This document is a Scope of Work (SOW) for a federal contract opportunity to provide steel pipes and accessories for the Palmas Fire Waterline Repair Project. The Bureau of Land Management (BLM) is seeking a contractor to furnish labor, equipment, supplies, and materials to complete the necessary work. The required steel pipes must conform to ASTM A53 Grade B, have epoxy lining and coating, and be delivered in various lengths with 150# ANSI FFSO flanges. Additional items include 6-inch elbows with flanges. The contractor must deliver all products within 10 weeks after contract award, with a final deadline of September 6, 2024. The delivery location is the Dos Palmas Preserve in Riverside County, California. The related federal contract opportunity is Solicitation Number 140L1224Q0048, "Purchase of DOS PALMAS PRESERVE WATER PIPELINES" issued by the Department of the Interior Bureau of Land Management California Region.

View the file

Other files

File Type Posted
B08_Attachment_2_Price_Schedule_0001.docx DOCX document
Sol_140L1224Q0048_Amd_0001.pdf PDF
Sol_140L1224Q0048.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work or Services:

OBJECTIVE:

The Bureau of Land Management (BLM) seeks a contractor/vendor to provide steel pipes and accessories for the Palmas Fire Waterline Repair Project. The pipelines provide water to an endangered desert pupfish, migratory birds, and other wildlife. As summer weather approaches, there’s an urgency and need to repair and replace damaged pipelines with new steel pipes and water flowing sufficiently to sustain water level in the pond systems. All steel pipes and accessories shall be delivered to the BLM Dos Palmas Preserve east of Mecca, CA near the

Salton Sea in Riverside County, CA.

A. Description of Work: Furnishing labor, equipment, supplies, and material, to complete the necessary work as described.

➢ All materials must be domestic; Made in America.

➢ All steel pipes must conform to ASTM A53 Grade B.

➢ Epoxy lining and Coating must conform to AWWA C210.

➢ Epoxy must be Devoe Bar-Rust 233H or approved equal. Color will be determined by the BLM.

1. must be acceptable for potable water use.

➢ Pipes fabrication must conform to AWWA C208 and AWS D1.1.

➢ Flanges must conform to ANSI B16.5/AWWA C207.

1. 6-5/8" Outside Diameter (OD) standard (std) weight (wt) ASTM A53 Grade B

Schedule (Schd) 40 Steel Pipe. 16 mil epoxy lined and coated with 150# ANSI

FFSO flanges welded on both ends. 20-ft length.

2. 6-5/8" OD std wt ASTM A53 Grade B Schd 40 Steel Pipe. 16 mil epoxy lined and coated with 150# ANSI FFSO flanges welded on both ends. 10-ft length.

3. 6-5/8" OD std wt ASTM A53 Grade B Schd 40 Steel Pipe. 16 mil epoxy lined and coated with 150# ANSI FFSO flanges welded on both ends. 8-ft length.

4. 6-5/8" OD std wt ASTM A53 Grade B Schd 40 Steel Pipe. 16 mil epoxy lined and coated with 150# ANSI FFSO flanges welded on both ends. 4-ft length.

5. 6-5/8" OD std wt ASTM A53 Grade B Schd 40 Steel Pipe. 16 mil epoxy lined and coated with 150# ANSI FFSO flange welded on ONE end. 3-ft length.

6. 6-5/8" OD std wt ASTM A53 Grade B Schd 40 Steel Pipe. 16 mil epoxy lined and coated with 150# ANSI FFSO flanges welded on both ends. 2-ft length.

7. 6-5/8" OD std wt ASTM A53 Grade B Schd 40 Steel Pipe. 16 mil epoxy lined and coated with 150# ANSI FFSO flange welded on ONE end. 2-ft length.

8. 6-5/8" OD std wt ASTM A53 Grade B Schd 40 Steel Pipe. 16 mil epoxy lined and coated with 150# ANSI FFSO flanges welded on both ends. 1-ft length.

9. 6" std wt 45° elbow with 150# ANSI FFSO flanges welded on both ends.

Epoxy lined and coated.

10. 6" std wt 22.5° elbow with 150# ANSI FFSO flanges welded on both ends.

Epoxy lined and coated.

PERFORMANCE PERIOD:

Contractor will have 10 weeks after contract award to deliver all steel pipes and accessories with

NO weekend delivery unless prior arrangement has been made and approved by BLM POC. All deliveries must be made by September 6th, 2024. (this date is estimated)

DELIVERY LOCATION:

Dos Palmas Preserve

Lat/Long: 33.499790, -115.831666

BLM crew will be responsible for unloading pipes.