This document is an AML Redding Bid Schedule that outlines 16 line items for a mining-related project. The work items include various mining and residential infrastructure components such as a Swasey Shaft, multiple residential structures, storage structures, adits, mining equipment, an ore processing structure, and supporting facilities like an outhouse, campsite, and boneyard area. Each item is listed with a quantity of 1 and is priced as a lump sum, though specific dollar amounts are not filled in on this bid schedule. The total project scope appears to involve site preparation, infrastructure development, and potentially historical preservation or archaeological documentation of a mining location.

View the file

Other files for this federal contract opportunity

Other files attached to REDDING AML 2025, newest first.
File Type Posted
Redding_AML_Site_Visit_Questions_and_Answers_0001.pdf PDF
Attachment_No__1_SOW_AML_updated_0001.pdf PDF
Sol_140L1225Q0055_Amd_0001.pdf PDF
Attachment_No__3_Updated_Bid_Sheet_0001.pdf PDF
B08_Attach_2__WD.pdf PDF
Sol_140L1225Q0055.pdf PDF
B08_Attach_1_SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AML Redding Bid Schedule Item

# Work Item Quantity Unit Cost 1 Swasey Shaft 1 Lump Sum $ 2 Residential structure 1 1 Lump Sum $ 3 Storage Structure 1 Lump Sum $ 4 Workshop/Storage Shed 1 Lump Sum $ 5 Adit 1 1 Lump Sum $ 6 Miscellaneous Mining Equipment 1 Lump Sum $ 7 acResidential Structure 2 w/ attached travel trailer 1 Lump Sum $ 8 Outhouse 1 Lump Sum $ 9 Boneyard Area 1 Lump Sum $ 10 Log structure/Generator or pumphouse 1 Lump Sum $ 11 Dumpsite 1 Lump Sum $ 12 Collapsed Outhouse 1 Lump Sum $ 13 Campsite 1 Lump Sum $ 14 Residential Structure 3 1 Lump Sum $ 15 Ore Processing Structure 1 Lump Sum $ 16 Adit 2 1 Lump Sum $