parking, and camping. These areas shall be approved in advance by the Contracting Officer. Environmental considerations of the preceding paragraphs will apply.

1.9 SEQUENCING AND SCHEDULING:

A. Work Schedule: The work schedule shall be submitted at the pre-work conference. When requested, the Contractor shall submit an updated schedule within 3 calendar days.

PART 2: DELIVERABLES

(There are no applicable requirements.)

PART 3: EXECUTION

3.1 PROJECT MEETINGS:

A. Pre-Work Conference:

1. A pre-work conference will be held prior to the start of work. The Contractor will be notified in advance of meeting time, date, and place. The purpose will be to review in detail the required work, project drawings, project specifications, construction schedules, payroll and payments, and administrative provisions of the Contract. The Contractor, subcontractors, and the persons responsible for coordination of the work shall be present at the meeting.

2. The Contractor shall be prepared to summarize and explain procedures planned for the project and submittals requested in the specifications.

B. Progress Meetings:

1. Meetings shall be held at the project site, or as determined by the Contracting Officer.

2. Meetings may be called by either the Contracting Officer or the Contractor. The request shall state who should attend and include an agenda.

C. Final Inspection:

1. The meeting shall be held at the project site, or as determined by the Contracting Officer.

2. The Contractor shall notify the Contracting Officer in writing at least 3 working days before the completion date so the Government can schedule final inspection.

3. The Contractor shall require the superintendent to be present during this inspection.

3.2 WORK LAYOUT:

A. Requirements: The Government will set construction alignment stakes, spray paint, and or flagging for the approximate fence placement. Stakes disturbed or removed during construction shall be reset by the Contractor at the Contractor's expense.

PART 4: MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT:

A. Units: The work described in this section will not be measured for payment.

4.2 BASIS OF PAYMENT:

A. Payment: No direct payment for the work described under this section will be made. The Contractor shall include consideration for this item in the bid price for other items of the Contract.

END OF SECTION

CONTINUOUS PANEL FENCE AND WOOD POLE (WILDLIFE) JUMP-OUT GATES

PART 1: GENERAL

1.1 SUMMARY:

A. Section Includes: Mobilization and demobilization for the Contract. Construction of new continuous panel fence with two, wood pole (wildlife) jump-out gates, as shown in included photos and described herein.

B. Related Sections:

General Information and Requirements

PART 2: PRODUCTS

2.1 CONTRACTOR FURNISHED MATERIALS (all quantities listed below are estimates. Contractor responsible for calculating quantities and providing all materials needed):

A. General: Submittals shall be according to General Information and Requirements. All new fencing materials (no modifications to the factory constructed panels will be allowed) shall be as follows:

Continuous Panel Fence (35 panels total), posts, mounting hardware, end caps, jump-out materials

1. Panels: Manufactured, unaltered unpainted panels, constructed with 1.25 inch 14-gauge pipe. Panels shall have five rails (top, bottom, and three evenly spaced mid-rails). Panels shall be 20 ft long with a total panel height of 48 inches. Rail spacing shall be even between all rails. Panels will include four vertical stays spaced so as when panels are coupled together, there will be 5-foot spacing between the stays.

2. Fencing will be mounted to 6-inch by 8 ft treated wood posts, set at ten-foot spacing to a minimum depth of 36 inches. Post will be set and tamped into the post holes. No driving of wood post will be accepted.

3. Factory mounting brackets shall be provided to attach every rail to each wood post.

4. Couplers/connectors shall be provided for every rail.

5. 5/16 inch x 3 inch galvanized hex-head lag or “Timberlock” screws shall be provided.

Wildlife Jump-Out Structures

1. Eight 6-inch by 8 ft treated wood posts

2. Two 5-inch x 10 ft round treated posts

3. Two 5-inch x 12 ft round treated posts

4. Eight 18-inch x 2-inch x 6-inch treated plank cross-members

5. Thirty-eight 5/16-inch x 6-inch galvanized hex-head lag screws or “Timberlock”. Every cross support shall have two screws with appropriately sized pre-drilled pilot holes.

PART 3: EXECUTION

3.1 MOBILIZATION AND DEMOBILIZATION:

A. Summary: All preparatory costs, work, and operations, including those necessary for the movement of personnel, equipment, supplies and incidentals to and from the project site. Progress payments will be made as follows:

1. Mobilization: When 10% of the total original Contract amount is earned from other Bid Items, 50% of the bid amount for Mobilization and Demobilization will be paid.

2. Demobilization: Upon final inspection and acceptance by the Contracting Officer, the final 50% of the bid amount for Mobilization/Demobilization will be paid.

3.2 PREPARATION:

A. Clearing: Where vegetation clearing is necessary, the Contractor shall clear vegetation with bush-hog mower, chain saws, hand saws or similar, to provide a maximum open width of 10 feet along the new fence alignment. No soil disturbance / bucket work shall occur for line clearing. The absolute minimal amount necessary of soil disturbance / bucket work may occur to lessen grade changes on the upper and lower ends of the exclosure. Woody debris generated by hand clearing shall be placed directly outside the clearing limits, as directed by the Contracting Officer. After the construction of the fence, woody debris will be scattered across any visible OHV tires tracks left near the egress and ingress points in a manner that prevents the future use of this area by OHVs and to promote herbaceous recovery.

B. All Equipment used for fence construction shall be cleaned before it enters the project site to minimize the potential for noxious weeds to be introduced to the project area.

3.3 INSTALLATION:

A. Continuous Fence (see also photos):

1. Fence will be constructed generally as depicted in site map. Exact installation location (fence alignment) may be shifted to optimize placement for function and longevity. Estimated overall length is approximately 640 feet. Panels will be mounted on outside sides of wood posts using mounting brackets and lag screws. No lag screws may be placed in the tops/side of top of posts. The height of the top rail will not exceed 50 inches. The height of the bottom rail will be approximately 2 inches above the ground. Every rail will have a coupler. All corners or open panel ends will have factory end caps installed. Every rail at every post will have a bracket. Every bracket will be attached with two screws. All panels must be parallel to the terrain. At channel crossings panels may need to be installed high enough to allow adequate clearance to prevent debris catching on bottom rail during high flow events. Banks may be cut as needed to establish a functional grade for fence installation. Removed soils shall be spread so no piles remain.

2. Post holes shall be dug or drilled and shall provide adequate open space around the post so backfill can be tamped the full depth around the post. Set posts plumb and to the spacing and grades as shown on the drawings or described herein, unless staked otherwise. Backfill and tamp gradually and uniformly with soil around each post. Compact backfill firmly from the bottom of the hole to the ground surface. Post will not be driven into the ground.

3. Wood Posts: Wood posts will be spaced at 10-ft intervals. All posts will be buried no less than 36 inches. Posts shall be installed plumb and in a straight line along the alignment. Corners will be constructed to minimize or prevent rail ends from protruding to reduce hazards and livestock rubbing. Panel end caps will be installed in all “open” panel ends.

B. Wildlife Jump out Gate (see photos below, taken from Montana Fish, Wildlife & Parks “Landowner’s Guide to Wildlife Friendly Fences” Second edition, 2012): One ten-foot wide opening jump out gate will be installed in the north 1/3 of the long west side. One eight-foot wide opening jump-out will be installed in the approximate mid-point of the east side. Wood up-right posts will be buried at a depth of no less than 30 inches. The top rail of jump out gates will be no higher than 36 inches and the bottom rail no lower than 18 inches. There will be a 10-inch spacing between the bottom and top rail (see attached diagram, Figures 1 and 2 and following detailed description: Rails will be attached so that the bottom of the bottom rail sits 18 inches above the ground and the top of the bottom rail sits 22 inches above the ground. There will be a 10-inch spacing between the top of the bottom rail and the bottom of the top rail so that the bottom of the top rail sits 32 inches above the ground. The top of the top rail will sit 36 inches above the ground). The rails will rest on cross-members lag screwed onto the wood upright posts. Wood horizontal rails will be wired in place using heavy gauge tie-wire.

Figures 1: Wildlife Jump-out Gate

Figure 2: Wildlife Jump-out Gate

PART 4: MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT:

A. Units: The work described as mobilization/demobilization will be measured and paid for on a lump sum basis once you are mobilized onto the site (10%). The remainder of the price (90%) will be paid upon satisfactory completion of the project.

4.2 BASIS OF PAYMENT:

A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:

1. Mobilization/demobilization 10% of contract price paid once on site.

2. Fence construction 90% Paid upon satisfactory completion of the project.

PART 5: OTHER TERMS AND CONDITIONS

5.1 TERMS AND CONDITIONS

A. All fence construction will cease when soils or road surfaces are saturated to a depth of 3 inches.

B. The BLM Project Lead and Contractor is responsible for informing all persons who are associated with the project that they will be subject to prosecution for knowingly disturbing archaeological sites or for collecting artifacts.

C. If any archaeological materials are discovered because of operations under this authorization, activity in the vicinity of the discovery will cease, and the Contracting Officer (CO) or Contracting Officer Representative (COR). Work may not resume at that location until approved by the CO. The Contractor will make every effort to protect the site from further impacts including looting, erosion, or other human or natural damage until BLM determines a treatment approach, and the treatment is completed. Unless previously determined in treatment plans or agreements, BLM will evaluate the cultural resources and, in consultation with the State Historic Preservation Office (SHPO), select the appropriate mitigation option within 48 hours of the discovery. The Contractor, under guidance of the BLM, will implement the mitigation in a timely manner. The process will be fully documented in reports, site forms, maps, drawings, and photographs. The BLM will forward documentation to the SHPO for review and concurrence.

D. Pursuant to 43 CFR 10.4(g), the Contractor must notify the CO or COR, by telephone and written confirmation, immediately upon the discovery of human remains, funerary items, sacred objects, or objects of cultural patrimony. Further, pursuant to 43 CFR 10.4(c) and (d), the Contractor must stop activities in the vicinity of the discovery and protect it for 30 days or until notified to proceed by the AO.

E. After the construction of the fence, any woody debris will be scattered across any visible OHV tires tracks left near the egress and ingress points in a manner that prevents the future use of this area by OHVs.

F. The Project Lead and/or Contractor is responsible for informing all persons who are associated with the project operations that they will be subject to prosecution for disturbing or collecting vertebrate or other scientifically important fossils, collecting large amounts of petrified wood (over 25 lbs./day, up to 250 lbs./year), or collecting fossils for commercial purpose on public lands.

G. If any paleontological resources are discovered as a result of operations under this authorization, the Project Lead and/or Contractor or any of his agents must stop work immediately at that site, immediately contact the BLM Paleontology Coordinator, and make every effort to protect the site from further impacts, including looting, erosion, or other human or natural damage. Work may not resume at that location until approved by the AO. The BLM or designated paleontologist will evaluate the discovery and take action to protect or remove the resource within 10 working days. Within 10 days, the Project Lead and/or Contractor will be allowed to continue construction through the site or will be given the choice of either (a) following the Paleontology Coordinator’s instructions for stabilizing the fossil resource in place and avoiding further disturbance to the fossil resource, or (b) following the Paleontology Coordinator’s instructions for mitigating impacts to the fossil resource prior to continuing construction through the project area.

H. Fence construction will take place between July 15 and October 15, 2021. This timeframe would avoid the greater sage-grouse and migratory bird nesting period and would allow for fence construction to be completed prior to big game rifle season.

END OF SECTION

Site Location Map

General Project Site:

Cliff Creek Spring Exclosure Site overview:

image3.jpg image4.jpeg image5.jpg image1.JPG image2.JPG

File details come from the government source that posted it. Updated .