Amendment_No_0002_0002.pdf

PDF 204 KB Posted

Attached to
AML PINTO MOUNTAIN #2 Federal contract opportunity
Solicitation number
140L1222R0005
Issued by
Department of the Interior Bureau of Land Management California Region

About this file

This document is an amendment to a solicitation for the 2022 Pinto Mountain AML Remediation Project #2 being conducted by the California Desert District of the Bureau of Land Management. The amendment adds two additional mine features, identified as items 17 and 18, to the statement of work task item list that are located within several hundred yards of a mine already planned for remediation. It also changes the requirements for contract line item numbers 9 and 14 from installing air grates to backfilling the shafts, as the shafts are determined to be shallow enough to warrant backfilling rather than grating. A new price schedule is required to be submitted to account for these changes. The total estimated price for all 18 contract line items is being solicited.

View the file

Other files for this federal contract opportunity

Other files attached to AML PINTO MOUNTAIN #2, newest first.
File Type Posted
Sol_140L1222R0005_Amd_0002.pdf PDF
Amendment_No_0001_-_Sol_140L1222R0005_0001.pdf PDF
Sol_140L1222R0005_Amd_0001.pdf PDF
Sol_140L1222R0005.pdf PDF
B08_Sol_No__140L1222R00005.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2022 Pinto Mountain AML Remediation Project 2

California Desert District

Statement of Work Amendment

Updated Q&A

Q: Will BLM be adding the two additional features on the job walk?

A: During the pre-bid job walk two additional mine features were discovered within several hundred yards of a mine planned for remediation. The two additional features have been added in the SOW Task Item List as items 17 and 18 (bold/italics).

Q: Will we use the existing price schedule

A: NO. A new one will be posted with the Amendment 0001

Q: Is the government changing CLINs 9 and 14 from Air Grate to Backfill?

A: Yes; the shafts are shallow enough to warrant a backfill.

CONTINUATION OF

SECTION B - SUPPLIES OR SERVICES AND PRICES

B.1 PRICE SCHEDULES

(a) The contractor shall, except as otherwise noted, provide all necessary labor, equipment, materials, supplies, transportation, travel, and per diem necessary to perform the work specified in the attached Performance

Work Statement.

(b) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.

(c) Offers are subject to the terms and conditions of this solicitation.

(d) Definitions: CLIN – Contract Line-Item Number.

CLIN Description of Work Quantity Unit Unit Cost

1 Shaft - Raised Air Grate LS 1 $

2 Shaft - Raised Air Grate LS 1 $

3 Adit - Bat Gate LS 1 $

4 Shaft - Raised Air Grate LS 1 $

5 Shaft - Raised Air Grate LS 1 $

6 Shaft - Raised Air Grate LS 1 $

7 Shaft - Raised Air Grate LS 1 $

8 Shaft - Raised Air Grate LS 1 $

9 Backfill LS 1 $

10 Trench - Air Grate LS 1 $

11 Shaft - Raised Air Grate LS 1 $

12 Shaft - Raised Air Grate LS 1 $

13 Shaft - Raised Air Grate LS 1 $

14 Backfill LS 1 $

15 Adit - Bat Gate LS 1 $

16 Shaft - Raised Air Grate LS 1 $

17 Shaft - Raised Air Grate LS 1 $

18 Backfill LS 1 $

TOTAL FOR SCHEDULE $_________________

(END OF SECTION)

File details come from the government source that posted it. Updated .